Elbert County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 34 - UTILITIES / Article II - SOLAR
Sec. 9.13.04. Solar energy facility or solar farm.
About this text
- As published by Municode, retrieved 2026-11-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
In districts where permitted, a solar energy facility or solar farm, as defined, shall be subject to the following regulations:
(a) Mounting.
1. Solar panels or solar arrays shall be mounted onto a pole, rack or suitable foundation, in accordance with manufacturer specifications, in order to ensure the safe operation and stability of the system. The mounting structure (fixed or tracking capable) shall be comprised of materials approved by the manufacturer, which are able to fully support the system components, in accordance with applicable building permit requirements. Electrical components of the facility shall meet applicable electrical code requirements, and all electrical wires and lines less than 100 kV that are used in conjunction with the solar energy facility shall be installed underground.
2. Multiple mounting structures shall be spaced apart at the distance recommended by the manufacturer to ensure safety and maximum efficiency.
(b) Setbacks. A solar energy facility and its appurtenant components and structures shall be set back a minimum of 200 feet from all property lines and 250 feet from any residence. No solar energy facility shall be located within 10,560 feet (two miles) from any municipal boundary.
(c) Placement.
l. A single project may not spread across multiple tracts and shall be located exclusively on one tract of land. As used in this article, a tract of land is that land comprising a single tax parcel according to the records maintained by the county board of tax assessors in accordance with the standards of the county board of tax assessors.
2. If located in a floodplain or an area of known localized flooding, all panels, electrical wiring, automatic transfer switches, inverters, etc., shall be located above the base flood elevation.
3. Components of the facility shall not be located over a septic system, leach field area or identified reserve area unless approved by the health department.
4. Any solar energy facility proposed within a five-mile radius of an airport shall present evidence that they have gone through a review process with the Federal Aviation Administration (FAA). This review from the FAA shall indicate that the proposed facility shall not interfere with the normal operation of aircraft in the area.
(d) Wildlife.
1. If the solar energy facility will result in potentially adverse changes to any state or federally endangered, threatened, or candidate species habitat, the applicant shall submit a mitigation plan, which includes:
(i) A process for minimizing changes to the species habitat, including, but not limited to, habitat corridors;
(ii) A plan to relocate and monitor any impacted species; and (iii) A plan to restore the original species habitat after the system is decommissioned.
2. An environmental review conducted by the state department of natural resources, wildlife resources division will be required, and results of the review must be submitted with application. If the proposed project does not require a full review from the state department of natural resources, wildlife resources division, an environmental review letter will be required.
3. All solar energy facilities shall include at least one wildlife corridor at least 200 feet in width for each 500 acres. Solar energy facilities up to 500 acres will be required to have at least one wildlife through corridor. Solar energy facilities between 500 and 1,000 acres will be required to have two wildlife through corridors, and solar energy facilities between 1,000 and 1,500 acres will be required to have three wildlife through corridors. Wetlands and state waters, as defined in section 18-55 of the Elbert County Code of Ordinances, shall not be considered wildlife corridors for purposes of this section.
(e) Damage to county infrastructure. The owners and operators of any solar energy facility shall be jointly and severally responsible for reimbursing the county for any damages to county infrastructure, including damages resulting from construction traffic to and from the solar energy facility during construction, as determined by the county administrator or his/her designee.
(f) Protection of agricultural integrity of the land. The applicant shall submit a plan of action drafted by a qualified soil scientist or agricultural expert and shall follow the plan of action for the life of the solar energy facility, designed to prioritize the long-term health and productivity of the land on which the proposed facility is located by prioritizing soil health, reducing synthetic inputs into the soil, and rebuilding soil organic matter. This plan may include a combination of the grazing of animals, the use of other organic weed control, the growing of crops, the growing of appropriate ground covers, fertilization, composting, and similar actions.
(g) Screening. The facility shall be fully screened from adjoining properties and adjacent roads using the natural vegetation and by the planting of an evergreen buffer capable of reaching a height of six feet within three years of planting, with at least 75 percent opacity at the time of planting. The entire setback area specified in subsection (b) of this section shall be screened as provided herein.
(h) Height.
1. Freestanding solar panels or solar arrays shall not exceed 25 feet in height as measured from the grade at the base of the structure to the highest point.
