Dade County · Code of Ordinances

Part II - CODE / Chapter 49 - SUBDIVISIONS / Article I - IN GENERAL

Sec. 49-5. Plat review and approval procedure.

About this text

  • As published by Municode, current through 2024-09-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The prospective sub-divider is strongly encouraged to meet early and informally with the code enforcement official to obtain advice and assistance before conducting any land disturbance or preparing the preliminary plat. This will enable the sub-divider to become familiar with federal, state, and county standards for subdividing land and constructing improvements, detailed procedures for plat approval, and the conditions under which the county will accept new public roads and utilities.

The procedure for approval of a subdivision plat consists of two (2) separate steps. The initial step is the preparation and submission to the code enforcement officer, prior to making any street improvements or installations of utilities, of a preliminary plat of the proposed subdivision prepared by a Georgia registered surveyor in a form acceptable to the county.

The second step is submission of a final plat, together with the required certificates, as the preliminary plat or portions of it are constructed or included in the letter of credit. The final plat shall conform substantially to the preliminary plat as approved, and shall be in a form acceptable to the code enforcement officer. This final plat, upon approval, shall be recorded as the official plat of record in the office of the clerk of the superior court of Dade County within ten (10) days of its signing by the code enforcement officer.

Preliminary plat requirements. The preliminary plat for all subdivisions shall meet the minimum standards of design and the general requirements set forth in the State of Georgia Department of Human Resources Regulations for Subdivision and Mobile Home Parks and the Department's Manual for On-Site Sewage Management Systems, as may be amended by the State of Georgia from time to time. Additionally, the Preliminary Plat shall include a plat of the subdivision drawn at a scale of not more than one (1) inch equals one hundred (100) feet, and showing the following:

(a) Street plan, including the location of all existing and proposed streets within the subdivision and adjacent to it; widths and purpose of existing and proposed rights-of-way and easements; identification of right-of-way location and width for any street which is considered part of the sketch thoroughfare plan; proposed street names subject to approval; and typical cross section of proposed streets, showing natural and finished grades;

(b) Feasible connections to existing or proposed utility systems and any proposed improvements requested of the county;

(c) Plans of all proposed utility layouts and easement, including but not limited to a preliminary plan of sanitary sewage systems, with grade, pipe size and points of discharge;

preliminary plan of the water supply system, with pipe sizes and location of hydrants;

preliminary plan of the storm sewer system, with grade, pipe sizes and location of outlets; and preliminary plan of the location of all communication systems; preliminary plan for gas and electricity supply systems; and

(d) Location and dimension of land to be dedicated or reserved for parks, open space or other public use.

Within forty-five (45) days after the submission of the preliminary plat, the code enforcement office shall review the plat with pertinent utilities, county departments, and other governmental entities, and indicate its approval, disapproval, or approval subject to any required modifications. If the plat is disapproved or is approved subject to modifications, the reasons for such disapproval of the required modifications shall be indicated in writing on two

(2) copies of the plat.

One (1) copy of the preliminary plat shall be retained in the code enforcement officer's files, and one (1) copy shall be returned to the sub-divider at the time of approval or disapproval.

Final plat requirements. The final plat shall comply with all of the requirements for the preliminary plat, and any modifications thereto and in addition shall include:

(a) Final as-built survey data on property lines, easements, streets, lots, storm sewer system, utilities, and other improvements;

(b) Certifications evidencing ownership of the subject property, satisfactory provision of financial assurances sufficient to assure completion of all required improvements, and accuracy of the survey and plat and placement of all required monuments, health department approval, and other required information.

The applicant shall submit five (5) copies together with any street profiles or other plans which may be required by the code enforcement officer. When the plat has been approved by the county, one (1) copy shall be submitted for filing with the clerk of the superior court within ten

(10) days as the official plat of record. One (1) copy containing all required certifications shall be retained by the county, and one (1) copy shall be given to the sub-divider for his records. The acceptance of the final plat does not constitute acceptance of sub-divider's streets or roads as a county road.

History

The history line the source prints at the end of the section.

(Ord. No. 11-19-09, § 5, 11-19-2009)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:dade-county/code/49-5@2024-09-05-29fe92c4e9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Dade County Code of Ordinances, Sec. 49-5. Plat review and approval procedure | Georgia Commons