--- title: Douglas County Code of Ordinances, Sec. 14-57. Creation of speed hump districts in existing residential areas collection: local-codes id: local-code:douglas-county/code/14-57 cite_as: Douglas County, Ga., Code of Ordinances § 14-57 canonical_url: https://georgiacommons.org/counties/douglas/code/14-57 md_url: https://georgiacommons.org/counties/douglas/code/14-57.md text_url: https://georgiacommons.org/counties/douglas/code/14-57/text source_url: https://library.municode.com/ga/douglas_county/codes/code_of_ordinances date: 2026-03-31 status: active jurisdiction: county:douglas jurisdiction_name: Douglas County county_fips: "13097" corpus_version: local-codes-douglas-county-599dd95b93ed publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/douglas/code/~chapter-14/~article-iv.md previous: https://georgiacommons.org/counties/douglas/code/14-56.md next: https://georgiacommons.org/counties/douglas/code/14-58.md index: https://georgiacommons.org/counties/douglas.md branch: code edition: As published by Municode, current through 2026-03-31 edition_date_kind: current_through source_publisher: Municode version_id: local-code:douglas-county/code/14-57@2026-03-31-439c7e5196 --- # Douglas County Code of Ordinances, Sec. 14-57. Creation of speed hump districts in existing residential areas > As published by Municode, current through 2026-03-31 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 14 - ROADS, STREETS AND SIDEWALKS / Article IV - SPEED HUMP DISTRICTS To create a speed hump district in an existing residential area, the following procedure must be followed. (1) Any property parcel owner in any unincorporated area of the county may present a request for the creation of a speed hump district to the county public works department, engineering division. (2) Upon receipt of the request the department shall determine the appropriate boundaries for a speed hump district which will serve the property parcel owner presenting the request and all other affected lot owners. The determination of this district by the department will include a consideration of traffic patterns, major and minor streets, and other similar factors. The department shall determine the location of each speed hump in the district. This determination shall consider stormwater controls, driveway locations, sight distances, and other relevant factors. If the department determines that a speed hump cannot be safely placed at any location in the district, the department shall notify the requesting property owner of this fact, and no further action will be taken by the department. (3) If the department determines that a speed hump(s) can be safely placed within the proposed district, the department shall prepare a map delineating the proposed speed hump district, and a list of names from the records of the tax commissioner of those believed to be property owners. (4) The two (2) methods of acquiring the approval of seventy-five (75) percent of the property parcel owners necessary before a public hearing can be held are: a. The department will mail a petition to each property owner in the proposed district, including with it a map of the proposed district, a diagram of the proposed speed hump, a copy of the enabling ordinance, and any other similar information the department feels should be provided to the property owners to educate them about the proposed district. The petition will ask the property owner to answer �yes� or �no� to the formation of the proposed speed hump district. The petition shall include the following language: �I/We, the undersigned, certify that I/we am/are the owner(s) of the above referenced property of the proposed speed hump district. I/We certify that the signature(s) below are by any and all of those who claim ownership of this property. I/We do hereby petition for the installation of speed humps. I/We understand that if 75% of the lot holders in the proposed district indicate that they want speed humps, the Douglas County Board of Commissioners will hold a Public Hearing on this request. If the speed hump district is created, I/we will be held responsible for the cost of materials to construct the speed hump(s). I/We hereby pledge to pay our share of the costs of the construction of the speed hump(s) when billed by the County. I/We do not desire the installation of speed humps. I/We understand that if 75% of the lot holders in the proposed district indicate that they want speed humps, the Douglas County Board of Commissioners will hold a Public Hearing on this issue. If the speed hump district is created, I/we will be held responsible for the cost of the materials to construct the speed hump(s). My/Our signature(s) on this petition indicate(s) that I/we understand all information concerning the speed hump program of Douglas County.� The petition must contain the signature of every person with an ownership interest in an individual property. All signatures on the petition form must be notarized by a disinterested person who will not be affected by the creation of a speed hump district, i.e., not a resident of the proposed speed hump district; or b. The petitioner will obtain a petition, a map of the proposed district, a diagram of the proposed speed hump, a copy of the enabling ordinance, and any other similar information the department feels should be provided to the property owners to educate them about the proposed district from the department. The petition will ask the property owner to answer �yes� or �no� to the formation of the proposed speed hump district. The petition shall include the following language: �I/We, the undersigned, certify that I/we am/are the owner(s) of the above referenced property of the proposed speed hump district. I/We certify that the signature(s) below are by any and all of those who claim ownership of this property. I/We do hereby petition for the installation of speed humps. I/We understand that if 75% of the lot holders in the proposed district indicate that they want speed humps, the Douglas County Board of Commissioners will hold a Public Hearing on this request. If the speed hump district is created, I/we will be held responsible for the cost of materials to construct the speed hump(s). I/We hereby pledge to pay our share of the costs of the construction of the speed hump(s) when billed by the County. I/We do not desire the installation of speed humps. I/We understand that if 75% of the lot holders in the proposed district indicate that they want speed humps, the Douglas County Board of Commissioners will hold a Public Hearing on this issue. If the speed hump district is created, I/we will be held responsible for the cost of the materials to construct the speed hump(s). My/Our signature(s) on this petition indicate(s) that I/we understand all information concerning the speed hump program of Douglas County.� The petition must contain the signature of every person with an ownership interest in an individual property. All signatures on the petition form must be notarized by a disinterested person who will not be affected by the creation of a speed hump district, i.e., not a resident of the proposed speed hump district or of any area directly affected by the creation of the speed hump district. (5) If a minimum of seventy-five (75) percent of the property parcel owners in the proposed district return the petition in favor of the creation of a speed hump district, or if the petition circulated by the petitioner is returned to the department with a minimum of seventy-five (75) percent of the property parcel owners in the proposed district signing in favor of the creation of a speed hump district, the petition will be forwarded to the board of commissioners for a public hearing on the creation of the proposed district. If less than seventy-five (75) percent of the property parcel owners return the petitions in favor of the creation of the speed hump district, no further action will be taken by the department. If less than seventy-five (75) percent of the surveys are returned to the department, no further action will be taken by the department. The petitions must be returned to the department within ninety (90) days of their mailing by the department, or the petition will be null and void. A proposed speed hump district will only be surveyed by the department one (1) time in any six-month period. (6) Upon acceptance of the surveys from the county public works department, engineering division, the board of commissioners will advertise a public hearing for the purpose of determining whether or not to create the proposed speed hump district. The public hearing date, time, and place shall be advertised one (1) time in the legal organ of the county at least ten (10) days prior to the hearing date. A minimum of one (1) sign shall be placed at a visible location within the proposed district announcing the public hearing at least five (5) days prior to the hearing date. Additional signs may be required as the board of commissioners and/or the public works department, engineering division may determine. (7) During the advertised public hearing, the board of commissioners will hear a report from the public works department, engineering division, concerning the location of all speed humps proposed for the district, and the total estimated project costs, as outlined in paragraph (8) of this section. (8) If the board of commissioners votes to create a speed hump district, the public works department, engineering division will prepare a summary of costs which shall include material cost of the speed hump(s). This summary of costs will be given to the petitioner for the petitioner to collect from the affected property parcel owners in the newly created speed hump district. When a minimum of seventyfive (75) percent of the total costs have been paid to the public works department, engineering division, the construction of the speed hump(s) shall be authorized. ## History (Ord. of 4-2-96; Ord. of 6-19-01)