(a) All ponds and pond dams that are hereafter constructed in the county will have at least a 20-foot setback requirement from all existing county road rights-of-way, and the spillway and runaround will be constructed and maintained to handle all water flowing therefrom. (b) Should a pond be built which requires the county to install pipes, culvert, bridge or construction for handling the water, the expense will be borne by the landowner constructing the pond.