Sec. 38-24. Technical requirements; channel capacity.

About this text

  • As published by Municode, current through 2022-11-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The CATV system to be constructed by the grantee shall be installed, maintained and operated at all times in full compliance with the technical and channel capacity standards of the Federal Communications Commission. The results of annual performance tests conducted in accordance with FCC rules shall be retained for at least five years and available for inspection by the franchise entity.

History

The history line the source prints at the end of the section.

(Code 1996, § 22-6; Ord. of 9-5-1989, § 6)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:early-county/code/38-24@2022-11-07-f11ac2ae8a

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Early County Code of Ordinances, Sec. 38-24. Technical requirements; channel capacity | Georgia Commons