(a) Pathogen control. The following management practices must be met for compliance with pathogen control requirements: (1) Food crops with harvested parts that touch the land surface shall not be harvested for 14 months after septage and/or bulk sewage sludge application; (2) Food crops with harvested parts that develop above the land surface, feed crops, or fiber crops shall not be harvested for 30 days after application of septage and/or bulk sewage sludge; (3) Food crops with harvested parts below the land surface shall not be harvested for 20 months after application of septage and/or bulk sewage sludge; (4) Animals shall not be allowed to graze on the land for 60 days after application of septage and/or bulk sewage sludge; (5) Turf grown on land where bulk sewage sludge is applied shall not be harvested for one year after application of septage and/or bulk sewage sludge; and (6) Public access shall be restricted for 60 days after application of septage and/or bulk sewage sludge. (b) Vector reduction management. The following management practices must be met for compliance with vector reduction requirements. (1) Septage and/or bulk sewage sludge shall be injected below the surface of the land and no significant amount of septage and/or bulk sewage sludge shall be present on the land surface within one hour after injection. Injection may be accomplished by any device(s) that places the septage and/or bulk sewage sludge beneath the solid surface in a narrow trench at a depth of no greater than 12 inches, and a minimum trench depth of four inches, and promptly replaces the cover soil in the same action of trenching and depositing septage and/or bulk sewage sludge. Excavation of a trench followed by placement of septage and/or bulk sewage sludge and later covering of the trench is not considered injection and is prohibited. (2) Subsurface application techniques include plow furrow cover (PFC), subsurface injection (SSI), and terregator injection, which is a patented device for subsurface injection. Placement in trenches and lagoons are considered burial practices and are not approved. An approved storage facility is required. A resting period of one week is required before equipment can be driven over waste-injected land. (c) Lime treatment. In order to diminish pathogens and minimize vector attraction, the pH of septage and/or bulk sewage sludge to be subsurface injected into the soil shall be raised to 12 or higher by lime addition and, without the addition of more lime, shall remain at 12 or higher for two hours prior to subsurface injection.