(a) All new towers shall be of the monopole type, unless such is able to be proven to be technologically impracticable. No new towers of a lattice or guyed type shall be permitted, unless relief is otherwise expressly granted. (b) The applicant shall submit documentation justifying the technical need by the service provider for the total height of any tower, facility and/or antenna requested and the basis therefor. To enable verification of the need for the requested height, documentation in the form of propagation studies must include all backup data used to produce the studies at the height requested and at a minimum of ten feet lower height. Such documentation will be analyzed in the context of the justification of the height needed to provide service primarily and essentially within the county, to the extent practicable, unless good cause is shown. (c) The maximum permitted total height of a new tower shall be 120 feet above pre-construction ground level, unless it can be proven that such height would prohibit or have the effect of prohibiting the provision of service in the intended service area. The 120-foot maximum permitted height is not as-of-right height, but rather the maximum permitted height, absent proof of the technological need for a greater height. (d) Notwithstanding the 120-foot maximum permitted height, telecommunications towers and facilities shall be no taller than the minimum height technologically necessary to enable the provision of wireless service coverage or capacity as needed within the county, and only within the county. (e) Spacing or the distance between towers shall be such that the service may be provided without exceeding the maximum permitted height.