--- title: Dade County Code of Ordinances, Sec. 18-69. Inspection prior to service collection: local-codes id: local-code:dade-county/code/18-69 cite_as: Dade County, Ga., Code of Ordinances § 18-69 canonical_url: https://georgiacommons.org/counties/dade/code/18-69 md_url: https://georgiacommons.org/counties/dade/code/18-69.md text_url: https://georgiacommons.org/counties/dade/code/18-69/text source_url: https://library.municode.com/ga/dade_county/codes/code_of_ordinances date: 2024-09-05 status: active jurisdiction: county:dade jurisdiction_name: Dade County county_fips: "13083" corpus_version: local-codes-dade-county-8854a49190d7 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/dade/code/~part-ii/~chapter-18/~article-iii.md previous: https://georgiacommons.org/counties/dade/code/18-68.md next: https://georgiacommons.org/counties/dade/code/18-70.md index: https://georgiacommons.org/counties/dade.md branch: code edition: As published by Municode, current through 2024-09-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:dade-county/code/18-69@2024-09-05-d51d7de7ec --- # Dade County Code of Ordinances, Sec. 18-69. Inspection prior to service > As published by Municode, current through 2024-09-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article III - ELECTRICAL INSPECTIONS (a) After the effective date of the ordinance from which this article is derived, suppliers of electrical power shall not provide temporary electrical service to any construction site for any proposed structure requiring electrical power until such time as the county electrical inspector has inspected and approved the electrical service entrance from the power supplier's point of attachment to the customer's temporary breaker box. The inspection and approval shall be evidenced by the attachment of a numbered, signed and dated county electrical inspection certificate to the meter base. (b) After the effective date of the ordinance from which this article is derived, suppliers of electrical power shall not provide permanent electrical service to any structure requiring electrical power until such time as the county electrical inspector has inspected and approved the electrical service entrance from the power supplier's point of attachment to the customer's breaker box. The inspection and approval shall be evidenced by the attachment of a numbered, signed and dated county electrical inspection certificate to the meter base. (c) After the effective date of the ordinance from which this article is derived, suppliers of electrical power shall not provide electrical service to any manufactured home or modular home requiring electrical power until such time as the county electrical inspector has inspected and approved the electrical service entrance from the power supplier's point of attachment to the customer's breaker box. The inspection and approval shall be evidenced by the attachment of a numbered, signed and dated county electrical inspection certificate to the meter base. (d) After the effective date of the ordinance from which this article is derived, temporary and/or permanent electrical utility connections for structures, manufactured homes or modular homes which are subject to the terms of this article are prohibited until such time as a duly authorized county electrical inspection certificate is affixed to the meter base by the county electrical inspector. ## History (Ord. No. O-2-97, § IV, 9-4-1997)