Skip to content
Georgia Commons
Menu

Cook County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 58 - SUBDIVISIONS / Article II - PLAT REVIEW

Sec. 58-54. Final plat.

About this text

  • As published by Municode, current through 2020-04-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Conformance with preliminary plat. The final plat shall conform with the preliminary plat. If desired by the subdivider, he may submit only that portion of the preliminary plat he proposes to record and develop at that time; provided, however, that such portion conforms with all requirements of this chapter. The record plat is to be prepared and sealed by a registered design professional, licensed in the state. No plat of a land subdivision shall be recorded unless the plat conforms to the county zoning ordinance and the acceptance of the required guarantee by the board of commissioners.

(b) Filing. Filing the final plat with the building and zoning official shall include the following:

(1) A letter of application shall contain:

a. The name and address of the persons developing the subdivision and his agents;

b. Zoning of the property to be subdivided;

c. Whether or not the subdivision will be developed in phases;

d. Plans for serving the proposed subdivision with sewer and water facilities.

(2) A complete list of deviations, if any, from the preliminary plat.

(3) A certified copy of all private covenants or deed restrictions, if any, pertaining to land within the subdivision.

(4) A copy of the agreement for providing the necessary water and sewer facilities.

(5) A fee to cover the cost of investigation and review of the preliminary plan, construction plans, the final plat and final recording costs will be charged at time of application. The fees are as set by the board of commissioners.

(6) The original reproducible on plastic or linen and five blueline prints of the final plat, which will include the following:

a. Sheet design. The final plat shall conform to the items listed under the preliminary plat (section 58-52(c)(1), (c)(2), (c)(4), (c)(5) and (c)(7)) and the requirements thereof, as set forth in this chapter and shall be drawn in black India ink on one or more sheets of linen tracing cloth or Mylar film measuring 18 inches by 24 inches. When two or more sheets are used, a key map shall be shown on each sheet. There shall be a two-inch margin on the left end of the plat and a one-half-inch margin on the remaining three sides. A revision to a recorded plat shall be drawn in black India ink on the same type cloth or film as mentioned above. The final plat shall be drawn on the scale (stated and graphical) of one inch in 100 feet. If necessary, more than one sheet may be used as long as a key map is provided to relate each sheet to the entire platted area.

b. Surveyor certificate.

1. The following certificate shall be entered on the face of the plat. Placement of this certificate may vary as necessary:

I certify that all measurements are correct and were prepared from an actual survey of the property made under my supervision; the field data upon which this plat is based has a closure precision of one foot in

feet and an angular error of per angle point, and was adjusted using rule; the plat has been calculated for closure and is found to be accurate within one foot in feet; monument and pin locations are correctly shown by the symbols and the pins are (type of metallic material and length).

Signed (Seal) (Date) Surveyor, Georgia Registration No.

2. The surveyor must certify whether or not the property is located in a special flood hazard zone and indicate the informational source and zone of the property. If the property is located within a flood hazard zone then the limits of the zone must be shown.

c. Owner certificate. The following certificate shall be entered on the face of the plat as shown in Figure 1. Placement of this certificate may vary as necessary:

We, the undersigned owner(s) and/or mortgagee(s) of the Subdivision, hereby offer to dedicate and/or reserve for public use the rights-ofway, easements and other ground as shown on this plat.

Owner Date Mortgage Date _______________________ ____________ _______________________ ____________ _______________________ ____________ _______________________ ____________

d. Approvals. The following spaces shall be provided in the form listed below for review by all agencies having jurisdiction. Placement on plat may vary:

Approved by the Board of Health, Cook County, Georgia.

Date ____________ Signed ________________________________________________ Health Department Representative

Approved by County Engineer, Cook County, Georgia.

Date ____________ Signed ________________________________________________ County Engineer

Approved by the Cook County Road Superintendent.

Date ____________ Signed ________________________________________________ Road Superintendent

Approved by the Greater Cook County Planning Commission.

Date ____________ Signed ________________________________________________ Chairman

e. Surveying data. The final plat shall contain the location, bearing and length of every street line, lot line and boundary line, whether curved or straight. A note will be made on the plat as to whether curved or straight. A note will be made on the plat as to whether curved dimensions are arch or chord distances. Easement lines (and width), land lot and land district lines will be shown. All dimensions shall be shown in feet and decimals to the nearest 0.01 of a foot, and all angles shall be shown to the nearest second. The error of closure shall be as set forth in the Georgia Platting Act, or as defined by the technical standards required by O.C.G.A. § 43-15-1 et seq. of the Law Governing the Practice of Professional Engineering and Surveying (1980), as amended. The final plat shall have a note listing the following:

Total Acres Total Lots Note: Distances shown are scaled.

f. Monuments. The final plat shall show the accurate location, material and description of all monuments. A permanent master benchmark shall be established (subject to the approval of the county engineer) within or adjacent to the site by transfer of levels, not less than third order accuracy, from the nearest approved benchmark of known mean sea level (MSL) elevation showing its location on the final plat and recording its elevation on the final plat to the nearest 0.01 of a foot.

g. Easements. In addition to the requirements for the preliminary plat as set forth in section 58-52(c)(4), the final plat will show the location and width of all temporary construction easements (as required by standard engineering practice), public utility easements and drainage easements, where required.

h. Improvement plan. At such time as the final plat is filed for review with the building and zoning official, the subdivider shall submit improvement plans to the road superintendent and county engineer for review and approval if not previously approved. Construction drawings shall conform to county specifications.

