In addition to those requirements listed in section 78-38, all alternative on-site management system, as defined in this article shall meet the following requirements: (1) The building site must have 100 percent replacement area of the alternative system if a reduction in linear footage is proposed and a 100 percent conventional replacement area. (2) The site evaluation must be accompanied by an individual soil report by an approved soil scientist before reduction in linear feet will be considered. (3) Warranties for alternative products will be supplied by the manufacturer for a minimum of two years for each installation and will be signed and dated by new property owner at closing. The product manufacturer shall sign and file with the Environmental Health Department an affidavit acceptable to the Environmental Health Department stating that a manufacturers representative will deliver and review the warranty with the property owner.