Any utility or CSP that does not notify the transportation department in advance of the date and time of the roadway backfilling and repaving, shall be fined two hundred fifty dollars ($250.00) per occurrence. In addition, the utility or CSP may be required by the transportation department to core the patching, at the utility's or CSP's cost, to determine its compliance with the county transportation department standard number 3.01, Backfilling and Repaving Utility Cuts. All cost or expenses incurred by the county in repairing or replacing any structure, shrubbery, driveway, embankment, ground cover or any other item which has been altered or disturbed and not left or returned to the original condition by the utility or CSP, shall be chargeable to the utility or CSP which disturbed the area or cut the county roadway. The county shall be entitled to collect reasonable attorney's fees incurred in the collection of such costs or expenses and all costs of collection.