2. Mounted solar panels or solar arrays shall not exceed eight feet above the apex of the structure on which it is mounted or the maximum height for buildings in the zoning district in which it is located.
(i) Security.
1. A security fence at a minimum height of eight feet (six feet of chain length fencing with two additional feet of barbed wire strand fencing) together with a gate and locking mechanism shall enclose the perimeter of the solar energy facility equipment to deny access to any individuals not authorized to be on the property and for public safety. The security fence shall be installed in such a manner as to not interfere with wildlife corridors through the project.
2. Access gates and equipment cabinets must be locked when not in use.
3. The names of the manufacturers, installers, facility owners, and facility operators, and their addresses and phone numbers shall be posted on the required fencing at each entrance of a commercial solar energy facility.
4. All solar energy facilities shall have a written emergency response plan that shall be approved by the county's code enforcement department, sheriff's office, fire department, and emergency management agency prior to start of operations. Each commercial solar energy facility shall update its emergency response plan no later than January 1 of each year with a copy provided to all departments and agencies named in this subsection. The emergency response plan shall include the following:
1. The phone number, email address, and street address for all manufacturers, installers, owners, and operators; and
2. The phone number, email address, and mailing address for a representative of the commercial solar energy facility responsible for responding to public inquiries; and
3. The material safety data sheets that apply to any materials on the commercial solar energy facility; and
4. The clearly marked means and instructions for authorized staff to shut down the solar photovoltaic service.
(j) Noise. Inverter noise shall not exceed 40 dBA, measured at the property line.
(k) Glare and lighting.
1. The solar energy system components shall be designed with an antireflective coating or at least shall not produce glare that would constitute a nuisance to occupants of neighboring properties, aircraft, or persons traveling adjacent or nearby roads.
2. If lighting is required, it shall be activated by motion sensors, fully shielded and downcast type where the light does not spill onto any adjacent property or into the night sky.
(l) Maintenance and upkeep.
(1) Systems shall be maintained in accordance with manufacturer's specifications.
The operator of the facility shall maintain the facility, including all buffer screening, in compliance with the approved plans and shall keep the facility free from weeds, dust, trash and debris.
(2) All solar energy facilities shall test for heavy metals in the soil by conducting the currently approved EPA testing method to determine if heaving metals, including, but not limited to, arsenic, lead, copper, mercury, or cadmium are present in the soil each year. The first test shall be before the installation of any equipment, mounting devices, etc. and shall continue each year after until the facility is totally decommissioned. Once the facility is totally decommissioned, one final test shall be conducted.
(m) Site plan review and development permit. A site plan reviewed and approved by the planning division shall be required prior to issuance of a development permit. In addition to requirements for site plans generally, the site plan submission shall include the following information: The proposed location and dimensions of all solar panels, inverters, existing and proposed structures, screening, fencing, property lines, parking, access driveways and turnout locations, ancillary equipment, transmission lines, vegetation, the location of any residences on site and within 100 feet of the perimeter of the facility, the location of any proposed solar access easements, and standard drawings of solar energy system components.
(n) Additional submission requirements. In addition to requirements for information to be provided during the site plan review and development permitting process, the facility shall not be approved for operation until the following are submitted:
1. Copy of all lease agreements and solar access easements.
2. Where interconnection to an electric utility grid is proposed, the applicant shall submit evidence that the electrical utility provider has been informed of the customer's intent to install an interconnected facility with the local electric utility grid. A copy of the approval from the local utility must also be provided before operation of an interconnected facility will be authorized.
3. A decommissioning plan for the anticipated service life of the facility or in the event that the facility is abandoned or has reached its life expectancy.
4. The county may require other studies, reports, certifications, and/or approvals be submitted by the applicant to ensure compliance with this section.
(o) Removal of obsolete or unused systems. All obsolete or unused systems shall be removed. Any structure or equipment associated with the solar farm that is not operated for a continuous period of one year shall be considered an obsolete or unused system and decommissioned per the approved decommission plan.
History
(Ord. of 9-10-2018, att.(9.13.04); Ord. of 1-8-2024(2), §§ 1, 2; Ord. of 7-15-2024(2), §§ 2—13)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.