Skip to content
Georgia Commons
Menu

Dodge County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 16 - SOLID WASTE / Article III - ENVIRONMENTAL CONSERVATION, ON-SITE SEWAGE MANAGEMENT, AND PERMIT / Division 4 - GROUNDWATER RECHARGE AREAS PROTECTION REGULATIONS

Sec. 16-207. Groundwater recharge areas development permit requirements.

About this text

  • As published by Municode, current through 2025-12-15
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All new uses except those identified in section 16-208 and those subject to further restriction by any underlying zoning district are allowed. The following are additional requirements for specific uses:

(1) All new above ground chemical or petroleum storage tanks, having a minimum volume of 660 gallons, shall have secondary containment for 110 percent of the volume of such tanks or 110 percent of the largest tank in a cluster of tanks, and shall otherwise meet the requirements of USEPA rules for oil pollution prevention, 40 CFR 112. Such tanks used for agricultural purposes are exempt, provided they comply with all federal requirements.

(2) All new single-family dwellings, multifamily dwellings, mobile home parks, or other uses located within a groundwater recharge area and not served by both public water and sewer systems shall be required to have a minimum lot or space size at least 150 percent of normal requirements of the state department of human resources according to its Manual for On-Site Sewage Management Systems for the particular location and soil characteristics involved, but said minimum lot or space size shall not be in any case less than the minimum lot or space size specified by any underlying zoning district. The regulations specifying the largest minimum lot or space size shall apply.

(3) All lots shall have a minimum width of 150 feet, or as specified in any underlying zoning district if stricter (larger), in the area where an approved on-site sewage management system is to be located.

(4) All new wastewater treatment basins shall have an impermeable liner except for the construction of mining settling basins.

(5) All new agricultural waste impoundment sites shall be lined. As a minimum, the liner shall be constructed of compact clay having a thickness of one foot and a vertical hydraulic conductivity of less than 5 x 107 cm/sec or other criteria established by the U.S. Natural Resources Conservation Service.

History

The history line the source prints at the end of the section.

(Ord. of unknown date(4), § 7(c))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:dodge-county/code/16-207@2025-12-15-d3e89aefb6

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Dodge County Code of Ordinances, Sec. 16-207. Groundwater recharge areas development permit requirements | Georgia Commons