--- title: Douglas County Code of Ordinances, 3.1. If the structure is to be repaired, the collection: local-codes id: local-code:douglas-county/code/3.1 cite_as: Douglas County, Ga., Code of Ordinances ยง 3.1 canonical_url: https://georgiacommons.org/counties/douglas/code/3.1 md_url: https://georgiacommons.org/counties/douglas/code/3.1.md text_url: https://georgiacommons.org/counties/douglas/code/3.1/text source_url: https://library.municode.com/ga/douglas_county/codes/code_of_ordinances date: 2026-03-31 status: active jurisdiction: county:douglas jurisdiction_name: Douglas County county_fips: "13097" corpus_version: local-codes-douglas-county-599dd95b93ed publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/douglas/code/~appendix-c/~chapter-3.md previous: https://georgiacommons.org/counties/douglas/code/302.1.md next: https://georgiacommons.org/counties/douglas/code/3.2.md index: https://georgiacommons.org/counties/douglas.md branch: code edition: As published by Municode, current through 2026-03-31 edition_date_kind: current_through source_publisher: Municode version_id: local-code:douglas-county/code/3.1@2026-03-31-b51f7af321 --- # Douglas County Code of Ordinances, 3.1. If the structure is to be repaired, the > As published by Municode, current through 2026-03-31 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - ELIMINATION OR REPAIR OF UNSAFE AND NONFUNCTIONING STRUCTURES (OTHER THAN BUILDINGS) / Chapter 3 - INSPECTION AND NOTICE OF NONCOMPLIANCE 301. ACTION REQUIRED notice shall require that all necessary permits be secured and the work commenced within sixty (60) days and continued to completion with such time as the director ofengineering determines. The notice shall also indicate the degree to which the repairs must comply with applicable regulations.