(a) Water quantity and quality controls will be provided as part of all development pursuant to the provisions of the county soil erosion and sediment control ordinance and ordinances regulating post-development stormwater management for new development and redevelopment. (b) The director may allow stormwater runoff that otherwise is unacceptable quantity or quality or which would be discharged in volumes or rates in excess of those otherwise allowed by the county soil erosion and sediment control ordinance and ordinances regulating post-development stormwater management for new development and redevelopment to be discharged into drainage facilities off-site of the development, provided the following conditions are met: (1) Off site drainage facilities and channels leading to them are designed, constructed and maintained in accordance with the requirements of the county soil erosion and sediment control ordinance and the ordinances regulating post-development stormwater management for new development and redevelopment. (2) Adequate provision is made for sharing of construction, maintenance and operating costs of such facilities. (3) If it is not feasible to completely manage runoff on-site in a manner that meets the design and performance standards found in the county soil erosion and sedimentation control and development regulation design manuals.