--- title: Early County Code of Ordinances, Sec. 10-123. Required inspections collection: local-codes id: local-code:early-county/code/10-123 cite_as: Early County, Ga., Code of Ordinances § 10-123 canonical_url: https://georgiacommons.org/counties/early/code/10-123 md_url: https://georgiacommons.org/counties/early/code/10-123.md text_url: https://georgiacommons.org/counties/early/code/10-123/text source_url: https://library.municode.com/ga/early_county/codes/code_of_ordinances date: 2022-11-07 status: active jurisdiction: county:early jurisdiction_name: Early County county_fips: "13099" corpus_version: local-codes-early-county-960c5bf0a6f9 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/early/code/~part-ii/~chapter-10/~article-ii/~division-4.md previous: https://georgiacommons.org/counties/early/code/10-122.md next: https://georgiacommons.org/counties/early/code/10-124-to-10-144.md index: https://georgiacommons.org/counties/early.md branch: code edition: As published by Municode, current through 2022-11-07 edition_date_kind: current_through source_publisher: Municode version_id: local-code:early-county/code/10-123@2022-11-07-b3548a0c5e --- # Early County Code of Ordinances, Sec. 10-123. Required inspections > As published by Municode, current through 2022-11-07 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 10 - BUILDINGS AND BUILDING REGULATIONS / Article II - ADMINISTRATION / Division 4 - INSPECTIONS The building official, upon notification from the permit holder or his agent, shall make the following inspections and such other inspections as necessary, and shall place a violation report on the job site: (1) Building. a. Foundation inspection. To be made after trenches are excavated, forms erected, grade stakes installed and any required reinforcing is in place. b. Frame inspections. To be made after the roof, all framing, fire blocking and bracing is in place, and all concealed wiring, all pipes, chimneys, ducts and vents are complete and inspected. c. Insulation inspection. To be made prior to covering insulation. d. Wallboard inspection. To be made prior to taping wallboard on all wallboard installed as part of fire rated assemblies. e. Final inspection. To be made after the building is completed and ready for occupancy, which shall include properly approved connections to approved water and sewage systems. (2) Electrical. a. Temporary service. To be made after service has been installed, but prior to connection to utility. b. Underground and slab inspection. To be made after trenches or ditches are excavated, wiring or conduit installed, and before any backfill or slabs are put in place. c. Rough-in inspection. To be made after the roof, framing, fire blocking and bracing is in place and all wiring or conduit is complete prior to installation of ceiling and wall membranes. d. Final inspection. To be made after the building is complete, all electrical fixtures in place and properly connected, and the structure is ready for occupancy or use. (3) Gas. a. Rough piping inspection. To be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected. b. Final piping inspection. To be made after all piping authorized by the permit has been installed and after all portions which are to be concealed have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test. c. Final inspection. To be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes, to insure compliance with all the requirements of this Code and to ensure that the installation and construction of the gas system is in accordance with the approved plans. (4) Mechanical. a. Underground fuel piping inspection. To be made after trenches or ditches are excavated, fuel piping installed, and before any backfill is put in place. b. Rough-in inspection. To be made after the roof, framing, fire-blocking and bracing are in place and all ducking, and other concealed components are complete, and prior to the installation of wall or ceiling membranes. c. Final inspection. To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy. (5) Swimming pool. a. Rough-in inspection. To be made after excavation is made and framework or reinforcing is placed, prior to backfill or concrete is put in place. b. Final inspection. To be made after pool is complete and after security fence has been erected. ## History (Res. of 6-1-1998(2), ch. 6, art. IV, § 6.4-4)