Skip to content
Georgia Commons
Menu

Elbert County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 34 - UTILITIES / Article II - 2006 HART CABLE, INC./LINTEL, INC. CABLE FRANCHISE ORDINANCE

Sec. 22-59. Right of inspection and construction requirements.

About this text

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Franchising Authority's Right to Inspect. The Franchising Authority shall have the right to inspect the construction, operation and maintenance of the system by the Grantee to ensure the proper performance of the terms of this Chapter.

(b) Notice of Violation; Franchising Authority's Right to Remedy or Terminate. In the event Grantee should violate any of the terms of this Chapter or any of the rules and regulations as may be from time to time adopted, the Franchising Authority shall immediately give to Grantee sixty (60) days written notice to correct such violation, and in the event Grantee does not make such correction within sixty (60) days from receipt of such written notice, the Franchising Authority may make such correction itself and charge the cost of same to Grantee, or, at the Franchising Authority's option, terminate Grantee's franchise in accordance with the terms set forth herein.

(c) Construction and Operation Standards. Construction, maintenance, and operation of the system, including connection made to the system to provide service to Customers, shall be in accordance with the provisions of the National Electrical Safety Code, prepared by the National Bureau of Standards, the National Code of the National Board of Fire Underwriters and such applicable ordinances and regulations of Elbert County affecting electrical installations which may be presently in effect or which may be enacted by the Elbert County Board of Commissioners. The operation of the system shall conform to all rules and regulations of the Federal Communications Commission applicable thereto, particularly with regard to spurious radiation. All lines shall be installed and maintained at substantially the same level from the ground surface and shall not be zigzagged or otherwise installed so as to preclude or prevent any other company from installing its cables or lines.

History

The history line the source prints at the end of the section.

(Ord. of 12-11-2006, § 1(22-59))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:elbert-county/code/22-59@2026-11-23-679bc6aed9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Elbert County Code of Ordinances, Sec. 22-59. Right of inspection and construction requirements | Georgia Commons