Skip to content
Georgia Commons
Menu

Fayette County · Code of Ordinances

Fayette County Code of Ordinances

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Part 6 of 8. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

(Code 1992, § 5-39; Ord. No. 2006-16, § 2, 12-14-2006) Sec. 102-105. Approved materials and equipment.

(a) Materials, equipment and devices approved by the building official shall be constructed and installed in accordance with such approval.

(b) Used materials and equipment. The use of used materials which meet the requirements of this chapter for new materials is permitted. Used equipment and devices shall not be reused unless such elements have been reconditioned, tested, placed in good and proper working condition and approved by the building official.

(Code 1992, § 5-40; Ord. No. 2006-16, § 2, 12-14-2006) Sec. 102-106. Modifications.

(a) Wherever there are practical difficulties involved in carrying out the provisions of this chapter, the building official shall have the authority to grant modifications for individual cases, upon application of the owner or owner's representative, provided the building official shall first find that special individual reason makes the strict letter of this chapter impractical and the modification is in compliance with the intent and purpose of this chapter and that such modification does not lessen health, accessibility, life and fire safety, or structural requirements. The details of action granting modifications shall be recorded and entered in the files of the department of building safety.

(b) Areas prone to flooding. The building official shall not grant modifications to any provision related to areas prone to flooding as established by table R301.2(1) of the International Residential Code without the granting of a variance to such provisions by the county board of commissioners.

(Code 1992, § 5-41; Ord. No. 2006-16, § 2, 12-14-2006) Sec. 102-107. Alternative materials, design and methods of construction and equipment.

(a) Applicability. The provisions of this chapter are not intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by this chapter, provided that any such alternative has been approved. An alternative material, design or method of construction shall be approved where the building official finds that the proposed design is satisfactory and complies with the intent of the provisions of this chapter, and that the material, method or work offered is, for the purpose intended, at least the equivalent of that prescribed in this chapter in quality, strength, effectiveness, fire resistance, durability and safety.

(b) Research reports. Supporting data, where necessary to assist in the approval of materials or assemblies not specifically provided for in this chapter, shall consist of valid research reports from approved sources.

(c) Tests. Whenever there is insufficient evidence of compliance with the provisions of this chapter, or evidence that a material or method does not conform to the requirements of this chapter, or in order to substantiate claims for alternative materials or methods, the building official shall have the authority to require tests as evidence of compliance to be made at no expense to the jurisdiction. Test methods shall be as specified in this chapter or by other recognized test standards. In the absence of recognized and accepted test methods, the building official shall approve the testing procedures. Tests shall be performed by an approved agency. Reports of such tests shall be retained by the building official for the period required for retention of public records.

(Code 1992, § 5-42; Ord. No. 2006-16, § 2, 12-14-2006) Sec. 102-108. Coordination of inspections.

Whenever in the enforcement of this chapter or another code or ordinance, the responsibility of more than one code official of the jurisdiction is involved, it shall be the duty of the code officials involved to coordinate their inspections and administrative orders as fully as practicable so that the owners and occupants of the structure shall not be subjected to visits by numerous inspectors or multiple or conflicting orders. Whenever an inspector from any agency or department observes an apparent or actual violation of some provision of some law, ordinance or code not within the inspector's authority to enforce, the inspector shall report the findings to the code official having jurisdiction.

(Code 1992, § 5-43; Ord. No. 2006-16, § 2, 12-14-2006) Sec. 102-109. Cooperation of other officials and officers.

The building official may request, and shall receive, the assistance and cooperation of other officials of this jurisdiction so far as is required in the discharge of the duties required by this chapter or other pertinent law or ordinance.

(Code 1992, § 5-44; Ord. No. 2006-16, § 2, 12-14-2006) Secs. 102-110—102-131. Reserved.

DIVISION 5. BOARD OF APPEALS

Sec. 102-132. Generally.

The board of commissioners of the county (the "board") shall hear and decide appeals of orders, decisions or determinations made by the building official relative to the application and interpretation of this chapter. The board shall adopt rules of procedure for conducting its business, and shall render all decisions and findings in writing to the appellant with a duplicate copy to the building official.

(Code 1992, § 5-51; Ord. No. 2006-16, § 2, 12-14-2006) Sec. 102-133. Limitation on authority.

An application for appeal shall be based on a claim that the true intent of this chapter or the rules legally adopted thereunder have been incorrectly interpreted, the provisions of this chapter do not fully apply, or an equally good or better form of construction is proposed. The board shall have no authority to waive requirements of this chapter.

(Code 1992, § 5-52; Ord. No. 2006-16, § 2, 12-14-2006) Secs. 102-134—102-164. Reserved.

ARTICLE III. PROCEDURES FOR ADMINISTRATION OF THE BUILDING

DIVISION 1. GENERALLY

Sec. 102-165. Applicability.

The provisions of this article apply to the International Building Code, as adopted in section 102-22. In this article the term "building code" means the International Building Code as adopted in section 102-22.

(Code 1992, § 5-101; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-166. Scope.

(a) Applicability. The provisions of the building code shall apply to the construction, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, maintenance, removal and demolition of every building or structure or any appurtenances connected or attached to such buildings or structures.

(b) Exception. Detached one- and two-family dwellings and multiple single-family dwellings (townhouses) not more than three stories above grade plane in height with a separate means of egress and their accessory structures shall comply with the International Residential Code.

(c) Appendices. Provisions in the appendices of the International Building Code shall not apply unless specifically adopted.

(Code 1992, § 5-102; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-167. Intent.

(a) Purpose. The purpose of the building code is to establish the minimum requirements to safeguard the public health, safety and general welfare through structural strength, means of egress facilities, stability, sanitation, adequate light and ventilation, energy conservation, and safety to life and property from fire and other hazards attributed to the built environment and to provide safety to firefighters and emergency responders during emergency operations. The purpose of the building code is not to create or otherwise establish or designate any particular class or group of persons who will or should be especially protected or benefitted by the terms of the building code.

(b) Public duty, warranty and quality control. The permitting, plans examination or inspection conducted with regard to a building or structure in accordance with the building code constitutes a public duty and does not warrant or ensure the absence of any hazard, deficiency or other matter. Any duty created by or based on the building code is transferred to the public, and no private cause of action is created by a breach of such duty. The building code shall not be construed to relieve from or lessen the responsibility of any person, firm or corporation owning, operating or controlling any building or structure for any damages to persons or property caused by defects, nor shall the department of building safety or the county be held as assuming any such liability by reason of the inspections or plans examinations authorized by the building code or any permits or certificates issued under the building code. The building official checks for substantial compliance with the building code, but reviews and inspections performed by the building official pursuant to this Chapter do not create any guarantee or warranty that buildings, structures or service equipment have been constructed in accordance with all provisions of the building code. The permitting, plans examination, or inspection of any building, structure, system, element, or construction document shall not be construed as a warranty of the physical condition or adequacy of such building, structure, system, element, or construction document, including without limitation a representation or warranty that a building or structure is complete, that it is in compliance with the building code or any other law, that it was inspected, that it is safe or ready for occupancy or that it meets any particular degree of quality or workmanship. Quality control of materials and workmanship is not within the purview of the building code except as it relates to the purposes stated therein. The amount and quality of inspection and other services provided is discretionary with the building official and may vary in response to the amount of staff, work load, training and experience, funding and other pertinent factors affecting whether and how inspection is made or whether any hazard, deficiency or similar matter is observed.

(Code 1992, § 5-103; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-168. Referenced codes.

The other codes listed in subsections (1) through (7) of this section and referenced elsewhere in the building code shall be considered part of the requirements of the building code to the prescribed extent of each such reference.

(1) Electrical. The provisions of the ICC Electrical Code shall apply to the installation of electrical systems, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings and appurtenances thereto.

(2) Gas. The provisions of the International Fuel Gas Code shall apply to the installation of gas piping from the point of delivery, gas appliances and related accessories as covered in the building code. These requirements apply to gas piping systems extending from the point of delivery to the inlet connections of appliances and the installation and operation of residential and commercial gas appliances and related accessories.

(3) Mechanical. The provisions of the International Mechanical Code shall apply to the installation, alterations, repairs and replacement of mechanical systems, including equipment, appliances, fixtures, fittings and/or appurtenances, including ventilating, heating, cooling, air conditioning and refrigeration systems, incinerators and other energy-related systems.

(4) Plumbing. The provisions of the International Plumbing Code shall apply to the installation, alteration, repair and replacement of plumbing systems, including equipment, appliances, fixtures, fittings and appurtenances, and where connected to a water sewage system and all aspects of a medical gas system.

(5) Property maintenance. The provisions of the International Property Maintenance Code shall apply to existing structures and premises; equipment and facilities; light, ventilation, space heating, sanitation, life and fire safety hazards; responsibilities of owners, operators and occupants; and occupancy of existing premises and structures.

(6) Fire prevention. The provisions of the International Fire Code shall apply to matters affecting or relating to structures, processes and premises from the hazard of fire and explosion arising from the storage, handling or use of structures, materials or devices; from conditions hazardous to life, property or public welfare in the occupancy of structures or premises; and from the construction, extension, repair, alteration or removal of fire suppression and alarm systems or fire hazards in the structure or on the premises from occupancy or operation.

(7) Energy. The provisions of the International Energy Conservation Code shall apply to all matters governing the design and construction of buildings for energy efficiency.

(8) Swimming pools and spas. The provisions of the International Swimming Pool and Spa Code shall apply to all matters concerning the construction, alteration, movement, renovation, replacement and maintenance of aquatic vessels.

(Code 1992, § 5-104; Ord. No. 2006-16, § 3, 12-14-2006; Ord. No. 2019-08, § 2, 11-14-2019)

Sec. 102-169. Existing structures.

The legal occupancy of any structure existing on the date of adoption of the building code shall be permitted to continue without change, except as is specifically covered in the building code, the International Property Maintenance Code or the International Fire Code, or as is deemed necessary by the building official for the general safety and welfare of the occupants and the public.

(Code 1992, § 5-105; Ord. No. 2006-16, § 3, 12-14-2006) Secs. 102-170—102-191. Reserved.

DIVISION 2. PERMITS

Sec. 102-192. Required.

Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the building code, or to cause any such work to be done, shall first make application to the building official and obtain the required permit. If a licensed contractor performs construction without obtaining any necessary permit, there is a rebuttable presumption that the contractor willfully and deliberately violated the building laws of this jurisdiction.

(Code 1992, § 5-111; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-193. Work exempt from permit.

Exemptions from permit requirements of the building code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of the building code or any other laws or ordinances of this jurisdiction.

Permits shall not be required for the following:

(1) Building:

a. One-story detached accessory structures less than 200 square feet (18.58 m2

) used as tool and storage sheds, playhouses and similar uses.

b. Fences not over six feet (1,829 mm) high.

c. Oil derricks.

d. Retaining walls that are not over four feet (1,219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge or impounding Class I, II or IIIA liquids.

e. Water tanks supported directly on grade if the capacity does not exceed 5,000 gallons (18,925 L) and the ratio of height to diameter or width does not exceed 2:1.

f. Sidewalks and driveways not more than 30 inches (762 mm) above adjacent grade, and not over any basement or story below and are not part of an accessible route.

g. Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work.

h. Temporary motion picture, television and theater stage sets and scenery.

i. Aquatic vessels designed to be filled and drained daily, and that are not connected to a circulatory system.

j. Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.

k. Swings and other playground equipment accessory to detached one- and two-family dwellings.

l. Window awnings supported by an exterior wall which do not project more than 54 inches (1,372 mm) from the exterior wall and do not require additional support of Group R-3 and U occupancies.

m. Nonfixed and movable fixtures, cases, racks, counters and partitions not over five feet nine inches (1,753 mm) in height.

(2) Electrical.

a. Repairs and maintenance. Minor repair work, including the replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles.

b. Radio and television transmitting stations. The provisions of the building code shall not apply to electrical equipment used for radio and television transmissions, but do apply to equipment and wiring for a power supply and the installations of towers and antennas.

c. Temporary testing systems. A permit shall not be required for the installation of any temporary system required for the testing or servicing of electrical equipment or apparatus.

(3) Gas.

a. Portable heating appliance.

b. Replacement of any part that does not alter approval of equipment or make such equipment unsafe.

(4) Mechanical.

a. Portable heating appliance.

b. Portable ventilation equipment.

c. Portable cooling unit.

d. Steam, hot or chilled water piping within any heating or cooling equipment regulated by the building code.

e. Replacement of any part that does not alter approval or make it unsafe.

f. Portable evaporative cooler.

g. Self-contained refrigeration system containing ten pounds (5 kg) or less of refrigerant and actuated by motors of one horsepower (746 W) or less.

(5) Plumbing.

a. The stopping of leaks in drains, water, soil, waste or vent pipe; provided, however, that if any concealed trap, drainpipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with the new material, such work shall be considered as new work and a permit shall be obtained and inspection made as provided in the building code.

b. The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures, and the removal and reinstallation of water closets, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures.

(6) Emergency repairs. Where equipment replacements and repairs must be performed in an emergency situation, the permit application shall be submitted within the next working business day to the building official. For the purposes of this section, emergency shall be defined as an unexpected situation requiring prompt action to safeguard life or limb, health, property and public welfare. This section shall not be construed as allowing work to be done without a permit to restore comfort and convenience items, equipment or systems. Emergency work performed shall not be done contrary to the provisions of the building code.

(7) Repairs. Application or notice to the building official is not required for ordinary repairs to structures, replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles. Such repairs shall not include the cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam or load-bearing support, or the removal or change of any required means of egress, or rearrangement of parts of a structure affecting the egress requirements; nor shall ordinary repairs include addition to, alteration of, replacement or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas, soil, waste, vent or similar piping, electric wiring or mechanical or other work affecting public health or general safety.

(8) Public service agencies. A permit shall not be required for the installation, alteration or repair of generation, transmission, distribution, metering or other related equipment that is under the ownership and control of public service agencies by established right.

(Code 1992, § 5-112; Ord. No. 2006-16, § 3, 12-14-2006; Ord. No. 2007-04, § 1, 3-22-2007; Ord. No. 2019-08, § 3, 11-14-2019)

Sec. 102-194. Application for permit.

(a) Required. To obtain a permit, the applicant shall first file an application therefor in writing on a form furnished by the department of building safety for that purpose. Such application shall:

(1) Identify and describe the work to be covered by the permit for which application is made.

(2) Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work.

(3) Indicate the use and occupancy for which the proposed work is intended.

(4) Be accompanied by construction documents and other information as required in division 3 of this article.

(5) State the valuation of the proposed work.

(6) Be signed by the applicant or the applicant's authorized agent.

(7) Give such other data and information as required by the building official.

(b) Action on application. The building official shall examine or cause to be examined applications for permits and amendments thereto within a reasonable time after filing. If the application or the construction documents do not conform to the requirements of pertinent laws, the building official shall reject such application in writing, stating the reasons therefor. If the building official is satisfied that the proposed work conforms to the requirements of the building code and laws and ordinances applicable thereto, the building official shall issue a permit therefor as soon as practicable.

