Skip to content
Georgia Commons
Menu

Crisp County · Code of Ordinances

Part II - THE CODE / Chapter 66 - UTILITIES / Article II - WATER RATES AND SERVICE RULES

Sec. 66-36. Consumer's responsibility and liability.

About this text

  • As published by Municode, current through 2018-08-13
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Water furnished by the county shall be used for consumption by the consumer, members of his household and employees only. The consumer shall not sell water to any other person or permit any other person to use such water. Water shall not be used for irrigation, fire protection, nor other purposes, except when water is available in sufficient quantity without interfering with the regular domestic consumption in the area served. Disregard for this rule shall be sufficient cause for refusal and/or discontinuance of service.

(1) Where a meter or meter box is placed on the premises of a consumer, a suitable place shall be provided by the consumer therefor, unobstructed and accessible at all times to the meter reader.

(2) The consumer shall furnish and maintain a private cutoff valve on the consumer's side of the meter.

(3) The consumer's piping and apparatus shall be installed and maintained by the consumer at the consumer's expense, in a safe and efficient manner, and in accordance with the sanitary regulations of the state health department.

(4) In order to be received as a consumer and entitled to receive water from the county water system, all applicants must offer proof that any private wells located on their property are not physically connected to the lines of the county water system and all applicants by becoming consumers of the county, covenant and agree that so long as they continue to be consumers of the county they will not permit the connection of any private wells on their property to the county water system.

(5) Prior to the installation of water lines, a developer is required to provide the county with an acceptable layout plan and specifications for construction utility and specifications for construction utilizing and tendering an acceptable water line easement.

During construction, it is necessary for the county to make periodic inspections and to observe the pressure testing when water is placed in lines. Upon approval by the county of the plans, specifications, tests and acceptance of the water line easement, the county will accept the water mains for maintenance and will operate same in accordance with the rights granted in the respective water line easement subject to all other rights and reservations contained in this article. The substance of this provision was adopted by the board of commissioners by its action of May 14, 1996, and shall continue and be in full force and effect upon adoption of this article.

History

The history line the source prints at the end of the section.

(Res. of 7-1-1996, § 6)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:crisp-county/code/66-36@2018-08-13-202cf5a54c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Crisp County Code of Ordinances, Sec. 66-36. Consumer's responsibility and liability | Georgia Commons