Appropriate building permit, code compliance permit, subdivision, land disturbing permit, certificate of occupancy, contractor registration and inspection fees must be paid and are available in the county schedule of development fees. (1) Re-inspection. Where inspections are required, the inspection and the first re-inspection shall be at no cost; for each and every re-inspection thereafter, there shall be paid a re-inspection fee, however, the building official may waive the re-inspection fee if he determines that the reinspection was not required as a result of the failure of the contractor to have the work ready to inspect or to have performed the work correctly. (2) Certificates of occupancy. The issuance of certificate of occupancy shall be at no cost except as follows: a. Temporary certificates of occupancy. b. Certificates of occupancy requested for existing buildings for which a building permit has not been issued. (3) Contractor registration. There shall be a charge imposed for contractor registration.