(c) Time limitation of application. An application for a permit for any proposed work shall be deemed to have been abandoned 180 days after the date of filing, unless such application has been pursued in good faith or a permit has been issued;

except that the building official is authorized to grant one extension of time for an additional period not exceeding 180 days. No application shall be extended more than once. The extension shall be requested in writing and justifiable cause demonstrated. A request for an extension must be received by the building official prior to the expiration of the application. The building official is not required to notify the applicant prior to the application's expiration or that the application has expired.

(Code 1992, § 5-113; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-195. Validity of permit.

The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinance of the jurisdiction. Permits presuming to give authority to violate or cancel the provisions of the building code or other ordinances of the jurisdiction shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring the correction of errors in the construction documents and other data. The building official is also authorized to prevent occupancy or use of a structure where in violation of the building code or of any other ordinances of this jurisdiction.

(Code 1992, § 5-114; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-196. Expiration.

Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. A minimum of one inspection approval must be obtained as evidence that work was commenced or that work has continued.

The determination as to whether work was suspended shall be based on the most recent inspection approval date. The building official is authorized to grant, in writing, one extension of time for an additional period of not more than 180 days provided no changes have been made or will be made in the original construction documents for such work. No permit shall be extended more than once. The extension shall be requested in writing and justifiable cause demonstrated.

Requests for extensions must be received by the building official prior to the expiration of the permit. The building official is not required to notify the permittee prior to the permit's expiration or that the permit has expired. The fee for an extension shall be one-half the amount required for a new permit for such work.

(Code 1992, § 5-115; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-197. Suspension or revocation.

The building official is authorized to suspend or revoke a permit issued under the provisions of the building code wherever the permit is issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any ordinance or regulation or any of the provisions of the building code.

(Code 1992, § 5-116; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-198. Placement of permit.

Work for which a permit is required shall not be commenced until the building permit or copy thereof is posted on the site of the work until the completion of the project. The posted permit shall be visible from the street and maintained in such location by the permittee until final approval has been granted by the building official.

(Code 1992, § 5-117; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-199. Responsibility.

It shall be the duty of every person who performs work for which the building code is applicable, to comply with the building code.

(Code 1992, § 5-118; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-200. Approved construction documents.

Work for which a permit is required shall not be commenced until the permittee has made available approved construction documents on the premises and in such a position to allow the building official convenient access and use. These items shall be protected from the elements and maintained in such location by the permittee until final approval has been granted by the building official.

(Code 1992, § 5-119; Ord. No. 2006-16, § 3, 12-14-2006; Ord. No. 2019-08, § 4, 11-14-2019)

Sec. 102-201. Work without a permit: investigation required.

Whenever any work for which a permit is required has been commenced without first obtaining said permit, a stop work order shall be issued pursuant to Division 9 of this article and a special investigation shall be made before a permit may be issued for such work.

(Code 1992, § 5-120; Ord. No. 2006-16, § 3, 12-14-2006; Ord. No. 2019-08, § 5, 11-14-2019)

Secs. 102-202—102-225. Reserved.

DIVISION 3. CONSTRUCTION DOCUMENTS

Sec. 102-226. Submittal documents.

(a) Special conditions. Construction documents, statement of special inspections and other data shall be submitted in one or more sets with each application for a permit. The construction documents shall be prepared by a registered design professional where required by the statutes of the jurisdiction in which the project is to be constructed. Where special conditions exist, the building official is authorized to require additional construction documents to be prepared by a registered design professional.

(b) Exception. The building official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for is such that review of construction documents is not necessary to obtain compliance with the building code.

(c) Information on construction documents. Construction documents shall be dimensioned and drawn to scale upon suitable material. Electronic media documents are permitted to be submitted when approved by the building official.

Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of the building code and relevant laws, ordinances, rules and regulations, as determined by the building official. Sketches and pencil or other erasable media used to prepare construction documents shall not be accepted by the building official.

(d) Policies and procedures. The building official shall establish policies and procedures for the minimum standards of acceptance for construction documents.

(e) Fire protection system shop drawings. Shop drawings for the fire protection systems shall be submitted to indicate conformance with the building code and the construction documents and shall be approved prior to the start of system installation. Shop drawings shall contain all information as required by the referenced installation standards in chapter 9.

(f) Means of egress. The construction documents shall show in sufficient detail the location, construction, size and character of all portions of the means of egress in compliance with the provisions of the building code. In other than occupancies in groups R-2, R-3, and I-1, the construction documents shall designate the number of occupants to be accommodated on every floor, and in all rooms and spaces.

(g) Exterior wall envelope. Construction documents for all buildings shall describe the exterior wall envelope in sufficient detail to determine compliance with the building code. The construction documents shall provide details of the exterior wall envelope as required, including flashing, intersections with dissimilar materials, corners, end details, control joints, intersections at roof, eaves or parapets, means of drainage, water-resistive membrane and details around openings.

(h) Manufacturer's installation instructions. The construction documents shall include manufacturer's installation instructions that provide supporting documentation that the proposed penetration and opening details described in the construction documents maintain the weather resistance of the exterior wall envelope. The supporting documentation shall fully describe the exterior wall system which was tested, where applicable, as well as the test procedure used.

(Code 1992, § 5-131; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-227. Site plan.

The construction documents submitted with the application for permit shall be accompanied by a site plan showing the size and location of new construction and existing structures on the site, distances from lot lines, the established street grades and the proposed finished grades and, as applicable, flood hazard areas, floodways, and design flood elevations; and it shall be drawn in accordance with an accurate boundary line survey. In the case of demolition, the site plan shall show construction to be demolished and the location and size of existing structures and construction that are to remain on the site or plot. The building official is authorized to waive or modify the requirement for a site plan when the application for permit is for alteration or repair or when otherwise warranted.

(Code 1992, § 5-132; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-228. Examination of documents.

The building official shall examine or cause to be examined the accompanying construction documents and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of the building code and other pertinent laws or ordinances.

(1) Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by a stamp as REVIEWED FOR CODE COMPLIANCE. One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative.

(2) Previous approvals. The building code shall not require changes in the construction documents, construction or designated occupancy of a structure for which a lawful permit has been heretofore issued or otherwise lawfully authorized, and the construction of which has been pursued in good faith within 180 days after the effective date of the building code and has not been abandoned.

(3) Phased approval. The building official is authorized to issue a permit for the construction of foundations or any other part of a building or structure before the construction documents for the whole building or structure have been submitted, provided that adequate information and detailed statements have been filed complying with pertinent requirements of the building code. The holder of such permit for the foundation or other parts of a building or structure shall proceed at the holder's own risk with the building operation and without assurance that a permit for the entire structure will be granted.

(Code 1992, § 5-133; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-229. Design professional in responsible charge.

(a) Generally. When it is required that documents be prepared by a registered design professional, the building official shall be authorized to require the owner to engage and designate on the building permit application a registered design professional who shall act as the registered design professional in responsible charge. If the circumstances require, the owner shall designate a substitute registered design professional in responsible charge who shall perform the duties required of the original registered design professional in responsible charge. The building official shall be notified in writing by the owner if the registered design professional in responsible charge is changed or is unable to continue to perform the duties. The registered design professional in responsible charge shall be responsible for reviewing and coordinating submittal documents prepared by others, including phased and deferred submittal items, for compatibility with the design of the building. Where structural observation is required, the statement of special instructions shall name the individual or firms who are to perform structural observation and describe the stages of construction at which structural observation is to occur.

(b) Deferred submittals. For purposes of this section, deferred submittals are defined as those portions of the design that are not submitted at the time of the application and that are to be submitted to the building official within a specified period. Deferral of any submittal items shall have the prior approval of the building official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review by the building official. Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until the design and submittal documents have been approved by the building official.

(Code 1992, § 5-134; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-230. Amended construction documents.

Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents. Willful and prejudicial departure from or disregard of construction documents in any material respect without the approval of the building official is unlawful.

(Code 1992, § 5-135; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-231. Retention of construction documents.

One set of approved construction documents shall be retained by the building official for a period of not less than 180 days from date of completion of the permitted work, or as required by state or local laws.

(Code 1992, § 5-136; Ord. No. 2006-16, § 3, 12-14-2006) Secs. 102-232—102-255. Reserved.

DIVISION 4. FEES

Sec. 102-256. Payment of fees.

A permit shall not be valid until the fees prescribed by law have been paid. Nor shall an amendment to a permit be released until the additional fee, if any, has been paid.

(Code 1992, § 5-141; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-257. Schedule of permit and other fees.

(a) Schedule. On buildings, structures, electrical, gas, mechanical and plumbing systems or alterations requiring a permit, a fee for each permit or other designated activity shall be paid as required, in accordance with the schedule as established by the board of commissioners of the county.

(b) Investigation fees: work without a permit. Where work, for which a permit is required, has been commenced prior to obtaining a permit, an investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by the building code. The minimum investigation fee shall be the same as the minimum permit fee set forth in accordance with the schedule as established by the board of commissioners of the county. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of the building code nor from any penalty prescribed by law.

(Code 1992, § 5-142; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-258. Building permit valuations.

The applicant for a permit shall provide an estimated permit value at the time of application. Permit valuations shall include total value of the work, including materials and labor, for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment and other permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official.

(Code 1992, § 5-143; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-259. Related fees.

The payment of the fee for the construction, alteration, removal or demolition for work done in connection to or concurrently with the work authorized by a building permit shall not relieve the applicant or holder of the permit from the payment of other fees that are prescribed by law.

(Code 1992, § 5-144; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-260. Refunds.

(a) The building official is authorized to establish a refund policy.

(b) Refunds shall not be given:

(1) For an application or permit that has expired.

(2) If more than 180 days has elapsed from the application submittal date.

(3) If more than 180 days has elapsed from the permit issuance date.

(4) For that component of the permit fee which is representative of the development impact fee.

(5) For plan reviews already performed.

(6) If an inspection has been performed.

(Code 1992, § 5-145; Ord. No. 2006-16, § 3, 12-14-2006; Ord. No. 2019-08, § 6, 11-14-2019)

Secs. 102-261—102-283. Reserved.

DIVISION 5. INSPECTIONS

Sec. 102-284. Generally.

Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the building code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the building code or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection.

(Code 1992, § 5-151; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-285. Preliminary inspection.

Before issuing a permit, the building official is authorized to examine or cause to be examined buildings, structures and sites for which an application has been filed.

(Code 1992, § 5-152; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-286. Required inspections.

The building official, upon notification, shall make the inspections set forth in this section.

(1) Footing and foundation inspection. Footing and foundation inspection shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C94, the concrete need not be on the job.

(2) Concrete slab and under-floor inspection. Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor.

(3) Lowest floor elevation. In flood hazard areas, upon placement of the lowest floor, including the basement, and prior to further vertical construction, the elevation certification required in section 161.2.5 shall be submitted to the building official.

(4) Frame inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fireblocking and bracing are in place and pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved.

(5) Lath and gypsum board inspection. Lath and gypsum board inspections shall be made after lathing and gypsum board, interior and exterior, is in place, but before any plastering is applied or gypsum board joints and fasteners are taped and finished.

Exception. Gypsum board that is not part of a fire-resistance-rated assembly or a shear assembly.

(6) Fire-resistant penetrations. Protection of joints and penetrations in fireresistance-rated assemblies shall not be concealed from view until inspected and approved.

(7) Energy efficiency inspections. Inspections shall be made to determine compliance with the International Energy Conservation Code and shall be include, but not be limited to, inspections for:

a. Envelope insulation R and U values;

b. Fenestration U value;

c. Duct system R value; and

d. HVAC and water-heating equipment efficiency.

(8) Other inspections. In addition to the inspections specified above, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of the building code and other laws that are enforced by the department of building safety.

(9) Lot and foundation survey. A survey of the lot and foundation shall be required by the building official to verify that the building or structure is located within the designated setbacks and in accordance with the approved plans for the following:

a. For all newly constructed single-family dwellings.

b. For residential accessory structures, pools and additions located within two feet of the setback, floodplain and/or watershed protection areas.

The foundation survey shall occur after concrete is placed and shall be submitted to and approved by the county planning and zoning department and engineering department prior to the commencement of any framing operations or work. It shall be unlawful to commence any framing operations or work until the foundation survey is approved by the county planning and zoning department and engineering department.

Exception. For pools, the survey shall be submitted to and approved by the county planning and zoning department and engineering department after excavation and the placement of forms and reinforcing steel, but prior to the placement of any concrete, shotcrete or gunite. For pre-manufactured pools, the survey shall be submitted to and approved by the county planning and zoning department and engineering department after excavation, but prior to the placement of the pool shell.

(10) Special inspections. For special inspections, see section 1704.

(11) Final inspection. The final inspection shall be made after all work required by the building permit is completed.

(Code 1992, § 5-153; Ord. No. 2006-16, § 3, 12-14-2006; Ord. No. 2019-08, § 7, 11-14-2019)

Sec. 102-287. Inspection agencies.

The building official is authorized to accept reports of approved inspection agencies, provided such agencies satisfy the requirements as to qualifications and reliability.

(Code 1992, § 5-154; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-288. Inspection requests.

It shall be the duty of the permit holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work that are required by the building code.

(Code 1992, § 5-155; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-289. Approval required.

Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or shall notify the permit holder or agent wherein the same fails to comply with the building code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the building official.

(Code 1992, § 5-156; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-290. Work covered without inspection approval; investigation required.

Whenever any work for which a permit is required has been covered without first obtaining the necessary inspection approval, a special investigation shall be made before subsequent inspections are approved. Covered work shall be exposed to allow for an inspection.

(Code 1992, § 5-157; Ord. No. 2006-16, § 3, 12-14-2006; Ord. No. 2019-08, § 8, 11-14-2019)

Secs. 102-291—102-313. Reserved.

DIVISION 6. CERTIFICATE OF OCCUPANCY

Sec. 102-314. Use and occupancy.

No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building or structure or portion thereof shall be made until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the building code or of other ordinances of the jurisdiction.

(Code 1992, § 5-161; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-315. Certificate issued.

After the building official inspects the building or structure and finds no violations of the provisions of the building code or other laws that are enforced by the department of building safety, the building official shall issue a certificate of occupancy which shall contain the following:

(1) The building permit number.

(2) The address of the structure.

(3) The name and address of the owner.

(4) A description of that portion of the structure for which the certificate is issued.

(5) A statement that the described portion of the structure has been inspected for compliance with the requirements of the building code for the occupancy and division of occupancy and the use for which the proposed occupancy is classified.

(6) The name of the building official.

(7) The edition of the building code under which the permit was issued.

(8) The use and occupancy, in accordance with the provisions of the International Building Code.

(9) The type of construction as defined in the International Building Code.

(10) The design occupant load.

(11) If an automatic sprinkler system is provided and whether the sprinkler system is required.

(12) Any special stipulations and conditions of the building permit.

(Code 1992, § 5-162; Ord. No. 2006-16, § 3, 12-14-2006; Ord. No. 2019-08, § 9, 11-14-2019)

Sec. 102-316. Provision of temporary certificate of occupancy.

