All water, sewer, or gas lines shall be buried a minimum of 12 inches below the finished ground surface of the development and shall be provided with an adequate valve system to allow the cutoff of utility service to each individual dwelling unit and at the entrance of the utility system into the development. If overhead lines are provided within the development such lines shall be a minimum of 15 feet above the grade of the interior streets and so placed that no wires extend over individual dwelling units.