--- title: Emanuel County Code of Ordinances, Sec. 34-94.1. Required inspections collection: local-codes id: local-code:emanuel-county/code/34-94.1 cite_as: Emanuel County, Ga., Code of Ordinances ยง 34-94.1 canonical_url: https://georgiacommons.org/counties/emanuel/code/34-94.1 md_url: https://georgiacommons.org/counties/emanuel/code/34-94.1.md text_url: https://georgiacommons.org/counties/emanuel/code/34-94.1/text source_url: https://library.municode.com/ga/emanuel_county/codes/code_of_ordinances date: 2025-12-15 status: active jurisdiction: county:emanuel jurisdiction_name: Emanuel County county_fips: "13107" corpus_version: local-codes-emanuel-county-8c109a104435 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/emanuel/code/~part-ii/~chapter-34/~article-iii.md previous: https://georgiacommons.org/counties/emanuel/code/34-94.md next: https://georgiacommons.org/counties/emanuel/code/34-95.md index: https://georgiacommons.org/counties/emanuel.md branch: code edition: As published by Municode, current through 2025-12-15 edition_date_kind: current_through source_publisher: Municode version_id: local-code:emanuel-county/code/34-94.1@2025-12-15-c78976fe40 --- # Emanuel County Code of Ordinances, Sec. 34-94.1. Required inspections > As published by Municode, current through 2025-12-15 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 34 - MANUFACTURED HOMES / Article III - PERMITTING, USE AND PLACEMENT (a) Set-up inspection. All of the following must be completed before calling for the inspection: (1) The home must be completely set-up and tied down. The building official will inspect the piers, anchors, and straps. (2) The sewage lines must be completely installed under the home. IAW manual for on-site sewage management, four-inch schedule forty pipe must be used from the edge of the building to the on-site sewage system. (3) The electrical service must be connected. The building official will inspect the service pole, the outside and inside electrical panel. (4) The water service must be connected. Note: The inspector will need access to the inside of the home. Please leave the door unlocked or make the key available at the time of the inspection. Important: Do not underpin (skirt) the home until the set-up inspection has been approved. (b) Final inspection. The following items must be completed before calling for this inspection: (1) The manufactured home must be underpinned. (2) The landings and steps (porches or decks) must be completed and properly placed. (3) The owner's copy of the on-site sewage final inspection form must be presented to the building official. (c) Permit and inspection information. The permit is valid for six months. Each time an inspection is made, it renews the permit for an additional six months. If the permit goes over six months without an inspection, it will expire unless you call for an extension before it expires. ## History (Amd. of 11-20-2000)