notice shall require that the premises be vacated within sixty (60) days, that all required permits for demolition be secured, and that the demolition be completed within such time as determined reasonable by the director of engineering. 4. A statement advising that any person having any legal interest in the property may appeal the notice by the director of engineering to the board of adjustment and appeals and that such appeal shall be in writing in the form specified in Section 401 of this Appendix, and shall be filed with the director ofengineeringwithin thirty (30) days from the date of the notice and that failure to appeal in the time specified will constitute a waiver of all rights to an administrative hearing. If an adjacent/near to structure or property has been negatively affected by the cited unsafe and/or nonfunctioning structure, the notice shall also include this information, location, and required corrective action. The owner ofthe unsafe and/or nonfunctioning structure shall be responsible for the correction ofthe negatively affected adjacent/near to structure or property, regardless of its ownership.