--- title: Elbert County Code of Ordinances, Sec. 18-141. Temporary emergency permit collection: local-codes id: local-code:elbert-county/code/18-141 cite_as: Elbert County, Ga., Code of Ordinances § 18-141 canonical_url: https://georgiacommons.org/counties/elbert/code/18-141 md_url: https://georgiacommons.org/counties/elbert/code/18-141.md text_url: https://georgiacommons.org/counties/elbert/code/18-141/text source_url: https://library.municode.com/ga/elbert_county/codes/code_of_ordinances date: 2026-11-23 status: active jurisdiction: county:elbert jurisdiction_name: Elbert County county_fips: "13105" corpus_version: local-codes-elbert-county-76292434c225 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/elbert/code/~part-ii/~chapter-18/~article-vi.md previous: https://georgiacommons.org/counties/elbert/code/18-140.md next: https://georgiacommons.org/counties/elbert/code/18-142.md index: https://georgiacommons.org/counties/elbert.md branch: code edition: As published by Municode, retrieved 2026-11-23 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:elbert-county/code/18-141@2026-11-23-c29cd0b4c3 --- # Elbert County Code of Ordinances, Sec. 18-141. Temporary emergency permit > As published by Municode, retrieved 2026-11-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 18 - ENVIRONMENT / Article VI - WETLANDS PROTECTION A temporary emergency permit can be issued by the board of commissioners for the following reasons: (1) Maintenance or repair of lawfully located roads or structures and of facilities used in the service of the public to provide transportation, electric, gas, water, telephone, telegraph, telecommunication or other services, provided that such roads, structures or facilities are not materially changed or enlarged and written notice prior to the commencement of work has been given to the board of commissioners and provided that the work is conducted using best management practices to ensure that flow and circulation patterns and chemical and biological characteristics of the wetland are not impaired and that any adverse effect on the aquatic environment will be minimized. (2) Temporary water level stabilization measures associated with ongoing silvicultural operations, provided that they are necessary to alleviate abnormally wet or dry conditions that would have an adverse impact on the conduct of silvicultural activities if not corrected. (3) Limited ditching, tilling, dredging, excavating or filling done solely for the purpose of maintaining or repairing existing drainage systems necessary for the cultivation of agricultural crops, provided that the maintenance or repair activity does not result in the impairment, alteration or loss of wetlands not previously subject to agricultural and silvicultural use under the terms and provisions of section 18-139. (4) Limited excavating and filling necessary for the repair and maintenance of piers, walkways, nature trails, observation decks, wildlife management shelters, boathouses or other similar water-related structures, provided that they are built on pilings to allow unobstructed flow of water and preserve the natural contour of the wetland. ## History (Code 1996, § 34-206; Ord. of 1-23-2001(3), § 5)