Sec. 38-31. Subdivision development roads and rights-of-way.

About this text

  • As published by Municode, current through 2024-09-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Subdivision development roads and rights-of-way proposals shall meet the following requirements:

(1) Proposals must be platted with base flood elevation data certified by a licensed surveyor.

(2) The development must have a minimum six-inch water main available for all lots if public water is available. Fire hydrants must be installed within one thousand (1,000) feet of any planned development.

(3) Drainage slopes must include adequate structures of concrete or metal culverts and drainage ditches which are a minimum of fifteen (15) inches deep.

(4) Access of a minimum of three (3) lots or five (5) mobile home lots for every one-third (!) of a mile.

(5) The development must have a dedicated sixty-foot right-of-way, thirty (30) feet each side of a road centerline; minimum twenty-four-foot roadbed with a five-foot shoulder on each side and thirteen (13) feet on each side available to ensure proper space for slopes, fills, drainage and utilities, for maintenance.

(6) Curbs and guttering are required if the development is designed with a fifty-foot right-of-way. The roadbed must be twenty-eight (28) feet, including curb and guttering, with eleven (11) feet each side available for utilities, slopes and shoulders, for maintenance.

(7) Eight (8) inches of compacted base which shall consist of six (6) inches of chert and two

(2) inches of stone.

(8) The roadbed shall be graded smooth with minimum cuts or outcroppings.

(9) If the grade is less than six percent (6%), the roadbed shall be made of asphalt with two-inch E-mix. If the grade is higher than six percent (6%), a nonskid mix must be approved by the county road superintendent.

(10) Entry to a public road should be at a ninety-degree angle, where possible; however, the angle shall not exceed sixty (60) degrees. A landing for sixty (60) feet is required at no more than a two percent (2%) grade.

(11) A minimum of three (3) inspections must be completed by the county road superintendent at stages of development critical to excellent road construction. Final inspection will be after twelve (12) months.

History

The history line the source prints at the end of the section.

(Res. No. R 1-95, § I, 1-5-1995)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:dade-county/code/38-31@2024-09-05-8c53d0954d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Dade County Code of Ordinances, Sec. 38-31. Subdivision development roads and rights-of-way | Georgia Commons