--- title: Early County Code of Ordinances, Sec. 34-316. Storm drainage collection: local-codes id: local-code:early-county/code/34-316 cite_as: Early County, Ga., Code of Ordinances § 34-316 canonical_url: https://georgiacommons.org/counties/early/code/34-316 md_url: https://georgiacommons.org/counties/early/code/34-316.md text_url: https://georgiacommons.org/counties/early/code/34-316/text source_url: https://library.municode.com/ga/early_county/codes/code_of_ordinances date: 2022-11-07 status: active jurisdiction: county:early jurisdiction_name: Early County county_fips: "13099" corpus_version: local-codes-early-county-960c5bf0a6f9 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/early/code/~part-ii/~chapter-34/~article-iv.md previous: https://georgiacommons.org/counties/early/code/34-315.md next: https://georgiacommons.org/counties/early/code/34-317.md index: https://georgiacommons.org/counties/early.md branch: code edition: As published by Municode, current through 2022-11-07 edition_date_kind: current_through source_publisher: Municode version_id: local-code:early-county/code/34-316@2022-11-07-d8a3ee0975 --- # Early County Code of Ordinances, Sec. 34-316. Storm drainage > As published by Municode, current through 2022-11-07 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 34 - SUBDIVISIONS / Article IV - REQUIRED IMPROVEMENTS (a) An adequate drainage system including necessary ditches, curbs, gutters, pipes, culverts, street drains, drip inlets, bridges, and other improvements shall be provided for the conducting of all surface water through the subdivision. (b) Drains and cross drains shall be provided to accommodate all natural watercourses, as well as water flowing from the site and shall extend beyond the roadway shoulders sufficiently to protect the embankment slopes. (c) Pipe sizes and slopes shall be determined by acceptable engineering calculations and shall provide for not less than a ten-year return frequency storm. In no case shall cross drains be less than 18 inches in diameter and side drains less than 15 inches in diameter. ## History (Res. of 6-1-1998(2), ch. II, art. IV, § 2.4-4)