The lime and fertilizer shall be uniformly mixed into the top four inches of soil by suitable harrows, rotary tillers, or other equipment satisfactory to the county engineer before any more work is done on the area. On cut slopes steeper than 3:1, the mixing specified in this section may be reduced to the maximum practical depth as determined by the engineer, except on serrated slopes where mixing may be omitted.