The board of commissioners finds that certain nonresidential structures may be of such a size that requiring 100 percent completion of the structures can impact the timely legitimate and safe use of a substantial part of the structures. Components of this type of structures could be safe for persons to use, work in, or visit so long as certain minimum standards are met. The minimum standards within this chapter have been developed in recognition of the need to facilitate the early use of certain structures where requiring 100 percent of project completion could impact the timely legitimate and safe use of the structures based upon its size.

(Code 1992, § 5-163; Ord. No. 2006-16, § 3, 12-14-2006; Ord. No. 2014-01, § 1(5-163), 1-15-2014)

Sec. 102-317. Temporary certificate of occupancy.

The building official is authorized to issue a temporary certificate of occupancy for nonresidential structures when all conditions for such issuance have been satisfied.

The following criteria are minimum standards which must be met prior to any structure being eligible for a temporary certificate of occupancy:

(1) The development shall be an approved nonresidential use being constructed within a nonresidential zoning district.

(2) The development shall be a minimum of 50 acres.

(3) The building shall total a minimum of 25,000 square feet.

(4) All fees and every other charge due the county for the structure shall be current and paid in full.

(5) The area of the structure for which a temporary certificate of occupancy is being sought comprises at least 75 percent of the structure.

(6) Every part of a structure for which a temporary certificate of occupancy is being requested shall meet all minimum standard codes (building, fire, etc.)

applicable to all nonresidential structures in the county. Separation of the area specified by the temporary certificate of occupancy from any area of ongoing construction will be required. Fire marshal release shall also be required. The building official shall identify the limits of the occupied area.

(Ord. No. 2014-01, § 3(5-164), 1-15-2014) Sec. 102-318. Request for temporary certificate of occupancy.

The owner/licensed contractor, to which a nonresidential building permit was issued, must submit in writing a request for issuance of a temporary certificate of occupancy. This request shall include justification of the proposed need, construction plans identifying the requested area, and signed agreement holding the county harmless in the event of any claims that may arise during the period that the temporary certificate is in effect.

(Ord. No. 2014-01, § 3(5-165), 1-15-2014) Sec. 102-319. Time limit for temporary certificate of occupancy.

The duration of the temporary certificate of occupancy shall not exceed 45 days.

(Ord. No. 2014-01, § 3(5-166), 1-15-2014) Sec. 102-320. Expiration of temporary certificate of occupancy.

The temporary certificate of occupancy shall expire on the date provided thereon or on the date of issuance of a certificate of occupancy, whichever is first to occur.

However, if the temporary certificate of occupancy expires prior to the issuance of a certificate of occupancy, the property owner acknowledges that the property owner is subject to a daily fine for every day after the expiration of the temporary certificate of occupancy until the issuance of a certificate of occupancy.

(Ord. No. 2014-01, § 3(5-167), 1-15-2014) Sec. 102-321. Revocation.

The building official is authorized to, in writing, suspend or revoke a certificate of occupancy issued under the provisions of the building code wherever the certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure or portion thereof is in violation of any ordinance or regulation or any of the provisions of the building code.

(Code 1992, § 5-164; Ord. No. 2006-16, § 3, 12-14-2006; Ord. No. 2014-01, § 2, 1-15-2014)

Secs. 102-322—102-337. Reserved.

DIVISION 7. SERVICE UTILITIES

Sec. 102-338. Connection of service utilities.

No person shall make connections from a utility, source of energy, fuel or power to any building or system that is regulated by the building code for which a permit is required, until approved by the building official.

(Code 1992, § 5-171; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-339. Temporary connection.

The building official shall have the authority to authorize the temporary connection of the building or system to the utility, source of energy, fuel or power.

(Code 1992, § 5-172; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-340. Authority to disconnect service utilities.

The building official shall have the authority to authorize disconnection of the utility service to the building, structure or system regulate by the building code and the referenced codes, in case of emergency where necessary to eliminate an immediate hazard to life or property. The building official shall notify the serving utility and whenever possible the owner and occupant of the building, structure or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnection, the owner or occupant of the building, structure or service system shall be notified in writing as soon as practical thereafter.

(Code 1992, § 5-173; Ord. No. 2006-16, § 3, 12-14-2006) Secs. 102-341—102-368. Reserved.

DIVISION 8. VIOLATIONS

Sec. 102-369. Unlawful acts.

It shall be unlawful for any person, firm or corporation to erect, construct, alter, extend, repair, move, remove, demolish or occupy any building, structure or equipment regulated by the building code, or cause same to be done, in conflict with or in violation of any of the provisions of the building code.

(Code 1992, § 5-181; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-370. Notice.

The building official is authorized to serve a notice of violation or order on the person responsible for the erection, construction, alteration, extension, repair, moving, removal, demolition or occupancy of a building or structure in violation of the provisions of the building code, or in violation of a permit or certificate issued under the provisions of the building code. Such order shall direct the discontinuance of the illegal action or condition and the abatement of the violation.

(Code 1992, § 5-182; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-371. Prosecution.

If the notice of violation is not complied with in the time prescribed by such notice, the building official is authorized to request the solicitor general of the county state court to institute the appropriate proceeding at law or in equity to restrain, correct or abate such violation, or to require the removal or termination of the unlawful occupancy of the building or structure in violation of the provisions of the building code or of the order or direction made pursuant thereto.

(Code 1992, § 5-183; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-372. Penalties.

Any person who violates a provision of the building code or fails to comply with any of the requirements thereof or who erects, constructs, alters or repairs a building or structure in violation of the approved construction documents or directive of the building official, or of a permit or certificate issued under the provisions of the building code, shall be subject to penalties as prescribed by law.

Each day that a violation continues after due notice has been served shall be deemed a separate offense.

(Code 1992, § 5-184; Ord. No. 2006-16, § 3, 12-14-2006) Secs. 102-373—102-402. Reserved.

DIVISION 9. STOP WORK ORDER

Sec. 102-403. Authority.

Whenever the building official finds any work regulated by the building code being performed in a manner either contrary to the provisions of the building code, other pertinent laws or ordinances implemented through the enforcement of the building code, or dangerous or unsafe, the building official is authorized to issue a stop work order.

(Code 1992, § 5-186; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-404. Issuance.

The stop work order shall be in writing and shall be given to the owner of the property involved, or to the owner's agent or to the person doing the work. Upon issuance of a stop work order, the cited work shall immediately cease. The stop work order shall state the reason for the order, and the conditions under which the cited work will be permitted to resume.

(Code 1992, § 5-187; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-405. Unlawful continuance.

Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to penalties as prescribed by law.

(Code 1992, § 5-188; Ord. No. 2006-16, § 3, 12-14-2006) Secs. 102-406—102-423. Reserved.

DIVISION 10. EMERGENCY MEASURES

Sec. 102-424. Imminent danger.

When, in the opinion of the building official, there is imminent danger of failure or collapse of a building that endangers life, or when any building or part of a building has fallen and life is endangered by the occupation of the building, or when there is actual or potential danger to the building occupants or those in the proximity of any structure because of explosives, explosive fumes or vapors, or the presence of toxic fumes, gases, or materials, or operation of defective or dangerous equipment, the building official is hereby authorized an empowered to order and require the occupants to vacate the premises forthwith. The building official shall cause to be posted at each entrance to such structure a notice reading as follows:

DANGER!—NO ENTRY. It shall be unlawful for any person to enter such structure except for the purpose of securing the structure, making the required repairs, removing the hazardous condition, or of demolishing the same.

(Code 1992, § 5-191; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-425. Temporary safeguards.

Notwithstanding other provisions of the building code, whenever, in the opinion of the building official, there is imminent danger due to an unsafe condition, the building official shall order the necessary work to be done, including the boarding up of openings, to render such structure temporarily safe whether or not the legal procedure herein described has been instituted; and shall cause such other action to be taken as the building official deems necessary to meet such emergency.

(Code 1992, § 5-192; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-426. Closing streets.

When necessary for public safety, the building official shall temporarily close structures and close, or order the authority having jurisdiction to close, sidewalks, streets, public ways and places adjacent to unsafe structures, and prohibit the same from being utilized.

(Code 1992, § 5-193; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-427. Emergency repairs.

For the purposes of this section, the building official shall employ the necessary labor and materials to perform the required work as expeditiously as possible.

(Code 1992, § 5-194; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-428. Costs of emergency repairs.

Costs incurred in the performance of emergency work shall be paid by the jurisdiction. The legal counsel of the jurisdiction shall institute appropriate action against the owner of the premises where the unsafe structure is or was located for the recovery of such costs.

(Code 1992, § 5-195; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-429. Hearing.

Any person ordered to take emergency measures shall comply with such order forthwith. Any affected person shall thereafter, upon petition directed to the board of commissioners of the county, be afforded a hearing as described in the building code.

(Code 1992, § 5-196; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-430. Emergency declaration.

In the event of a national, state, or local emergency declaration, the building official may waive or augment the provisions of this chapter as needed during the periods of emergency to protect public safety.

(Code 1992, § 5-197; Ord. No. 2006-16, § 3, 12-14-2006) Sec. 102-431. Disaster assessment.

(a) Notification. Upon notification from emergency first responder personnel, law enforcement personnel or others of a disaster to a building or structure, the building official shall make or cause to be made any necessary visual, nondestructive inspections to determine:

(1) Immediate hazards that jeopardize public safety, health or general welfare;

(2) Extent of damage;

(3) Necessity to evacuate or condemn the building or structure;

(4) Necessity to disconnect or authorize reestablishment of utilities;

(5) What permits will be required; and

(6) Whether plans are necessary.

(b) Posting of placards. Placards shall be clearly posted at each entrance of the building or structure immediately upon completion of a disaster assessment as follows:

(1) Inspected—No Restriction on Lawful Use or Occupancy (Green); or

(2) Danger!—Limited Entry (Yellow); or

(3) Danger!—No Entry (Red).

It shall be unlawful to remove placards posted by the building official.

(Code 1992, § 5-198; Ord. No. 2006-16, § 3, 12-14-2006; Ord. No. 2019-08, § 10, 11-14-2019)

Secs. 102-432—102-460. Reserved.

ARTICLE IV. PROCEDURES FOR THE ADMINISTRATION OF THE

RESIDENTIAL ONE- AND TWO-FAMILY DWELLING CODE

DIVISION 1. GENERALLY

Sec. 102-461. Application to residential code.

The provisions of this article apply to the International Residential Code for Oneand Two-Family Dwellings, as adopted in section 102-22. In this article the term residential code means the International Residential Code for One- and TwoFamily Dwellings as adopted in section 102-22.

(Code 1992, § 5-201; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-462. Scope.

The provisions of the International Residential Code for One- and Two-Family Dwellings shall apply to the construction, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, removal and demolition of detached one- and two-family dwellings and townhouses not more than three stories above grade in height with a separate means of egress and their accessory structures.

(Code 1992, § 5-202; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-463. Purpose.

The purpose of the residential code is to provide minimum requirements to safeguard the public safety, health and general welfare through affordability, structural strength, means of egress facilities, stability, sanitation, light and ventilation, energy conservation and safety to life and property from fire and other hazards attributed to the built environment. The purpose of the residential code is not to create or otherwise establish or designate any particular class or group of persons who will or should be especially protected or benefitted by the terms of the residential code.

(Code 1992, § 5-203; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-464. Public duty, warranty and quality control.

The permitting, plans examination or inspection conducted with regard to a building or structure in accordance with the residential code constitutes a public duty and does not warrant or ensure the absence of any hazard, deficiency or other matter. Any duty created by or based on the residential code is transferred to the public, and no private cause of action is created by a breach of such duty. The residential code shall not be construed to relieve from or lessen the responsibility of any person, firm or corporation owning, operating or controlling any building or structure for any damages to persons or property caused by defects, nor shall the department of building safety or the county be held as assuming any such liability by reason of the inspections or plans examinations authorized by the residential code or any permits or certificates issued under the residential code. The building official checks for substantial compliance with the residential code, but reviews and inspections performed by the building official pursuant to this chapter do not create any guarantee or warranty that buildings, structures or service equipment have been constructed in accordance with all provisions of the residential code. The permitting, plans examination, or inspection of any building, structure, system, element, or construction document shall not be construed as a warranty of the physical condition or adequacy of such building, structure, system, element, or construction document, including, without limitation, a representation or warranty that a building or structure is complete, that it is in compliance with the residential code or any other law, that it was inspected, that it is safe or ready for occupancy or that it meets any particular degree of quality or workmanship. Quality control of materials and workmanship is not within the purview of the residential code except as it relates to the purposes stated therein. The amount and quality of inspection and other services provided is discretionary with the building official and may vary in response to the amount of staff, work load, training and experience, funding and other pertinent factors affecting whether and how inspection is made or whether any hazard, deficiency or similar matter is observed.

(Code 1992, § 5-204; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-465. Existing structures.

(a) The legal occupancy of any structure existing on the date of adoption of the residential code shall be permitted to continue without change, except as is specifically covered in the residential code, the International Property Maintenance Code or the International Fire Code, or as is deemed necessary by the building official for the general safety and welfare of the occupants and the public.

(b) Additions, alterations or repairs. Additions, alterations or repairs to any structure shall conform to the requirements for a new structure without requiring the existing structure to comply with all of the requirements of the residential code, unless otherwise stated. Additions, alterations or repairs shall not cause an existing structure to become unsafe or adversely affect the performance of the building.

(Code 1992, § 5-205; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-466. Appendices.

Provisions in the appendices shall not apply unless specifically referenced herein or in the adopting ordinance.

(Code 1992, § 5-206; Ord. No. 2006-16, § 4, 12-14-2006; Ord. No. 2019-08, § 11, 11-14-2019)

Secs. 102-467—102-485. Reserved.

DIVISION 2. PERMITS

Sec. 102-486. Required.

Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the residential code, or to cause any such work to be done, shall first make application to the building official and obtain the required permit. If a licensed contractor performs construction without obtaining any necessary permit, there is a rebuttable presumption that the contractor willfully and deliberately violated the building laws of this jurisdiction.

(Code 1992, § 5-211; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-487. Work exempt from permit.

