--- title: Early County Code of Ordinances, Sec. 34-45. Conformance to standards for streets and utilities collection: local-codes id: local-code:early-county/code/34-45 cite_as: Early County, Ga., Code of Ordinances § 34-45 canonical_url: https://georgiacommons.org/counties/early/code/34-45 md_url: https://georgiacommons.org/counties/early/code/34-45.md text_url: https://georgiacommons.org/counties/early/code/34-45/text source_url: https://library.municode.com/ga/early_county/codes/code_of_ordinances date: 2022-11-07 status: active jurisdiction: county:early jurisdiction_name: Early County county_fips: "13099" corpus_version: local-codes-early-county-960c5bf0a6f9 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/early/code/~part-ii/~chapter-34/~article-ii.md previous: https://georgiacommons.org/counties/early/code/34-44.md next: https://georgiacommons.org/counties/early/code/34-46.md index: https://georgiacommons.org/counties/early.md branch: code edition: As published by Municode, current through 2022-11-07 edition_date_kind: current_through source_publisher: Municode version_id: local-code:early-county/code/34-45@2022-11-07-4997dc15fb --- # Early County Code of Ordinances, Sec. 34-45. Conformance to standards for streets and utilities > As published by Municode, current through 2022-11-07 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 34 - SUBDIVISIONS / Article II - GENERAL REQUIREMENTS All roads, streets and/or alleys that are to be used by the general public shall be constructed in accordance with the standards fixed by these regulations. No road shall be accepted for county maintenance unless the provisions of these regulations have been met. Official approval of a developer's plan constitutes no implied responsibility on the county for any assistance in construction, either in materials or labor or equipment, this being the responsibility of the developer. Specifically, the developer will remove or have removed at his own cost, all utility lines and poles, install required drainage facilities, install all culverts for access to abutting land, construct the roadway and improve the right-of-way (R-O-W). It shall be a violation of these regulations to obtain permanent service from any utility company, including, but not limited to, power, water or telecommunications without first obtaining final approval of the development. ## History (Res. of 6-1-1998(2), ch. II, art. II, § 2.2-3)