--- title: Elbert County Code of Ordinances, Sec. 22-70. Construction Practices collection: local-codes id: local-code:elbert-county/code/22-70 cite_as: Elbert County, Ga., Code of Ordinances § 22-70 canonical_url: https://georgiacommons.org/counties/elbert/code/22-70 md_url: https://georgiacommons.org/counties/elbert/code/22-70.md text_url: https://georgiacommons.org/counties/elbert/code/22-70/text source_url: https://library.municode.com/ga/elbert_county/codes/code_of_ordinances date: 2026-11-23 status: active jurisdiction: county:elbert jurisdiction_name: Elbert County county_fips: "13105" corpus_version: local-codes-elbert-county-76292434c225 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/elbert/code/~part-ii/~chapter-34/~article-ii.md previous: https://georgiacommons.org/counties/elbert/code/22-69.md next: https://georgiacommons.org/counties/elbert/code/22-71.md index: https://georgiacommons.org/counties/elbert.md branch: code edition: As published by Municode, retrieved 2026-11-23 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:elbert-county/code/22-70@2026-11-23-8381a81831 --- # Elbert County Code of Ordinances, Sec. 22-70. Construction Practices > As published by Municode, retrieved 2026-11-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 34 - UTILITIES / Article II - 2006 HART CABLE, INC./LINTEL, INC. CABLE FRANCHISE ORDINANCE When a developer and/or landowner extends basic underground utilities to serve a lot, cable television conduits shall be laid underground at the same time as those basic utilities. This will preclude the necessity for disturbing streets, sidewalks, and alleyways when Cable Service connections are extended to any building. The developer and/or landowner shall bear the entire cost required to extend such service, including easements, trenching, conduit, pedestals and/or vaults and laterals. The developer and/or landowner, however, shall be responsible only for such facilities serving their development. Conduit ends shall be elbowed to the final ground elevation and capped. The conduit shall be installed according to the specifications of the County Engineer. It is understood that, as part of the Franchising Authority's permitting process, the Grantee will be notified within an amount of time sufficient to allow for the coordination of joint use of open trenches and other similar construction opportunities. ## History (Ord. of 12-11-2006, § 1(22-70))