Exemption from permit requirements of the residential code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of the residential Code or any other laws or ordinances of this jurisdiction. All work exempt from a permit shall comply with chapter 110, pertaining to zoning. Although work may be exempt from a building permit, separate electrical, fuel, gas, mechanical or plumbing permits may be required and vice-versa. Permits shall not be required for the following:

(1) Building.

a. One-story detached accessory structures less than 200 square feet (18.58 m2

) used as tool and storage sheds, playhouses, and similar uses.

b. Fences not over eight feet (2438.4 mm) high. For the purposes of this section, the term fences means lightweight structures made of posts and boards, wire, pickets, or rails commonly used as an enclosure for a field or yard.

c. Walls not over four feet (1219.2 mm) in height measured from the grade to the top of the wall, unless supporting a surcharge. For the purposes of this section, the term walls means structures made of masonry or concrete used as an enclosure for a field or yard.

d. Concrete or masonry pilasters not over eight feet (2438.4 mm) high and that do not exceed a minimum 31

/2:1 or a maximum 1:1 height-to-width ratio used in conjunction with fences or walls. Example: 3.5:1 equals eight feet or 96 inches + 3.5 equals 27.5 inches square pilaster and footing 1:1 equals eight feet.

e. Retaining walls that are not over four feet (1219.2 mm) in height measured from the grade to the top of the wall, unless supporting a surcharge. For the purposes of this section, the term retaining walls means structures made of masonry, concrete, timber or similar materials used to retain earth, water, or other lateral pressure. For clarification purposes, cast in place walls that are part of the original foundation wall and retain earth, water, or other lateral pressure are not to be considered as retaining walls. Note: 1:1 ratio maximum length. If 45-degree angle at end of wall, 1.5:1 maximum ratio is allowed.

f. Water tanks supported directly upon grade if the capacity does not exceed 5,000 gallons (18,927 L) and the ratio of height to diameter or width does not exceed 2:1.

g. Sidewalks and driveways.

h. Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work; shelving, casing, baseboards, wainscoting, or similar mill work.

i. Aquatic vessels designed to be filled and drained daily, and that are not connected to a circulation system.

j. Swings and other playground equipment.

k. Window awnings supported by an exterior wall which do not project more than 54 inches (1372 mm) from the exterior wall and do not require additional support.

l. Decks not more than 30 inches (762 mm) above adjacent grade and not over any basement or story below, unless part of the required egress.

m. Screen and storm doors, storm shutters and doors, and window screens.

n. Roofing repairs and replacement, provided the new roofing material is identical to the existing roofing material, and the repair or replacement of structural sheathing (e.g. plywood, OSB, etc.) does not exceed 128 square feet (11.9 m2

). This exemption does not apply to the supporting structural system or components (e.g. trusses, rafters, ceiling joists, etc.).

o. Siding applied over existing siding; the replacement of vinyl or aluminum siding with hardboard panel siding. This exemption does not apply to the removal of structural panel sheathing.

p. Door and window replacement, provided the opening size, location, and operation (e.g. casement, single-hung, horizontal slider, etc.) remain the same; vehicle garage doors and garage door openers at existing approved vehicle garage door openings.

q. Guards (guardrails), stairs, and handrails associated with changes in elevation that are not associated with a structure as a means of egress element (e.g. landscape elevation changes).

r. Rain gutters and associated appurtenances.

s. Pull down stairs at existing approved attic access openings, provided the installation does not include the cutting away of any wall, partition, ceiling joist or portion thereof, or the removal or cutting of any structural beam or load-bearing support.

(2) Electrical.

a. Minor repair or maintenance work, including the replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles.

b. Low voltage systems including telecommunication, computer networking, security, audio and video systems; low voltage landscape lighting.

c. Installation or replacement of ceiling fans or light fixtures at existing approved permanently installed lighting outlet locations.

d. Replacement of switches for lighting and receptacle outlets at existing approved permanently installed device locations, provided the new device type, voltage, ampacity, and method of grounding are identical to the existing device.

e. Replacement of receptacle outlets at existing approved permanently installed outlet locations, provided the new outlet type, voltage, ampacity, and method of grounding are identical to the existing outlet.

f. Installation or replacement of electric cooking, food refrigeration, dishwashing, and clothes washing appliances, provided the installation or replacement does not involve or require the relocation of the existing approved permanently installed receptacle outlet or wiring; the approved existing circuit voltage and ampacity is within the appliance's specifications; and the appliance is installed in accordance with the manufacturer's installation instructions. This section includes microwaves, cooking exhaust hoods, ranges, ovens, warming drawers, dishwashers, clothes washers, and clothes dryers. This section does not include water heaters, furnaces, or ventilation equipment.

g. Replacement of any overcurrent device of the required capacity in the same location, provided the new overcurrent device manufacturer, type and rating are identical to the existing overcurrent device.

h. Temporary decorative seasonal lighting.

(3) Fuel gas.

a. Portable heating, cooking or clothes drying appliances.

b. Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe.

c. Portable fuel-cell appliances that are not connected to a fixed piping system and are not interconnected to a power grid.

d. Installation or replacement of gas cooking and clothes drying appliances, provided the installation or replacement does not involve or require the replacement or rearrangement of valves or pipes; the approved existing piping system fuel type and output is within the appliance's specifications; and the appliance is installed in accordance with the manufacturer's installation instructions. This section includes ranges, ovens, grills, barbeques, and clothes dryers. This section does not include factorybuilt fireplaces, water heaters, or furnaces.

e. Underground and above-ground storage tanks for liquefied petroleum gas (propane).

(4) Mechanical.

a. Portable heating appliances.

b. Portable ventilation appliances.

c. Portable cooling units.

d. Steam, hot or chilled water piping within any heating or cooling equipment regulated by the residential code.

e. Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe.

f. Portable evaporative coolers.

g. Self-contained refrigeration systems containing ten pounds (4.54 kg) or less of refrigerant or that are actuated by motors of one horsepower (746

W) or less.

h. Portable fuel-cell appliances that are not connected to a fixed piping system and are not interconnected to a power grid.

(5) Plumbing.

a. Water filtration systems or water softeners.

b. Replacement of sinks, lavatories, faucets, and water closets at existing approved permanently installed locations, provided the new sink, lavatory, faucet and water closet does not involve or require the replacement or rearrangement of valves or pipes.

c. Private sewage disposal systems, septic tanks, disposal fields and seepage pits.

d. The stopping of leaks in drains, water, soil, waste or vent pipe, provided that if any concealed trap, drainpipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with the new material, such work shall be considered as new work and a permit shall be obtained and inspection made as provided in the residential code.

e. The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures, and the removal and reinstallation of water closets, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures.

f. Location, drilling or installation of well casing.

g. The installation or repair of water service piping from the utility meter to the building envelope.

(6) Emergency repairs. Where equipment replacements and repairs must be performed in an emergency situation, the permit application shall be submitted within the next working business day to the building official. For the purposes of this section, emergency shall be defined as an unexpected situation requiring prompt action to safeguard life or limb, health, property and public welfare. This section shall not be construed as allowing work to be done without a permit to restore comfort and convenience items, equipment or systems. Emergency work performed shall not be done contrary to the provisions of the residential code.

(7) Repairs. Application or notice to the building official is not required for ordinary repairs to structures, replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles. Such repairs shall not include the cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam or load-bearing support, or the removal or change of any required means of egress, or rearrangement of parts of a structure affecting the egress requirements; nor shall ordinary repairs include addition to, alteration to, alteration of, replacement or relocation of any water supply, sewer, drainage, drain leader, gas, soil, waste, vent or similar piping, electric wiring or mechanical or other work affecting public health or general safety.

(8) Public service agencies. A permit shall not be required for the installation, alteration or repair of generation, transmission, distribution, metering or other related equipment that is under the ownership and control of public service agencies by established right.

(Code 1992, § 5-212; Ord. No. 2006-16, § 4, 12-14-2006; Ord. No. 2007-04, § 2, 3-22-2007; Ord. No. 2007-08, § I, 11-7-2007; Ord. No. 2019-08, §§ 12—15, 11-14-2019)

Sec. 102-488. Application for permit.

(a) Required. To obtain a permit, the applicant shall file an application therefor in writing on a form furnished by the department of building safety for that purpose.

Such application shall:

(1) Identify and describe the work to be covered by the permit for which the application is made.

(2) Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work.

(3) Indicate the use and occupancy for which the proposed work is intended.

(4) Be accompanied by construction documents and other information as required in section 102-514.

(5) State the valuation of the proposed work.

(6) Be signed by the applicant or the applicant's authorized agent.

(7) Give such other data and information as required by the building official.

(b) Action on application. The building official shall examine or cause to be examined applications for permits and amendments thereto within a reasonable time after filing. If the application or the construction documents do not conform to the requirements of pertinent laws, the building official shall reject such application in writing, stating the reasons therefor. If the building official is satisfied that the proposed work conforms to the requirements of the residential code and laws and ordinances applicable thereto, the building official shall issue a permit therefor as soon as practicable. Determination of substantially improved or substantially damaged existing buildings in flood hazard areas. For applications for reconstruc-tion, rehabilitation, addition or other improvement of existing buildings or structures located in an area prone to flooding as established by the residential code, the building official shall examine or cause to be examined the construction documents and shall prepare a finding with regard to the value of the proposed work. For buildings that have sustained damage of any origin, the value of the proposed work shall include the cost to repair the building or structure to its predamage condition.

If the building official finds that the value of the proposed work equals or exceeds 50 percent of the market value of the building or structure before the damage has occurred or the improvement is started, the finding shall be provided to the board for a determination of substantial improvement or substantial damage. Applications determined by the board to constitute substantial improvement or substantial damage shall meet the requirements of the residential code.

(c) Time limitation of application. An application for a permit for any proposed work shall be deemed to have been abandoned 180 days after the date of filing unless such application has been pursued in good faith or a permit has been issued;

except that the building official is authorized to grant one extension of time for an additional period not exceeding 180 days. No application shall be extended more than once. The extension shall be requested in writing and justifiable cause demonstrated. A request for an extension must be received by the building official prior to the expiration of the application. The building official is not required to notify the applicant prior to the applications expiration or that the application has expired.

(Code 1992, § 5-213; Ord. No. 2006-16, § 4, 12-14-2006; Ord. No. 2019-08, § 16, 11-14-2019; Ord. No. 2019-08, § 16, 11-14-2019)

Sec. 102-489. Validity of permit.

The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the residential code or of any other ordinance of the jurisdiction. Permits presuming to give authority to violate or cancel the provisions of the residential code or other ordinances of the jurisdiction shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring the correction of errors in the construction documents and other data. The building official is also authorized to prevent occupancy or use of a structure where in violation of the residential code or of any other ordinances of this jurisdiction.

(Code 1992, § 5-214; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-490. Expiration.

Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. A minimum of one inspection approval must be obtained as evidence that work was commenced or that work has continued. The determination as to whether work was suspended shall be based on the most recent inspection approval date. The building official is authorized to grant, in writing, one extension of time for an additional period of not more than 180 days provided no changes have been made or will be made in the original construction documents for such work. No permit shall be extended more than once. The extension shall be requested in writing and justifiable cause demonstrated. Requests for extensions must be received by the building official prior to the expiration of the permit. The building official is not required to notify the permittee prior to the permits expiration or that the permit has expired. The fee for an extension shall be one-half the amount required for a new permit for such work.

(Code 1992, § 5-215; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-491. Suspension or revocation.

The building official is authorized to suspend or revoke a permit issued under the provisions of the residential code wherever the permit is issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any ordinance or regulation or any of the provisions of the residential code.

(Code 1992, § 5-216; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-492. Placement of permit.

Work for which a permit is required shall not be commenced until the building permit or copy thereof is posted on the site of the work until the completion of the project. The posted permit shall be visible from the street and maintained in such location by the permittee until final approval has been granted by the building official.

(Code 1992, § 5-217; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-493. Responsibility.

It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which the residential code is applicable, to comply with the residential code.

(Code 1992, § 5-218; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-494. Approved construction documents.

Work for which a permit is required shall not be commenced until the permittee has made available approved construction documents on the premises and in such a position to allow the building official convenient access and use. These items shall be protected from the elements and maintained in such location by the permittee until final approval has been granted by the building official.

(Code 1992, § 5-219; Ord. No. 2006-16, § 4, 12-14-2006; Ord. No. 2019-08, § 17, 11-14-2019)

Sec. 102-495. Work without a permit; investigation required.

Whenever any work for which a permit is required has been commenced without first obtaining said permit, a stop work order shall be issued pursuant to division 9 of this article and a special investigation shall be made before a permit may be issued for such work.

(Code 1992, § 5-220; Ord. No. 2006-16, § 4, 12-14-2006; Ord. No. 2019-08, § 18, 11-14-2019)

Secs. 102-496—102-513. Reserved.

DIVISION 3. CONSTRUCTION DOCUMENTS

Sec. 102-514. Submittal documents.

(a) Special conditions. Construction documents, special inspection and structural observation programs and other data shall be submitted in one or more sets with each application for a permit. The construction documents shall be prepared by a registered design professional where required by the statutes of the jurisdiction in which the project is to be constructed. Where special conditions exist, the building official is authorized to require additional construction documents to be prepared by a registered design professional. Exception: The building official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for is such that the reviewing of construction documents is not necessary to obtain compliance with the residential code.

(b) Information on construction documents. Construction documents shall be drawn to scale upon suitable material. Electronic media documents are permitted to be submitted when approved by the building official. Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of the residential code and relevant laws, ordinances, rules and regulations, as determined by the building official. Sketches and pencil or other erasable media used to prepare construction documents shall not be accepted by the building official.

(c) Policies and procedures. The building official shall establish policies and procedures for the minimum standards of acceptance for construction documents.

(d) Manufacturer's installation instructions. Manufacturer's installation instructions, as required by the residential code, shall be available on the job site at the time of inspection.

(e) Information for construction in flood hazard areas. For buildings and structures located in whole or in part in flood hazard areas as established by the residential code, construction documents shall include:

(1) Delineation of flood hazard areas, floodway boundaries and flood zones and the design flood elevation, as appropriate;

(2) The elevation of the proposed lowest floor, including basement; in areas of shallow flooding (AO zones), the height of the proposed lowest floor, including basement, above the highest adjacent grade;

(3) The elevation of the bottom of the lowest horizontal structural member in coastal high hazard areas (V zone); and

(4) If design flood elevations are not included on the community's flood insurance rate map (FIRM), the building official and the applicant shall obtain and reasonably utilize any design flood elevation and floodway data available from other sources.

(Code 1992, § 5-231; Ord. No. 2006-16, § 4, 12-14-2006; Ord. No. 2019-08, § 19, 11-14-2019)

Sec. 102-515. Site plan.

The construction documents submitted with the application for permit shall be accompanied by a site plan showing the size and location of new construction and existing structures on the site and distances from lot lines. In the case of demolition, the site plan shall show construction to be demolished and the location and size of existing structures and construction that are to remain on the site or plot.

(Code 1992, § 5-232; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-516. Examination of documents.

The building official shall examine or cause to be examined construction documents for residential code compliance.

(1) Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by a stamp which states REVIEWED FOR CODE COMPLIANCE. One set of

construction documents so reviewed shall be retained by the building official.

The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or his authorized representative.

(2) Previous approvals. The residential code shall not require changes in the construction documents, construction or designated occupancy of a structure for which a lawful permit has been heretofore issued or otherwise lawfully authorized, and the construction of which has been pursued in good faith within 180 days after the effective date of the residential code and has not been abandoned.

(3) Phased approval. The building official is authorized to issue a permit for the construction of foundations or any other part of a building or structure before the construction documents for the whole building or structure have been submitted, provided that adequate information and detailed statements have been filed complying with pertinent requirements of the residential code.

The holder of such permit for the foundation or other parts of a building or structure shall proceed at the holder's own risk with the building operation and without assurance that a permit for the entire structure will be granted.

(Code 1992, § 5-233; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-517. Amended construction documents.

Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents. Willful and prejudicial departure from or disregard of construction documents in any material respect without the approval of the building official is unlawful.

(Code 1992, § 5-234; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-518. Retention of construction documents.

One set of approved construction documents shall be retained by the building official for a period of not less than 180 days from date of completion of the permitted work, or as required by state or local laws.

(Code 1992, § 5-235; Ord. No. 2006-16, § 4, 12-14-2006) Secs. 102-519—102-544. Reserved.

DIVISION 4. FEES

Sec. 102-545. Payment of fees.

A permit shall not be valid until the fees prescribed by law have been paid. Nor shall an amendment to a permit be released until the additional fee, if any, has been paid.

(Code 1992, § 5-241; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-546. Schedule of permit and other fees.

(a) Schedule. On buildings, structures, electrical, gas, mechanical and plumbing systems or alterations requiring a permit, a fee for each permit or other designated activity shall be paid as required, in accordance with the schedule as established by the board of commissioners of the county.

(b) Investigation fees: work without a permit. Where work, for which a permit is required, has been commenced prior to obtaining a permit, an investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by the residential code. The minimum investigation fee shall be the same as the minimum permit fee set forth in accordance with the schedule as established by the board of commissioners of the county. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of the residential code nor from any penalty prescribed by law.

(Code 1992, § 5-242; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-547. Building permit valuations.

Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment and other permanent systems, including materials and labor. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official.

(Code 1992, § 5-243; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-548. Other fees.

The payment of the fee for the construction, alteration, removal or demolition for work done in connection with or concurrently with the work authorized by a building permit shall not relieve the applicant or holder of the permit from the payment of other fees that are prescribed by law.

(Code 1992, § 5-244; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-549. Refunds.

(a) The building official is authorized to establish a refund policy.

(b) Refunds shall not be given:

(1) For an application or permit that has expired.

(2) If more than 180 days has elapsed from the application submittal date.

(3) If more than 180 days has elapsed from the permit issuance date.

(4) For that component of the permit fee which is representative of the development impact fee.

(5) For plan reviews already performed.

(6) If an inspection has been performed.

(Code 1992, § 5-245; Ord. No. 2006-16, § 4, 12-14-2006; Ord. No. 2019-08, § 20, 11-14-2019)

Secs. 102-550—102-576. Reserved.

DIVISION 5. INSPECTIONS

Sec. 102-577. Generally.

Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the residential code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the residential code or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection.

(Code 1992, § 5-251; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-578. Preliminary inspection.

Before issuing a permit, the building official is authorized to examine, or cause to be examined, buildings, structures and sites for which an application has been filed.

(Code 1992, § 5-252; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-579. Types of inspections.

(a) On-site construction. For onsite construction, from time to time the building official, upon notification from the permit holder or his agent, shall make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shall notify the permit holder or his agent wherein the same fails to comply with the residential code.

(b) Foundation inspection. Inspection of the foundation shall be made after poles or piers are set or trenches or basement areas are excavated and any required forms erected and any required reinforcing steel is in place and supported prior to the placing of concrete. The foundation inspection shall include excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for wood foundations.

(c) Plumbing, mechanical, gas and electrical systems inspection. Rough inspection of plumbing, mechanical, gas and electrical systems shall be made prior to covering or concealment, before fixtures or appliances are set or installed, and prior to framing inspection. Exception: Backfilling of ground-source heat pump loop systems tested in accordance with section M2105.1 of the masonry code prior to inspection shall be permitted.

(d) Floodplain inspections. For construction in areas prone to flooding as established by table R301.2(1) of the residential code, upon placement of the lowest floor, including basement, and prior to further vertical construction, the building official shall require submission of documentation, prepared and sealed by a registered design professional, of the elevation of the lowest floor, including basement, required in the residential code.

(e) Frame and masonry inspection. Inspection of framing and masonry construction shall be made after the roof, masonry, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved.

(f) Other inspections. In addition to the called inspections above, the building official may make or require any other inspections to ascertain compliance with the residential code and other laws enforced by the building official.

(1) Fire-resistance-rated construction inspection. Where fire-resistance-rated construction is required between dwelling units or due to location on property, the building official shall require an inspection of such construction after all lathing and/or wallboard is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished.

(2) Lot and foundation survey. A survey of the lot and foundation shall be required by the building official to verify that the building or structure is located within the designated setbacks and in accordance with the approved plans for the following:

a. For all newly constructed single-family dwellings.

b. For residential accessory structures, pools and additions located within two feet of the setback, floodplain and/or watershed protection areas.

The foundation survey shall occur after concrete is placed and shall be submitted to and approved by the county planning and zoning department and engineering department prior to the commencement of any framing operations or work. It shall be unlawful to commence any framing operations or work until the foundation survey is approved by the county planning and zoning department and engineering department. Exception: For pools, the survey shall be submitted to and approved by the county planning and zoning department and engineering department after excavation and the placement of forms and reinforcing steel, but prior to the placement of any concrete, shotcrete or gunite. For pre-manufactured pools, the survey shall be submitted to and approved by the county planning and zoning department and engineering department after excavation, but prior to the placement of the pool shell.

(g) Final inspection. Final inspection shall be made after the permitted work is complete and prior to occupancy.

(Code 1992, § 5-253; Ord. No. 2006-16, § 4, 12-14-2006; Ord. No. 2019-08, § 21, 11-14-2019)

Sec. 102-580. Inspection agencies.

The building official is authorized to accept reports of approved agencies, provided such agencies satisfy the requirements as to qualifications and reliability.

(Code 1992, § 5-254; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-581. Inspection requests.

It shall be the duty of the permit holder or their agent to notify the building official that such work is ready for inspection. It shall be the duty of the person requesting any inspections required by the residential code to provide access to and means for inspection of such work.

(Code 1992, § 5-255; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-582. Approval required.

Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or shall notify the permit holder or an agent of the permit holder wherein the same fails to comply with the residential code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the building official.

(Code 1992, § 5-256; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-583. Work covered without inspection approval: investigation required.

Whenever any work for which a permit is required has been covered without first obtaining the necessary inspection approval, a special investigation shall be made before subsequent inspections are approved. The work shall be uncovered to allow an inspection.

(Code 1992, § 5-257; Ord. No. 2006-16, § 4, 12-14-2006; Ord. No. 2019-08, § 22, 11-14-2019)

Secs. 102-584—102-614. Reserved.

DIVISION 6. CERTIFICATE OF OCCUPANCY

Sec. 102-615. Use and occupancy.

(a) No building or structure shall be used or occupied, and not change in the existing occupancy classification of a building or structure or portion thereof shall be made until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the residential code or of other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of the residential code or other ordinances of the jurisdiction shall not be valid.

(b) Exceptions.

(1) Certificates of occupancy are not required for work exempt from permits.

(Code 1992, § 5-261; Ord. No. 2006-16, § 4, 12-14-2006; Ord. No. 2019-08, § 23, 11-14-2019)

Sec. 102-616. Change in use.

Changes in the character or use of an existing structure shall not be made except as specified in the International Building Code.

(Code 1992, § 5-262; Ord. No. 2006-16, § 4, 12-14-2006; Ord. No. 2019-08, § 24, 11-14-2019)

Sec. 102-617. Certificate issued.

After the building official inspects the building or structure and finds no violations of the provisions of the residential code or other laws that are enforced by the department of building safety, the building official shall issue a certificate of occupancy which shall contain the following:

(1) The building permit number.

(2) The address of the structure.

(3) The name and address of the owner.

(4) A description of that portion of the structure for which the certificate is issued.

(5) A statement that the described portion of the structure has been inspected for compliance with the requirements of the residential code.

(6) The name of the building official.

(7) The edition of the residential code under which the permit was issued.

(8) If an automatic sprinkler system is provided and whether the sprinkler system is required.

(9) Any special stipulations and conditions of the building permit.

(Code 1992, § 5-263; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-618. Revocation.

The building official shall, in writing, suspend or revoke a certificate of occupancy issued under the provisions of the residential code wherever the certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure or portion thereof is in violation of any ordinance or regulation or any of the provisions of the residential code.

(Code 1992, § 5-264; Ord. No. 2006-16, § 4, 12-14-2006) Secs. 102-619—102-639. Reserved.

DIVISION 7. SERVICE UTILITIES

Sec. 102-640. Connection of service utilities.

No person shall make connections from a utility, source of energy, fuel or power to ay building or system that is regulated by the residential code for which a permit is required, until approved by the building official.

(Code 1992, § 5-271; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-641. Temporary connection.

The building official shall have the authority to authorize and approve the temporary connection of the building or system to the utility, source of energy, fuel or power.

(Code 1992, § 5-272; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-642. Authority to disconnect.

The building official shall have the authority to authorize disconnection of the utility service to the building, structure or system regulated by the residential code and the referenced codes and standards in case of emergency where necessary to eliminate an immediate hazard to life or property or when such utility connection has been made without the approval required by section 102-640 or 102-641. The building official shall notify the serving utility and whenever possible the owner and occupant of the building, structure or service system of the decision to disconnect prior to taking such action if not notified prior to disconnection. The owner or occupant of the building, structure or service system shall be notified in writing as soon as practical thereafter.

(Code 1992, § 5-273; Ord. No. 2006-16, § 4, 12-14-2006) Secs. 102-643—102-672. Reserved.

DIVISION 8. VIOLATIONS

Sec. 102-673. Unlawful acts.

It shall be unlawful for any person, firm or corporation to erect, construct, alter, extend, repair, move, remove, demolish or occupy any building, structure or equipment regulated by the residential code, or cause same to be done, in conflict with or in violation of any of the provisions of the residential code.

(Code 1992, § 5-281; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-674. Notice.

The building official is authorized to serve a notice of violation or order on the person responsible for the erection, construction, alteration, extension, repair, moving, removal, demolition or occupancy of a building or structure in violation of the provisions of the residential code, or in violation of a detail statement or a plan approved thereunder, or in violation of a permit or certificate issued under the provisions of the residential code. Such order shall direct the discontinuance of the illegal action or condition and the abatement of the violation.

(Code 1992, § 5-282; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-675. Prosecution.

If the notice of violation is not complied with in the time prescribed by such notice, the building official is authorized to request the solicitor general of the county state court to institute the appropriate proceeding at law or in equity to restrain, correct or abate such violation, or to require the removal or termination of the unlawful occupancy of the building or structure in violation of the provisions of the residential code or of the order or direction made pursuant thereto.

(Code 1992, § 5-283; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-676. Penalties.

Any person who violates a provision of the residential code or fails to comply with any of the requirements thereof or who erects, constructs, alters or repairs a building or structure in violation of the approved construction documents or directive of the building official, or of a permit or certificate issued under the provisions of the residential code, shall be subject to penalties as prescribed by law.

Each day that a violation continues after due notice has been served shall be deemed a separate offense.

(Code 1992, § 5-284; Ord. No. 2006-16, § 4, 12-14-2006) Secs. 102-677—102-695. Reserved.

DIVISION 9. STOP WORK ORDER

Sec. 102-696. Notice to owner.

Upon notice from the building official that work on any building or structure is being prosecuted contrary to the provisions of the residential code, other pertinent laws or ordinances implemented through the enforcement of the residential code, or in an unsafe and dangerous manner, such work shall be immediately stopped. The stop work order shall be in writing and shall be given to the owner of the property involved, or to the owner's agent or to the person doing the work and shall state the conditions under which work will be permitted to resume.

(Code 1992, § 5-291; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-697. Unlawful continuance.

Any person who shall continue any work in or about the structure after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to penalties as prescribed by law.

(Code 1992, § 5-292; Ord. No. 2006-16, § 4, 12-14-2006) Secs. 102-698—102-722. Reserved.

DIVISION 10. EMERGENCY MEASURES

Sec. 102-723. Imminent danger.

When, in the opinion of the building official, there is imminent danger of failure or collapse of a building that endangers life, or when any building or part of a building has fallen and life is endangered by the occupation of the building, or when there is actual or potential danger to the building occupants or those in the proximity of any structure because of explosives, explosive fumes or vapors, or the presence of toxic fumes, gases, or materials, or operation of defective or dangerous equipment, the building official is hereby authorized an empowered to order and require the occupants to vacate the premises forthwith. The building official shall cause to be posted at each entrance to such structure a notice reading as follows:

DANGER!—NO ENTRY. It shall be unlawful for any person to enter such structure except for the purpose of securing the structure, making the required repairs, removing the hazardous condition, or of demolishing the same.

(Code 1992, § 5-293; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-724. Temporary safeguards.

Notwithstanding other provisions of the residential code, whenever, in the opinion of the building official, there is imminent danger due to an unsafe condition, the building official shall order the necessary work to be done, including the boarding up of openings, to render such structure temporarily safe whether or not the legal procedure herein described has been instituted; and shall cause such other action to be taken as the building official deems necessary to meet such emergency.

(Code 1992, § 5-294; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-725. Closing streets.

When necessary for public safety, the building official shall temporarily close structures and close, or order the authority having jurisdiction to close, sidewalks, streets, public ways and places adjacent to unsafe structures, and prohibit the same from being utilized.

(Code 1992, § 5-295; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-726. Emergency repairs.

For the purposes of this section, the building official shall employ the necessary labor and materials to perform the required work as expeditiously as possible.

(Code 1992, § 5-296; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-727. Costs of emergency repairs.

Costs incurred in the performance of emergency work shall be paid by the jurisdiction. The legal counsel of the jurisdiction shall institute appropriate action against the owner of the premises where the unsafe structure is or was located for the recovery of such costs.

(Code 1992, § 5-297; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-728. Hearing.

Any person ordered to take emergency measures shall comply with such order forthwith. Any affected person shall thereafter, upon petition directed to the board of commissioners of the county, be afforded a hearing as described in the residential code.

(Code 1992, § 5-298; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-729. Emergency declaration.

In the event of a national, state, or local emergency declaration, the building official may waive or augment the provisions of this chapter as needed during the periods of emergency to protect public safety.

(Code 1992, § 5-299; Ord. No. 2006-16, § 4, 12-14-2006) Sec. 102-730. Disaster assessment.

(a) Notification. Upon notification from emergency first responder personnel, law enforcement personnel or others of a disaster to a building or structure, the building official shall make or cause to be made any necessary visual, nondestructive inspections to determine:

(1) Immediate hazards that jeopardize public safety, health or general welfare;

(2) Extent of damage;

(3) Necessity to evacuate or condemn the building or structure;

(4) Necessity to disconnect or authorize reestablishment of utilities;

(5) What permits will be required; and

(6) Whether plans are necessary.

(b) Posting of placards. Placards shall be clearly posted at each entrance of the building or structure immediately upon completion of a disaster assessment as follows:

(1) Inspected—No Restriction on Lawful Use or Occupancy (Green);

(2) Danger!—Limited Entry (Yellow); or

(3) Danger!—No Entry (Red).

It shall be unlawful to remove placards posted by the building official.

(Code 1992, § 5-300; Ord. No. 2006-16, § 4, 12-14-2006; Ord. No. 2019-08, § 25, 11-14-2019)

Secs. 102-731—102-758. Reserved.

