Sec. 10-360. Standards for solar farms.
About this text
- As published by Municode, current through 2022-11-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
All solar farms in the unincorporated areas of the county shall comply with the following standards:
(1) Solar farms shall not exceed 2,000 acres in the aggregate, including adjacent or abutting properties or tracts.
(2) Solar farms shall be fenced in using a chainlink fence with a height of at least six feet, with anti-climb devices with three barbed wire line arms or otherwise acceptable to the county code enforcement department. Brightly colored signs no smaller than one foot by two feet shall be posted on the fence every 100 feet warning of danger and high voltage.
(3) Abutting residential properties shall be visually screened year round from any solar farms to the reasonable satisfaction of the county code enforcement department through any one or a combination of planting or existing vegetation or fencing, all of which shall be at least six feet in height.
(4) Clearing of natural vegetation shall be limited to that which is necessary for the construction, operation, and maintenance of the ground mounted solar photovoltaic installation and consistent with best practices for the preservation of natural areas or good husbandry of the land or forest.
(5) There shall be a minimum distance of four feet between solar panels and the top of any vegetation beneath them.
(6) The names of the manufacturers, installers, facility owners, and facility operators, and their addresses and telephone numbers shall be posted on the required fencing at each entrance of a solar farm.
(7) All electrical interconnection and distribution lines within a solar farm's boundaries, except for power lines that leave the project or are within the substation, shall be underground, unless the county code enforcement department grants a written exception due to severe environmental constraints.
(8) Lighting of a solar farm and its accessory structures shall be limited to the minimum reasonably necessary for its safe operation and shall be reasonably shielded from abutting properties. Where feasible, lighting of a solar farm shall be directed downward and shall incorporate full cutoff fixtures to reduce light pollution.
(9) All solar farms shall comply with any other applicable requirements of the county code of ordinances.
(10) All solar farms shall have a lock box entry system at the primary entrance. The lock box entry system shall comply with the specifications of the International Fire Code.
(11) All solar farms shall have a written emergency response plan that shall be acceptable to the county's code enforcement department, sheriff's office, fire department, and emergency management agency. Each solar farm shall update its emergency response plan no later than January 1 of each year with a copy provided to all departments and agencies named in this subsection.
The emergency response plan shall include the following:
a. The telephone number, e-mail address, and street address for all manufacturers, installers, owners, and operators;
b. The telephone number, e-mail address, and mailing address for a representative of the solar farm responsible for responding to public inquiries;
c. The material safety data sheets that apply to any materials on the solar farm; and
d. The clearly marked means and instructions for shutting down the solar photovoltaic installation.
(12) Any solar farm that has not been in use for a period of 180 consecutive days for its original purpose as approved by the county code enforcement department shall be deemed abandoned and shall not be authorized to recommence operations until a new application and inspection have been completed.
(13) No later than 90 days after abandonment or closure, the owners and operators of a solar farm shall remove the solar energy system, its equipment and panels, and any appurtenant structures.
No later than 120 days after abandonment or closure, the owners or operators of any such solar farm shall provide written documentation acceptable to the county code enforcement department demonstrating that the solar panels and related equipment were properly disposed of in accordance with federal; state, and local laws and regulations.
(14) The county code enforcement department may, in its reasonable discretion, waive any of the above-listed conditions which are not reasonable in light of the nature of the project and may add additional conditions or safeguards as needed for public health, safety, and welfare or to mitigate the impact of the solar farm on surrounding properties and uses. Violations of any such additional conditions or safeguards shall be a violation of this article.
(15) All of the conditions and requirements in this section shall be of a continuing nature.
History
(Res. of 4-4-2017, § 1(29.3))