The tonnage or volume equivalent thereto with respect to which the surcharge is hereby levied shall be such as is finally determined by the EPD/DNR or the board. When the periodic report of tonnage is prepared by the EPD/DNR or other state agency, whether monthly or otherwise, each operator affected hereby shall be advised either by the EPD/DNR or the county of the tonnage or equivalency thereof as determined, and each operator of a biomedical incinerator facility, autoclave or biomedical waste disposal facility shall remit to the county the amount of the surcharge determined as provided in section 16-58 within ten days. If the EPD/DNR shall fail to make the determination, it shall be made by the county.