Each utility with facilities located on county roads or rights-of-way shall furnish the department of roads with a map or drawing showing the county roads or rights-of-way on which the utility's facilities are located, and shall furnish the map or drawing within sixty (60) days if the same is requested by the director of public works. Each utility furnishing such map to the director of public works shall be entitled to receive notice from the director of public works before the issuance of any permit to another utility for construction work that might, in the opinion of the director of public works, effect the operations or services of the utility so notified. The applicant for any permit, upon request of any utility so notified, shall meet with such utility at the proposed location of construction work and review the proposed construction work as set out in the application.