ARTICLE V. PROCEDURES FOR THE ADMINISTRATION OF THE

MECHANICAL CODE

DIVISION 1. GENERALLY

Sec. 102-759. Title.

The provisions of this article apply to the International Mechanical Code, as adopted in section 102-22. In this article the term

mechanical code means the International Mechanical Code as adopted in section 102-22.

(Code 1992, § 5-301; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-760. Scope.

(a) The provisions of the mechanical code shall apply to the design, installation, maintenance, alteration and inspection of mechanical systems that are permanently installed and utilized to provide control of environmental conditions and related processes within buildings. This code shall also regulate those mechanical systems, system components, equipment and appliances specifically addressed herein. The installation of fuel gas distribution piping and equipment, fuel-gas-fired appliances and fuel-gas-fired appliance venting systems shall be regulated by the International Fuel Gas Code. Exception: Detached one- and two-family dwellings and multiple single-family dwellings (townhouses) not more than three stories high with separate means of egress and their accessory structures shall comply with the International Residential Code.

(b) Appendices. Provisions in the appendices shall not apply unless specifically adopted.

(c) Appendix C Design and Installation of Residential Flexible Ductwork Systems— Adopted. Appendix C Design and Installation of Residential Flexible Ductwork Systems of the Georgia State Amendments to the International Mechanical Code (2006 edition), revised January 1, 2007, is hereby adopted.

(Code 1992, § 5-302; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-761. Intent.

(a) Purpose. The purpose of the mechanical code is to establish the minimum requirements to safeguard life or limb, health, property and public welfare by regulating and controlling the design, construction, installation, quality of materials, location, operation and maintenance or use of mechanical systems. The purpose of the mechanical code is not to create or otherwise establish or designate any particular class or group of persons who will or should be especially protected or benefitted by the terms of the mechanical code.

(b) Public duty, warranty and quality control. The permitting, plans examination or inspection conducted with regard to a mechanical system or equipment in accordance with the mechanical code constitutes a public duty and does not warrant or ensure the absence of any hazard, deficiency or other matter. Any duty created by or based on the mechanical code is transferred to the public, and no private cause of action is created by a breach of such duty. The mechanical shall not be construed to relieve from or lessen the responsibility of any person, firm or corporation owning, operating or controlling any mechanical system or equipment for any damages to persons or property caused by defects, nor shall the department of mechanical inspection or the county be held as assuming any such liability by reason of the inspections or plans examinations authorized by the mechanical code or any permits or certificates issued under the mechanical code. The code official checks for substantial compliance with the mechanical code, but reviews and inspections performed by the code official pursuant to this chapter do not create any guarantee or warranty that mechanical systems or equipment have been constructed in accordance with all provisions of the mechanical code. The permitting, plans examination, or inspection of any mechanical system or equipment or construction document shall not be construed as a warranty of the physical condition or adequacy of such mechanical system or equipment or construction document, including without limitation a representation or warranty that a mechanical system or equipment is complete, that it is in compliance with the mechanical code or any other law, that it was inspected, that it is safe or ready for occupancy or that it meets any particular degree of quality or workmanship. Quality control of materials and workmanship is not within the purview of the mechanical code except as it relates to the purposes stated therein. The amount and quality of inspection and other services provided is discretionary with the code official and may vary in response to the amount of staff, work load, training and experience, funding and other pertinent factors affecting whether and how inspection is made or whether any hazard, deficiency or similar matter is observed.

(Code 1992, § 5-303; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-762. Existing installations.

Except as otherwise provided for in this chapter, a provision in the mechanical code shall not require the removal, alteration or abandonment of, nor prevent the continued utilization and maintenance of, a mechanical system lawfully in existence at the time of the adoption of the mechanical code.

(Code 1992, § 5-304; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-763. Maintenance.

Mechanical systems, both existing and new, and all parts thereof, shall be maintained in proper operating condition in accordance with the original design in a safe and sanitary condition. All device or safeguards required by the mechanical code shall be maintained in compliance with the mechanical code edition under which they were installed. The owner or the owner's designated agent shall be responsible for maintenance of mechanical systems. To determine compliance with this provision, the code official shall have the authority to require a mechanical system to be reinspected.

(Code 1992, § 5-305; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-764. Additions, alterations or repairs.

Additions, alterations, renovations or repairs to a mechanical system shall conform to that required for a new mechanical system without requiring the existing mechanical system to comply with all the requirements of the mechanical code.

Additions, alterations or repairs shall not cause an existing mechanical system to become unsafe, unsanitary or overloaded. Minor additions, alterations, renovations and repairs to existing mechanical systems shall be permitted in the same manner and arrangement as in the existing system, provided that such repairs or replacements are not hazardous and are approved.

(Code 1992, § 5-306; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-765. Change in occupancy.

It shall be unlawful to make any change in the occupancy of any structure that will subject the structure to any special provision of the mechanical code without approval of the code official. The code official shall certify that such structure meets the intent of the provisions of law governing building construction for the proposed new occupancy and that such change of occupancy does not result in any hazard to the public health, safety or welfare.

(Code 1992, § 5-307; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-766. Historic buildings.

The provisions of the mechanical code relating to the construction, alteration, repair, enlargement, restoration, relocation or moving of buildings or structures shall not be mandatory for existing buildings or structures identified and classified by the state or local jurisdiction as historic buildings when such buildings or structures are judged by the code official to be safe and in the public interest of health, safety and welfare regarding any proposed construction, alteration, repair, enlargement, restoration, relocation or moving of buildings.

(Code 1992, § 5-308; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-767. Moved buildings.

Except as determined by section 102-762, mechanical systems that are a part of buildings or structures moved into or within the jurisdiction shall comply with the provisions of the mechanical code for new installations.

(Code 1992, § 5-309; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-768. Requirements not covered by mechanical code.

Any requirements necessary for the strength, stability or proper operation of an existing or proposed mechanical system, or for the public safety, health and general welfare, not specifically covered by the mechanical code shall be determined by the code official.

(Code 1992, § 5-310; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-769. Severability.

If any action, subsection, sentence, clause or phrase of the mechanical code is for any reason held to be unconstitutional, such decision shall not affect the validity of the remaining portions of the mechanical code.

(Code 1992, § 5-311; Ord. No. 2006-16, § 5, 12-14-2006) Secs. 102-770—102-791. Reserved.

DIVISION 2. PERMITS

Sec. 102-792. When required.

Any owner, authorized agent or contractor who intends to erect, install, enlarge, alter, repair, remove, convert or replace a mechanical system, the installation of which is regulated by the mechanical code, or to cause any such work to be done, shall first make application to the code official and obtain the required permit.

Exception: Where equipment and appliance replacements or repairs must be performed in an emergency situation, the permit application shall be submitted within the next business day of the department of mechanical inspection. For the purposes of this section, emergency shall be defined as an unexpected situation requiring prompt action to safeguard life or limb, health, property and public welfare. This section shall not be construed as allowing work to be done without a permit to restore comfort and convenience items, equipment or systems. Emergency work performed shall not be done contrary to the provisions of the mechanical code.

If a licensed contractor performs work without obtaining any necessary permit, there is a rebuttable presumption that the contractor willfully and deliberately violated the building laws of this jurisdiction.

(Code 1992, § 5-321; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-793. Permits not required.

Permits shall not be required for the following:

(1) Portable heating appliances;

(2) Portable ventilation appliances and equipment;

(3) Portable cooling units;

(4) Steam, hot water or chilled water piping within any heating or cooling equipment or appliances regulated by the mechanical code;

(5) The replacement of any minor part that does not alter the approval of equipment or an appliance or make such equipment or appliance unsafe;

(6) Portable evaporative coolers;

(7) Self-contained refrigeration systems that contain ten pounds (4.5 kg) or less of refrigerant, or that are actuated by motors of one horsepower (0.75 kW) or less; and

(8) Portable fuel cell appliances that are not connected to a fixed piping system and are not interconnected to a power grid.

Exemption from the permit requirements of the mechanical code shall not be deemed to grant authorization for any work to be done in violation of the provisions the mechanical code or any other laws or ordinances of this jurisdiction.

(Code 1992, § 5-322; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-794. Application for permit.

(a) Required. Each application for a permit, with the required fee, shall be file with the code official on a form furnished for that purpose and shall contain a general description of the proposed work and its location. The application shall be signed by the owner or an authorized agent. The permit application shall indicate the proposed occupancy of all parts of the building and of that portion of the site or lot, if any, not covered by the building or structure and shall contain such other information required by the code official.

(b) Construction documents. The code official shall examine or cause to be examined the accompanying construction documents and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of the mechanical code and other pertinent laws or ordinances. Construction documents, engineering calculations, diagrams and other such data shall be submitted in two or more sets with each application for a permit.

The code official shall require construction documents, computations and specifications to be prepared and designed by a registered design professional where required by state law. Where special conditions exist, the code official is authorized to require additional construction documents to be prepared by a registered design professional. Construction documents shall be drawn to scale and shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that the work conforms to the provisions of the mechanical code.

Construction documents for buildings more than two stories in height shall indicate where penetrations will be made for mechanical systems and the materials and methods for maintaining required structural safety, fire-resistance rating and fireblocking. Sketches and pencil or other erasable media used to prepare construction documents shall not be accepted by the code official. Exception: The code official is authorized to waive the submission of construction documents, calculations or other data if the nature of the work applied for is such that review of construction documents is not necessary to determine compliance with the mechanical code. The code official shall establish policies and procedures for the minimum standards of acceptance for construction documents.

(c) Action on application. The code official shall examine or cause to be examined applications for permits and amendments thereto within a reasonable time after filing. If the application or the construction documents do not conform to the requirements of pertinent laws, the code official shall reject such application in writing, stating the reasons therefor. If the code official is satisfied that the proposed work conforms to the requirements of the mechanical code and laws and ordinances applicable thereto, the code official shall issue a permit therefor as soon as practicable.

(d) Time limitation of application. An application for a permit for any proposed work or operation shall be deemed to have been abandoned 180 days after the date of filing, unless such application has been pursued in good faith or a permit has been issued; except that the code official is authorized to grant one extension of time for an additional period not exceeding 180 days. No application shall be extended more than once. The extension shall be requested in writing and justifiable cause demonstrated. A request for an extension must be received by the code official prior to the expiration of the application. The code official is not required to notify the applicant prior to the application(s expiration or that the application has expired.

(Code 1992, § 5-323; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-795. Permit issuance.

(a) Review by code official. The application, construction documents and other data filed by an applicant for permit shall be reviewed by the code official. If the code official finds that the proposed work conforms to the requirements of the mechanical code and all laws and ordinances applicable thereto, and that the fees specified in section 102-796 have been paid, a permit shall be issued to the applicant.

(b) Approved construction documents. When the code official issues a permit where construction documents are required, the construction documents shall be approved, in writing and stamped Reviewed For Code Compliance. Such approved construction documents shall not be changed, modified or altered without authorization form the code official. All work shall be done in accordance with the approved construction documents. The code official is authorized to issue a permit for the construction of a part of a mechanical system before the construction documents for the whole system have been submitted or approved, provided that adequate information and detailed statements have been filed complying with pertinent requirements of the mechanical code. The holder of such permit for the foundation or other parts of a building or structure shall proceed at the holder's own risk without assurance that the permit for the entire mechanical system will be granted.

(c) Amended construction documents. Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents. Willful and prejudicial departure from or disregard of construction documents in any material respect without the approval of the code official is unlawful.

(d) Validity. The issuance of a permit or approval of construction documents shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the mechanical code or of any other ordinance of the jurisdiction.

Permits presuming to give authority to violate or cancel the provisions of the mechanical code or other ordinances of the jurisdiction shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the code official from requiring the correction of errors in the construction documents and other data or from preventing building operations being carried on thereunder when in violation of the mechanical code or of other ordinances of this jurisdiction. The code official is also authorized to prevent occupancy or use of a structure where in violation of the mechanical code or of any other ordinances of this jurisdiction.

(e) Expiration. Every permit issued shall expire by limitation and become null and void if the work authorized by such permit is not commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. A minimum of one inspection approval must be obtained as evidence that work was commenced or that work has continued. The determination as to whether work was suspended shall be based on the most recent inspection approval date.

(f) Extensions. The code official is authorized to grant, in writing, one extension of time for an additional period of not more than 180 days provided no changes have been made or will be made in the original construction documents for such work. No permit shall be extended more than once. The extension shall be requested in writing and justifiable cause demonstrated. Requests for extensions must be received by the code official prior to the expiration of the permit. The code official is not required to notify the permittee prior to the permit's expiration or that the permit has expired. The fee for an extension shall be one-half the amount required for a new permit for such work.

(g) Suspension or revocation of permit. The code official shall revoke a permit or approval issued under the provisions of the mechanical code in case of any false statement or misrepresentation of fact in the application or on the construction documents upon which the permit or approval was based.

(h) Retention of construction documents. One set of construction documents shall be retained by the code official until final approval of the work covered therein. One set of approved construction documents shall be returned to the applicant, and said set shall be kept on the site of the building or work at all times during which the work authorized thereby is in progress.

(i) Placement of permit. Work for which a permit is required shall not be commenced until the building permit or copy thereof is posted on the site of the work until the completion of the project. The posted permit shall be visible from the street and maintained in such location by the permittee until final approval has been granted by the code official.

(j) Responsibility. It shall be the duty of every person who performs work for which the mechanical code is applicable, to comply with the mechanical code.

(k) Inspection record card and approved construction documents. Work for which a permit is required shall not be commenced until the permittee has made available approved construction documents on the premises and in such a position to allow the code official convenient access and use. These items shall be protected from the elements and maintained in such location by the permittee until final approval has been granted by the code official.

(l) Work without a permit; investigation required. Whenever any work for which a permit is required has been commenced without first obtaining said permit, a stop work order shall be issued pursuant to division 4 of this article and a special investigation shall be made before a permit may be issued for such work.

(Code 1992, § 5-324; Ord. No. 2006-16, § 5, 12-14-2006; Ord. No. 2019-08, § 26, 11-14-2019)

Sec. 102-796. Fees.

(a) Payment of fees. A permit shall not be issued until the fees prescribed in subsection (c) of this section have been paid, and an amendment to a permit shall not be released until the additional fee, if any, due to an increase of the mechanical system, has been paid.

(b) Investigation fees; work without a permit. Where work, for which a permit is required, has been commenced prior to obtaining a permit, an investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by the mechanical code. The minimum investigation fee shall be the same as the minimum permit fee set forth in accordance with the schedule as established by the board of commissioners of the county. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of the mechanical code nor from any penalty prescribed by law.

(c) Fee schedule. For mechanical work requiring a permit or other designated activity, a fee for each permit shall be paid as required, in accordance with the schedule as established by the board of commissioners of the county.

(d) Fee refunds.

(1) The code official is authorized to establish a refund policy.

(2) Refunds shall not be given:

a. For an application or permit that has expired.

b. If more than 180 days has elapsed from the application submittal date.

c. If more than 180 days has elapsed from the permit issuance date.

d. For that component of the permit fee which is representative of the development impact fee.

e. For plan reviews already performed.

f. If an inspection has been performed.