(c) Filing certificate. The final plat shall be deemed filed with the planning commission when it is filed with the building and zoning official. At the time of filing, a certificate of filing shall be furnished the applicant which will include the time and date of filing. The final plat shall be prepared in accordance with this chapter and applicable county requirements by a registered land surveyor, who is licensed under the laws of the state. The building and zoning official and county engineer shall have authority to reject the final plat if they find that it does not conform with the preliminary plat or this chapter. If the plat is rejected, the building and zoning official shall provide the subdivider with a written statement specifying all the respects in which it does not conform. Filing the final plat shall be accomplished at least 15 working days prior to the regular planning commission meeting at which it is to be considered.

(d) Approval by individual agencies. No final plat shall be approved unless the planning commission first obtains concurrence of the county health department, the county engineer, road superintendent and any affected local jurisdiction providing utility services. Such agencies shall review, with or without modification, or disapprove the final plat to the extent to which each has jurisdiction. Within ten working days of time of submittal, the developer will be notified of approval or disapproval. If disapproved, reasons for denial shall be noted.

(e) Building and zoning official review. The building and zoning official, with assistance from the county's planning advisor, shall review the final plat for technical compliance with the county land subdivision ordinance, zoning ordinance, comprehensive plan and other county ordinances that might impact on the proposed land subdivision. This review shall be submitted to the planning commission along with the review of the respective agencies having jurisdiction.

(f) Coordination. It shall be the responsibility of the building and zoning official to ensure that the respective reviews of the county engineer, road superintendent and board of health are brought together in a timely fashion for proper presentation to the planning commission.

(g) Review by planning commission. Review of the proposed final subdivision plat shall be made by the planning commission at its next regular meeting. The building and zoning official shall be responsible for coordination of information to be brought before the planning commission, which at a minimum, shall include the recommendations of the road superintendent, county engineer and the health department. The planning commission may grant final approval or may deny the plat if it does not meet standards.

(h) Recording a plat. Upon satisfactory compliance with this chapter, and after review by the planning commission, the final plat will be forwarded to the county administrator to retain until such time that all required minimum improvements have been completed, inspected and approved by the county, and the required guarantee has been posted. At such time the county administrator shall release the final plat for recording. The plat shall be returned to the building and zoning official who shall record the plat in a timely manner.

(i) Performance bonding in lieu of completion of minimum improvements. Upon the county commission's approval, a developer may choose to post a performance bond in the form of a commercial irrevocable letter of credit or a certified check, drawn on a banking institution operating within the state, in lieu of completion of minimum improvements. In any such case, the performance bond shall be in the amount of 125 percent of the proposed improvements costs as reviewed by the county engineer and accepted by the board of commissioners. The required guarantee (see section 58-173) must be posted prior to release of the performance bond.

(j) Revision to a recorded plat. Proposed revisions to a recorded plat which do not affect platted rights-of-way may be submitted for administrative approval in accord with the provisions of section 58-53. In addition, a revision to a recorded plat shall show the name, phase (if any), date of the recorded subdivision plat being revised, and the exact citation with regard to the county land records and the book and page number wherein said plat is recorded.

Revisions to a recorded plat which involve platted rights-of-way or other major changes shall be submitted as a preliminary plat.

(k) Distribution. The building and zoning official shall make the following distribution of prints and reproducibles:

Clerk of court (Recording copies) Original linen or plastic reproducible and one print County engineer One print and one reproducible Road superintendent One print and one reproducible Building and zoning official One print County fire coordinator One print County tax assessor One print County health department Two prints Sheriff's department One print Servicing telephone company One print Servicing electrical utility company One print Cable TV company One print Emergency medical services One print Civil defense director One print Board of education One print Post office One reproducible and two prints Planning commission One reproducible and two prints Affected local jurisdiction providing utility services One reproducible and two prints

(l) Administrative review of small subdivisions and resubdivisions. Where a proposed subdivision presents no engineering problems, no required improvements, and few, if any, planning problems, the building and zoning official may waive the requirements of filing a preliminary plat and may recommend review of the final plat to the planning commission. In addition, where located on an existing road or street, the combination or recombination of previously platted lots, where the total number of lots does not increase, and the resultant lots are equal to the current standards of the county shall also be subject to administrative review.

Such plats shall conform fully to the requirements of this chapter. It shall be the responsibility of the building and zoning official to coordinate such administrative review responsibilities.

History

The history line the source prints at the end of the section.

(Ord. of 7-7-1997, § 4-3)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cook-county/code/58-54@2020-04-06-2c6f9f7b40

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Cook County Code of Ordinances, Sec. 58-54. Final plat | Georgia Commons