(a) A permit shall be required before connecting a driveway to county roads or before installing driveway pipe in the county road rights-of-way. This requirement shall be applicable to all driveways located in the county, whether the driveways be for residential, commercial, temporary, or permanent use, and shall include without limitation access driveways. (b) Drainage ditches along county road rights-of-way shall not be temporarily filled for access to building sites. No debris, excavation, building materials or other such things shall be placed on the county right-of-way at the construction sites.