(Code 1992, § 5-325; Ord. No. 2006-16, § 5, 12-14-2006; Ord. No. 2019-08, § 27, 11-14-2019)

Secs. 102-797—102-815. Reserved.

DIVISION 3. INSPECTIONS AND TESTING

Sec. 102-816. Generally.

Work for which a permit is required shall be subject to inspection by the code official and such work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the mechanical code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the mechanical code or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the code official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection.

(Code 1992, § 5-331; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-817. Preliminary inspection.

(a) Review by code official. Before issuing a permit, the code official is authorized to examine, or cause to be examined, mechanical systems for which an application has been filed.

(b) Required inspections and testing. The code official, upon notification from the permit holder or the permit holder's agent, shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or an agent of any violations that must be corrected. The holder of the permit shall be responsible for the scheduling of such inspections.

(1) Underground inspection shall be made after trenches or ditches are excavated and bedded, piping installed, and before any backfill is put in place. When excavated soil contains rocks, broken concrete, frozen chunks and other rubble that would damage or break the piping or cause corrosive action, clean backfill shall be on the job site.

(2) Rough-in inspection shall be made after the roof, framing, fireblocking and bracing are in place and all ducting and other components to be concealed are complete, and prior to the installation of wall or ceiling membranes.

(3) Final inspection shall be made upon completion of the mechanical system.

(4) Other inspections. In addition to the inspections specified above, the code official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of the mechanical code and other laws that are enforced by the department of mechanical inspection.

Exception: Ground-source heat pump loop systems tested in accordance with the mechanical code shall be permitted to be backfilled prior to inspection.

The requirements of this section shall not be considered to prohibit the operation of any heating equipment or appliances installed to replace existing heating equipment or appliances serving an occupied portion of a structure in the event a request for inspection of such heating equipment or appliances has been filed with the department not more than 48 hours after replacement work is completed, and before any portion of such equipment appliances is concealed by any permanent portion of the structure.

(c) Approved inspection agencies. Test reports submitted to the code official for consideration shall be developed by approved agencies that have satisfied the requirements as to qualifications and reliability.

(d) Evaluation and followup inspection services. Prior to the approval of a closed, prefabricated construction assembly having concealed mechanical work and the issuance of a mechanical permit, the code official shall require the submittal of an evaluation report on each prefabricated construction assembly indicating the complete details of the mechanical system, including a description of the system and its components, the basis upon which the system is being evaluated, test results and similar information, and other data as necessary for the code official to determine conformance to the mechanical code.

(1) Evaluation service. The code official shall designate the evaluation service of an approved agency as the evaluation agency, and review such agency(s evaluation report for adequacy and conformance to the mechanical code.

(2) Followup inspection. Except where ready access is provided to mechanical systems, service equipment and accessories for complete inspection at the site without disassembly or dismantling, the code official shall conduct the frequency of in-plant inspections necessary to ensure conformance to the approved evaluation report or shall designate an independent, approved inspection agency to conduct such inspections. The inspection agency shall furnish the code official with the followup inspection manual and a report of inspections upon request, and the mechanical system shall have an identifying label permanently affixed to the system indicating that factory inspections have been performed.

(3) Test and inspection records. All required test and inspection records shall be available to the code official at all times during the fabrication of the mechanical system and the erection of the building, or such records as the code official designates shall be filed.

(Code 1992, § 5-332; Ord. No. 2006-16, § 5, 12-14-2006; Ord. No. 2019-08, § 28, 11-14-2019)

Sec. 102-818. Testing.

(a) Required. Mechanical systems shall be tested as required in the mechanical code and in accordance with subsections (b) through (d) of this section. Tests shall be made by the permit holder and observed by the code official.

(b) New, altered, extended or repaired systems. New mechanical systems and parts of existing systems that have been altered, extended, renovated or repaired shall be tested as prescribed herein to disclose leaks and defects.

(c) Apparatus, material and labor for tests. Apparatus, material and labor required for testing a mechanical system or part thereof shall be furnished by the permit holder.

(d) Reinspection and testing. Where any work or installation does not pass any initial test or inspection, the necessary corrections shall be made to comply with the mechanical code. The work or installation shall then be resubmitted to the code official for inspection and testing.

(Code 1992, § 5-333; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-819. Approval.

After the prescribed tests and inspections indicate that the work complies in all respects with the mechanical code, a notice of approval shall be issued by the code official. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the code official. The code official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or shall notify the permit holder or his agent wherein the same fails to comply with the mechanical code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the code official.

(Code 1992, § 5-334; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-820. Temporary connection.

The code official shall have the authority to authorize the temporary connection of a mechanical system to the sources of energy for the purpose of testing mechanical systems or for use under a temporary certificate of occupancy.

(Code 1992, § 5-335; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-821. Work covered without inspection approval; investigation required.

Whenever any work for which a permit is required has been covered without first obtaining the necessary inspection approval, a special investigation shall be made before subsequent inspections are approved. The work shall be uncovered to allow an inspection.

(Code 1992, § 5-336; Ord. No. 2006-16, § 5, 12-14-2006; Ord. No. 2019-08, § 29, 11-14-2019)

Sec. 102-822. Inspection requests.

It shall be the duty of the permit holder of the building permit or their duly authorized agent to notify the code official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work that are required by the mechanical code.

(Code 1992, § 5-337; Ord. No. 2006-16, § 5, 12-14-2006) Secs. 102-823—102-852. Reserved.

DIVISION 4. VIOLATIONS

Sec. 102-853. Unlawful acts.

It shall be unlawful for any person, firm or corporation to erect, construct, alter, repair, remove, demolish or utilize a mechanical system, or cause same to be done, in conflict with or in violation of any of the provisions of the mechanical code.

(Code 1992, § 5-341; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-854. Notice.

The code official shall serve a notice of violation or order on the person responsible for the erection, installation, alteration, extension, repair, removal or demolition of mechanical work in violation of the provisions of the mechanical code, or in violation of a detail statement or the approved construction documents thereunder, or in violation of a permit or certificate issued under the provisions of the mechanical code. Such order shall direct the discontinuance of the illegal action or condition and the abatement of the violation.

(Code 1992, § 5-342; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-855. Prosecution.

If the notice of violation is not complied with in the time prescribed by such notice, the code official shall request the solicitor general of the county state court to institute the appropriate proceeding at law or in equity to restrain, correct or abate such violation, or to require the removal or termination of the unlawful occupancy of the building or structure in violation of the provisions of the mechanical code or of the order or direction made pursuant thereto.

(Code 1992, § 5-343; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-856. Penalties.

Any person who violates a provision of the mechanical code or fails to comply with any of the requirements thereof or who erects, installs, alters or repairs mechanical work in violation of the approved construction documents or directive of the code official, or of a permit or certificate issued under the provisions of the mechanical code, shall be subject to penalties as prescribed by law. Each day that a violation continues after due notice has been served shall be deemed a separate offense.

(Code 1992, § 5-344; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-857. Stop work orders.

Upon notice from the code official, work on any mechanical system that is being done contrary to the provisions of the mechanical code, other pertinent laws or ordinances implemented through the enforcement of the mechanical code, or in a dangerous or unsafe manner shall immediately cease. Such notice shall be in writing and shall be given to the owner of the property, or to the owner's agent or to the person doing the work. The notice shall state the conditions under which work is authorized to resume. When an emergency exists, the code official shall not be required to give a written notice prior to stopping the work. Any person who shall continue any work on the system after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to penalties as prescribed by law.

(Code 1992, § 5-345; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-858. Abatement.

The imposition of the penalties herein prescribed shall not preclude the legal officer of the jurisdiction from instituting appropriate action to prevent unlawful construction or to restrain, correct or abate a violation, or to prevent illegal occupancy of a building, structure or premises, or to stop an illegal act, conduct, business or utilization of the plumbing on or about any premises.

(Code 1992, § 5-346; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-859. Unsafe mechanical systems.

(a) Declaration of public nuisance. A mechanical system that is unsafe or that constitutes a fire or health hazard, or is otherwise dangerous to human life is hereby declared unsafe. Use of a mechanical system regulated by the mechanical code constituting a hazard to safety, health or public welfare by reason of inadequate maintenance, dilapidation, obsolescence, fire hazard, disaster, damage or abandonment is hereby declared an unsafe use. Any such unsafe equipment is hereby declared to be a public nuisance and shall be abated by repair, rehabilitation, demolition or removal.

(b) Authority to condemn mechanical systems. Whenever the code official determines that any mechanical system, or portion thereof, regulated by the mechanical code has become hazardous to life, health or property or has become unsanitary, the code official shall order in writing that such plumbing either be removed or restored to a safe or sanitary condition. A time limit for compliance with such order shall be specified in the written notice. No person shall use or maintain a defective mechanical system after receiving such notice. When such mechanical system is to be disconnected, written notice as prescribed in section 102-854 shall be given. In cases of immediate danger to life or property, such disconnection shall be made immediately without such notice.

(c) Authority to order disconnection of energy sources. The code official shall have the authority to authorize disconnection of energy sources supplied to a building, structure or mechanical system regulated by the technical codes in case of an emergency, where necessary, to eliminate an immediate danger to life or property.

Where possible, the owner and occupant of the building, structure or service system shall be notified of the decision to disconnect utility service prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or service systems shall be notified in writing, as soon as practical thereafter. Where energy sources are provided by a public utility, the code official shall immediately notify the serving utility of the issuance of such order to disconnect.

(d) Connection after order to disconnect. No person shall make connection from any energy source to mechanical systems regulated by the mechanical code that have been disconnected or ordered to be disconnected by the code official or the use of which has been ordered to be disconnected by the code official until the code official authorizes the reconnection and use of such mechanical systems. When a mechanical system is maintained in violation of the mechanical code, and in violation of any notice issued pursuant to the provisions of this section, the code official shall institute any appropriate action to prevent, restrain, correct or abate the violation.

(Code 1992, § 5-347; Ord. No. 2006-16, § 5, 12-14-2006) Secs. 102-860—102-881. Reserved.

DIVISION 5. EMERGENCY MEASURES

Sec. 102-882. Imminent danger.

When, in the opinion of the code official, there is imminent danger of failure or collapse of a building that endangers life, or when any building or part of a building has fallen and life is endangered by the occupation of the building, or when there is actual or potential danger to the building occupants or those in the proximity of any structure because of explosives, explosive fumes or vapors, or the presence of toxic fumes, gases, or materials, or operation of defective or dangerous equipment, the code official is hereby authorized an empowered to order and require the occupants to vacate the premises forthwith. The code official shall cause to be posted at each entrance to such structure a notice reading as follows: DANGER!—NO ENTRY. It shall be unlawful for any person to enter such structure except for the purpose of securing the structure, making the required repairs, removing the hazardous condition, or of demolishing the same.

(Code 1992, § 5-351; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-883. Temporary safeguards.

Notwithstanding other provisions of the mechanical code, whenever, in the opinion of the code official, there is imminent danger due to an unsafe condition, the code official shall order the necessary work to be done, including the boarding up of openings, to render such structure temporarily safe whether or not the legal procedure herein described has been instituted; and shall cause such other action to be taken as the code official deems necessary to meet such emergency.

(Code 1992, § 5-352; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-884. Closing streets.

When necessary for public safety, the code official shall temporarily close structures and close, or order the authority having jurisdiction to close, sidewalks, streets, public ways and places adjacent to unsafe structures, and prohibit the same from being utilized.

(Code 1992, § 5-353; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-885. Emergency repairs.

For the purposes of this section, the code official shall employ the necessary labor and materials to perform the required work as expeditiously as possible.

(Code 1992, § 5-354; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-886. Costs of emergency repairs.

Costs incurred in the performance of emergency work shall be paid by the jurisdiction. The legal counsel of the jurisdiction shall institute appropriate action against the owner of the premises where the unsafe structure is or was located for the recovery of such costs.

(Code 1992, § 5-355; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-887. Hearing.

Any person ordered to take emergency measures shall comply with such order forthwith. Any affected person shall thereafter, upon petition directed to the board of commissioners of the county, be afforded a hearing as described in the mechanical code.

(Code 1992, § 5-356; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-888. Emergency declaration.

In the event of a national, state, or local emergency declaration, the code official may waive or augment the provisions of this chapter as needed during the periods of emergency to protect public safety.

(Code 1992, § 5-357; Ord. No. 2006-16, § 5, 12-14-2006) Sec. 102-889. Disaster assessment.

(a) Notification. Upon notification from emergency first responder personnel, law enforcement personnel or others of a disaster to a building or structure, the code official shall make or cause to be made any necessary visual, nondestructive inspections to determine:

(1) Immediate hazards that jeopardize public safety, health or general welfare;

(2) Extent of damage;

(3) Necessity to evacuate or condemn the building or structure;

(4) Necessity to disconnect or authorize reestablishment of utilities;

(5) What permits will be required; and

(6) Whether plans are necessary.

(b) Posting of placards. Placards shall be clearly posted at each entrance of the building or structure immediately upon completion of a disaster assessment as follows:

(1) Inspected—No Restriction on Lawful Use or Occupancy (Green);

(2) Danger!—Limited Entry (Yellow); or

(3) Danger!—No Entry (Red).

It shall be unlawful to remove placards posted by the code official.

(Code 1992, § 5-358; Ord. No. 2006-16, § 5, 12-14-2006; Ord. No. 2019-08, § 30, 11-14-2019)

Secs. 102-890—102-911. Reserved.

ARTICLE VI. PROCEDURES FOR THE ADMINISTRATION OF THE

PLUMBING CODE

DIVISION 1. GENERALLY

Sec. 102-912. Title.

The provisions of this article apply to the International Plumbing Code, as adopted in section 102-22. In this article the term plumbing code means the International Plumbing Code as adopted in section 102-22.

(Code 1992, § 5-361; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-913. Scope.

The provisions of the plumbing code shall apply to the erection, installation, alteration, repairs, relocation, replacement, addition to, use or maintenance of plumbing systems within this jurisdiction. The plumbing code shall also regulate nonflammable medical gas, inhalation anesthetic, vacuum piping, nonmedical oxygen systems and sanitary and condensate vacuum collection systems. The installation of fuel gas distribution piping and equipment, fuel-gas-fired water heaters and water heater venting systems shall be regulated by the International Fuel Gas Code. Provisions in the appendices shall not apply unless specifically adopted.

(Code 1992, § 5-362; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-914. Intent.

(a) Purpose. The purpose of the plumbing code is to establish the minimum requirements to safeguard life or limb, health, property and public welfare by regulating and controlling the design, construction, installation, quality of materials, location, operation and maintenance or use of plumbing equipment and systems.

The purpose of the plumbing code is not to create or otherwise establish or designate any particular class or group of persons who will or should be especially protected or benefitted by the terms of the plumbing code.

