Existing county road extensions (dead-end roads) shall have the following requirements: (1) No utility relocations by the county. (2) A minimum of a sixty-foot clear right-of-way deeded to the county, fee simple, after the twelve-month final inspection, and subsequent approval. (3) The surface of the roadbed must conform to or exceed existing roadbed specifications as follows: a. Six (6) inches of chert plus two (2) inches of stone or six (6) inches of compacted aggregate base. b. Triple surface treatment according to county specifications. c. The county road superintendent shall inspect the roadbed a minimum of two (2) times during construction. d. The cul-de-sac shall be completed using roadbed and surface requirements as required by county specifications and shall have a minimum radius of fifty (50) feet. Additionally, the minimum radius of the right-of-way for the cul-de-sac shall be sixty-three (63) feet.