--- title: Dade County Code of Ordinances, Sec. 51-07. Duties of the timber harvesting operator collection: local-codes id: local-code:dade-county/code/51-07 cite_as: Dade County, Ga., Code of Ordinances § 51-07 canonical_url: https://georgiacommons.org/counties/dade/code/51-07 md_url: https://georgiacommons.org/counties/dade/code/51-07.md text_url: https://georgiacommons.org/counties/dade/code/51-07/text source_url: https://library.municode.com/ga/dade_county/codes/code_of_ordinances date: 2024-09-05 status: active jurisdiction: county:dade jurisdiction_name: Dade County county_fips: "13083" corpus_version: local-codes-dade-county-8854a49190d7 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/dade/code/~part-ii/~chapter-51.md previous: https://georgiacommons.org/counties/dade/code/51-06.md next: https://georgiacommons.org/counties/dade/code/51-08.md index: https://georgiacommons.org/counties/dade.md branch: code edition: As published by Municode, current through 2024-09-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:dade-county/code/51-07@2024-09-05-be4d58c4ea --- # Dade County Code of Ordinances, Sec. 51-07. Duties of the timber harvesting operator > As published by Municode, current through 2024-09-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE / Chapter 51 - TIMBER OPERATIONS (a) No persons or firms engaged in harvesting operations shall allow dirt, mud, or other debris resulting from harvesting operations to accumulate in ditches and drainage areas on public rights-of-way to such an extent that the usual flow of water or runoff is stopped, disturbed, changed or interrupted. (b) No equipment, trucks, or trailers, which are part of the harvesting operations shall be left unattended or parked in any public road or right-of-way. (c) All persons or firms conducting harvesting operations shall display a minimum of four (4) warning signs, two (2) in each direction, on the road entrance of the harvesting operation. Two (2) signs, one (1) in each direction, shall be located five hundred (500) feet in each direction from the operation entrance and shall provide notice of logging operations ahead and/or that slow traffic is entering the highway. Two (2) signs, one (1) in each direction, shall be located one thousand (1,000) feet in each direction from the operation entrance also providing notice of logging operations ahead and/or that slow traffic is entering the highway. Each sign shall be at least thirty-six (36) inches by thirty-six (36) inches, orange in color, and shall be posted at least three (3) feet from the travel surface of the applicable roadway. (d) All harvesting operations shall be conducted at a load site off the county right-of-way and behind the established ditch line of county roads. (e) Loading or skidding of logs will not be permitted on county roads. (f) County roads at the harvesting operations entrance shall be kept serviceable at all times for the passing public, emergency vehicles, school buses, mail carriers, and other users of the public rights-of-way. (g) The timber harvesting operator shall maintain and ensure that the public property is returned to a state at least equal to that existing immediately prior to the instituting of the harvesting operations. (h) The timber harvesting operator shall give the county written notice within seventy-two (72) hours after the completion of the harvesting operation. If it is determined by the county that the public property used by the harvesting operation is not in an at least an equal condition to that existing immediately prior to the instituting of the harvesting operations, then the county shall provide written notice to the timber harvesting operator specifying the repair actions needing to be taken by the person or firms engaged in the harvesting operation. The timber harvesting operator shall complete all repairs within fifteen (15) days from the date of such notice. (i) If the necessary repairs to the public property are not completed within the required period of time, or if the said repairs are not in accordance with applicable standards and acceptable to the county, the county may proceed to remedy said defects in accordance with applicable specifications and requirements using the proceeds from any surety bond or letter of credit to pay for such work. The timber harvesting operator shall be responsible and liable for all costs in excess of the surety bond or letter of credit. ## History (Ord. of 2005, § VII; Ord. No. 03-05-09, 3-5-2009)