Sec. 18-144. Permit.

About this text

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Application.

(1) Application shall be made to the board of commissioners. At the time of the application, the applicant shall pay a filing fee as specified by the board of commissioners. Filing fees as determined by the board of commissioners may be required to evaluate the application. This fee may be used to retain expert consultants who will provide services pertaining to functional assessment, mitigation and wetland boundary determinations as deemed necessary by the board of commissioners.

(2) If the proposed project appears to be near or within a wetlands boundary, the building inspector or appointed designee shall compare the proposed project locations to the generalized wetlands map. If the proposed project appears to be within 250 feet of a wetlands boundary, the responsible person must refer the developer or applicant to the Corps of Engineers prior to issuing a local permit.

(b) Duration of permit.

(1) If construction described in the development permit has not commenced within 12 months from the date of issuance, the permit shall expire.

(2) If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date that work ceased.

(3) Written notice of the pending expiration of the development permit shall be issued by the board of commissioners.

(c) Penalties.

(1) When a building or other structure has been constructed in violation of this section, the violator may be required to remove the structure at the discretion of the board of commissioners.

(2) When removal of vegetative cover, excavation or fill has taken place in violation of this section, the violator may be required to restore the affected land to its original contours and to restore vegetation, as far as practicable, at the discretion of the board of commissioners.

(3) If the board of commissioners discovers a violation of this article that also constitutes a violation of any provision of the Clean Water Act, as amended, the board of commissioners shall issue written notification of the violation to the U.S. Environmental Protection Agency, the U.S. Army Corps of Engineers and the landowner.

(d) Suspension, revocation. The board of commissioners may suspend or revoke a permit if it finds that the applicant has not complied with the conditions or limitations set forth in the permit or has exceeded the scope of the work set forth in the permit. The board of commissioners shall cause notice of denial, issuance, conditional issuance, revocation or suspension of a permit to be published in a daily newspaper having a broad circulation in the area where the wetland is located.

(e) Appeal procedures. Any person or persons jointly or severally aggrieved by a decision of the board of commissioners shall appeal to the county superior court within 30 days of the board's decision.

History

The history line the source prints at the end of the section.

(Code 1996, § 34-209; Ord. of 1-23-2001(3), § 8)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:elbert-county/code/18-144@2026-11-23-f0f1e34bb8

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Elbert County Code of Ordinances, Sec. 18-144. Permit | Georgia Commons