(b) Public duty, warranty and quality control. The permitting, plans examination or inspection conducted with regard to a plumbing system in accordance with the plumbing code constitutes a public duty and does not warrant or ensure the absence of any hazard, deficiency or other matter. Any duty created by or based on the plumbing code is transferred to the public, and no private cause of action is created by a breach of such duty. The plumbing code shall not be construed to relieve from or lessen the responsibility of any person, firm or corporation owning, operating or controlling any plumbing system for any damages to persons or property caused by defects, nor shall the department of plumbing inspection or the county be held as assuming any such liability by reason of the inspections or plans examinations authorized by the plumbing code or any permits or certificates issued under the plumbing code. The code official checks for substantial compliance with the plumbing code, but reviews and inspections performed by the code official pursuant to this chapter do not create any guarantee or warranty that plumbing systems have been constructed in accordance with all provisions of the plumbing code. The permitting, plans examination, or inspection of any plumbing system or construction document shall not be construed as a warranty of the physical condition or adequacy of such plumbing system or construction document, including without limitation a representation or warranty that a plumbing system is complete, that it is in compliance with the plumbing code or any other law, that it was inspected, that it is safe or ready for occupancy or that it meets any particular degree of quality or workmanship. Quality control of materials and workmanship is not within the purview of the plumbing code, except as it relates to the purposes stated therein.

The amount and quality of inspection and other services provided is discretionary with the code official and may vary in response to the amount of staff, work load, training and experience, funding and other pertinent factors affecting whether and how inspection is made or whether any hazard, deficiency or similar matter is observed.

(Code 1992, § 5-363; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-915. Existing installations.

Plumbing systems lawfully in existence at the time of the adoption of the plumbing code shall be permitted to have their use and maintenance continued if the use, maintenance or repair is in accordance with the original design and no hazard to life, health or property is created by such plumbing system.

(Code 1992, § 5-364; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-916. Maintenance.

All plumbing systems, materials and appurtenances, both existing and new, and all parts thereof, shall be maintained in proper operating condition in accordance with the original design in a safe and sanitary condition. All device or safeguards required by the plumbing code shall be maintained in compliance with the plumbing code edition under which they were installed. The owner or the owner's designated agent shall be responsible for maintenance of plumbing systems. To determine compliance with this provision, the code official shall have the authority to require any plumbing system to be reinspected.

(Code 1992, § 5-365; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-917. Additions, alterations or repairs.

Additions, alterations, renovations or repairs to any plumbing system shall conform to that required for a new plumbing system without requiring the existing plumbing system to comply with all the requirements of the plumbing code.

Additions, alterations or repairs shall not cause an existing system to become unsafe, unsanitary or overloaded. Minor additions, alterations, renovations and repairs to existing plumbing systems shall be permitted in the same manner and arrangement as in the existing system, provided that such repairs or replacements are not hazardous and are approved.

(Code 1992, § 5-366; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-918. Change in occupancy.

It shall be unlawful to make any change in the occupancy of any structure that will subject the structure to any special provision of the plumbing code without approval of the code official. The code official shall certify that such structure meets the intent of the provisions of law governing building construction for the proposed new occupancy and that such change of occupancy does not result in any hazard to the public health, safety or welfare.

(Code 1992, § 5-366; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-919. Historic buildings.

The provisions of the plumbing code relating to the construction, alteration, repair, enlargement, restoration, relocation or moving of buildings or structures shall not be mandatory for existing buildings or structures identified and classified by the state or local jurisdiction as historic buildings when such buildings or structures are judged by the code official to be safe and in the public interest of health, safety and welfare regarding any proposed construction, alteration, repair, enlargement, restoration, relocation or moving of buildings.

(Code 1992, § 5-368; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-920. Moved buildings.

Except as determined by the plumbing code, plumbing systems that are a part of buildings or structures moved into or within the jurisdiction shall comply with the provisions of the plumbing code for new installations.

(Code 1992, § 5-369; Ord. No. 2006-16, § 6, 12-14-2006; Ord. No. 2019-08, § 31, 11-14-2019)

Sec. 102-921. Requirements not covered by plumbing code.

Any requirements necessary for the strength, stability or proper operation of an existing or proposed plumbing system, or for the public safety, health and general welfare, not specifically covered by the plumbing code shall be determined by the code official.

(Code 1992, § 5-370; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-922. Severability.

If any action, subsection, sentence, clause or phrase of the plumbing code is for any reason held to be unconstitutional, such decision shall not affect the validity of the remaining portions of the plumbing code.

(Code 1992, § 5-371; Ord. No. 2006-16, § 6, 12-14-2006) Secs. 102-923—102-947. Reserved.

DIVISION 2. PERMITS

Sec. 102-948. When required.

(a) Required. Any owner, authorized agent or contractor who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any plumbing system, the installation of which is regulated by the plumbing code, or to cause any such work to be done, shall first make application to the code official and obtain the required permit.

(b) Exception. Where equipment and appliance replacements or repairs must be performed in an emergency situation, the permit application shall be submitted within the next business day of the department of plumbing inspection. For the purposes of this section, the term emergency means an unexpected situation requiring prompt action to safeguard life or limb, health, property and public welfare. This section shall not be construed as allowing work to be done without a permit to restore comfort and convenience items, equipment or systems. Emergency work performed shall not be done contrary to the provisions of the plumbing code. If a licensed contractor performs work without obtaining any necessary permit, there is a rebuttable presumption that the contractor willfully and deliberately violated the building laws of this jurisdiction.

(Code 1992, § 5-381; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-949. Exempt work.

The following work shall be exempt from the requirement for a permit:

(1) The stopping of leaks in drains, water, soil, waste or vent pipe; provided, however, that if any concealed trap, drainpipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with new material, such work shall be considered as new work and a permit shall be obtained and inspection made as provided in the plumbing code.

(2) The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures, and the removal and reinstallation of water closets, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures.

Exemption from the permit requirements of the plumbing code shall not be deemed to grant authorization for any work to be done in violation of the provisions of the plumbing code or any other laws or ordinances of this jurisdiction.

(Code 1992, § 5-382; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-950. Application for permit.

(a) Required. Each application for a permit, with the required fee, shall be filed with the code official on a form furnished for that purpose and shall contain a general description of the proposed work and its location. The application shall be signed by the owner or an authorized agent. The permit application shall indicate the proposed occupancy of all parts of the building and of that portion of the site or lot, if any, not covered by the building or structure and shall contain such other information required by the code official.

(b) Construction documents. The code official shall examine or cause to be examined the accompanying construction documents and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of the plumbing code and other pertinent laws or ordinances.

Construction documents, engineering calculations, diagrams and other such data shall be submitted in two or more sets with each application for a permit. The code official shall require construction documents, computations and specifications to be prepared and designed by a registered design professional where required by state law. Construction documents shall be drawn to scale and shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that the work conforms to the provisions of the plumbing code. Construction documents for buildings more than two stories in height shall indicate where penetrations will be made for pipe, fittings and components an shall indicate the materials and methods for maintaining required structural safety, fire-resistance rating and fireblocking. Sketches and pencil or other erasable media used to prepare construction documents shall not be accepted by the code official.

(1) Exception. The code official is authorized to waive the submission of construction documents, calculations or other data if the nature of the work applied for is such that review of construction documents is not necessary to determine compliance with the plumbing code.

(c) Action on application. The code official shall examine or cause to be examined applications for permits and amendments thereto within a reasonable time after filing. If the application or the construction documents do not conform to the requirements of pertinent laws, the code official shall reject such application in writing, stating the reasons therefor. If the code official is satisfied that the proposed work conforms to the requirements of the plumbing code and laws and ordinances applicable thereto, the code official shall issue a permit therefor as soon as practicable.

(d) Time limitation of application. An application for a permit for any proposed work or operation shall be deemed to have been abandoned 180 days after the date of filing, unless such application has been pursued in good faith or a permit has been issued; except that the code official is authorized to grant one extension of time for an additional period not exceeding 180 days. No application shall be extended more than once. The extension shall be requested in writing and justifiable cause demonstrated. A request for an extension must be received by the code official prior to the expiration of the application. The code official is not required to notify the applicant prior to the application's expiration or that the application has expired.

(Code 1992, § 5-383; Ord. No. 2006-16, § 6, 12-14-2006; Ord. No. 2019-08, § 32, 11-14-2019)

Sec. 102-951. By whom application is made.

Application for a permit shall be made by the person or agent to install all or part of any plumbing system. The applicant shall meet all qualifications established by statute, or by rules promulgated by the plumbing code, or by ordinance or by resolution. The full name and address of the applicant shall be stated in the application.

(Code 1992, § 5-384; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-952. Permit issuance.

(a) Review by code official. The application, construction documents and other data filed by an applicant for permit shall be reviewed by the code official. If the code official finds that the proposed work conforms to the requirements of the plumbing code and all laws and ordinances applicable thereto, and that the fees specified in the plumbing code have been paid, a permit shall be issued to the applicant.

(1) Approved. When the code official issues a permit where construction documents are required, the construction documents shall be approved, in writing and stamped Reviewed For Code Compliance. Such approved construction documents shall not be changed, modified or altered without authorization form the code official. All work shall be done in accordance with the approved construction documents. The code official is authorized to issue a permit for the construction of a part of a plumbing system before the entire construction documents for the whole system have been submitted or approved, provided that adequate information and detailed statements have been filed complying with pertinent requirements of the plumbing code. The holder of such permit for the foundation or other parts of a building or structure shall proceed at the holder's own risk without assurance that the permit for the entire plumbing system will be granted.

(2) Amended. Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents. Willful and prejudicial departure from or disregard of construction documents in any material respect without the approval of the code official is unlawful.

(b) Validity. The issuance of a permit or approval of construction documents shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the plumbing code or of any other ordinance of the jurisdiction.

Permits presuming to give authority to violate or cancel the provisions of the plumbing code or other ordinances of the jurisdiction shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the plumbing official from requiring the correction of errors in the construction documents and other data or from preventing building operations being carried on thereunder when in violation of the plumbing or of other ordinances of this jurisdiction. The code official is also authorized to prevent occupancy or use of a structure where in violation of the plumbing code or of any other ordinances of this jurisdiction.

(c) Expiration. Every permit issued shall expire by limitation and become null and void if the work authorized by such permit is not commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. A minimum of one inspection approval must be obtained as evidence that work was commenced or that work has continued. The determination as to whether work was suspended shall be based on the most recent inspection approval date.

(d) Extensions. The code official is authorized to grant, in writing, one extension of time for an additional period of not more than 180 days provided no changes have been made or will be made in the original construction documents for such work. No permit shall be extended more than once. The extension shall be requested in writing and justifiable cause demonstrated. Requests for extensions must be received by the code official prior to the expiration of the permit. The code official is not required to notify the permittee prior to the permits expiration or that the permit has expired. The fee for an extension shall be one-half the amount required for a new permit for such work.

(e) Suspension or revocation of permit. The code official shall revoke a permit or approval issued under the provisions of the plumbing code in case of any false statement or misrepresentation of fact in the application or on the construction documents upon which the permit or approval was based.

(f) Retention of construction documents. One set of construction documents shall be retained by the code official until final approval of the work covered therein. One set of approved construction documents shall be returned to the applicant, and said set shall be kept on the site of the building or work at all times during which the work authorized thereby is in progress.

(g) Placement of permit. Work for which a permit is required shall not be commenced until the building permit or copy thereof is posted on the site of the work until the completion of the project. The posted permit shall be visible from the street and maintained in such location by the permittee until final approval has been granted by the code official.

(h) Responsibility. It shall be the duty of every person who performs work for which the plumbing code is applicable, to comply with the plumbing code.

(i) Approved construction documents. Work for which a permit is required shall not be commenced until the permittee has made available approved construction documents on the premises and in such a position to allow the code official convenient access and use. These items shall be protected from the elements and maintained in such location by the permittee until final approval has been granted by the code official.

(j) Work without a permit; investigation required. Whenever any work for which a permit is required has been commenced without first obtaining said permit, a stop work order shall be issued pursuant to division 4 of this article and a special investigation shall be made before a permit may be issued for such work.

(Code 1992, § 5-385; Ord. No. 2006-16, § 6, 12-14-2006; Ord. No. 2019-08, § 33, 11-14-2019)

Sec. 102-953. Fees.

(a) Payment of fees. A permit shall not be issued until the fees prescribed in subsection (c) of this section have been paid, and an amendment to a permit shall not be released until the additional fee, if any, due to an increase of the plumbing systems, has been paid.

(b) Investigation fees: work without a permit. Where work, for which a permit is required, has been commenced prior to obtaining a permit, an investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by the plumbing code. The minimum investigation fee shall be the same as the minimum permit fee set forth in accordance with the schedule as established by the board of commissioners of the county. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of the plumbing code nor from any penalty prescribed by law.

(c) Fee schedule. For plumbing systems or alterations requiring a permit or other designated activity, a fee for each permit shall be paid as required, in accordance with the schedule as established by the board of commissioners of the county.

(d) Fee refunds.

(1) The code official is authorized to establish a refund policy.

(2) Refunds shall not be given:

a. For an application or permit that has expired.

b. If more than 180 days has elapsed from the application submittal date.

c. If more than 180 days has elapsed from the permit issuance date.

d. For that component of the permit fee which is representative of the development impact fee.

e. For plan review already performed.

f. If an inspection has been performed.

(Code 1992, § 5-386; Ord. No. 2006-16, § 6, 12-14-2006; Ord. No. 2019-08, § 34, 11-14-2019)

Secs. 102-954—102-979. Reserved.

DIVISION 3. INSPECTIONS AND TESTING

Sec. 102-980. Generally.

Work for which a permit is required shall be subject to inspection by the code official and such work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the plumbing code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the plumbing code or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the code official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection.

(Code 1992, § 5-391; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-981. Preliminary inspection.

Before issuing a permit, the code official is authorized to examine, or cause to be examined, plumbing systems for which an application has been filed.

(Code 1992, § 5-392; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-982. Required inspections and testing.

(a) Notification. The code official, upon notification from the permit holder or the permit holder's agent, shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or an agent of any violations that must be corrected.

The holder of the permit shall be responsible for the scheduling of such inspections.

(1) Underground inspection shall be made after trenches or ditches are excavated and bedded, piping installed, and before any backfill is put in place.

(2) Rough-in inspection shall be made after the roof, framing, fireblocking, firestopping, draftstopping and bracing is in place and all sanitary, storm and water distribution piping is roughed-in, and prior to the installation of wall or ceiling membranes.

(3) Final inspection shall be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy.

(4) Other inspections. In addition to the inspections specified above, the code official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of the plumbing code and other laws that are enforced by the department of plumbing inspection.

(b) Approved agencies. Test reports submitted to the code official for consideration shall be developed by approved agencies that have satisfied the requirements as to qualifications and reliability.

(c) Evaluation and followup inspection services. Prior to the approval of a closed, prefabricated plumbing system and the issuance of a plumbing permit, the code official shall require the submittal of an evaluation report on each prefabricated plumbing system indicating the complete details of the plumbing system, including a description of the system and its components, the basis upon which the plumbing system is being evaluated, test results and similar information, and other data as necessary for the code official to determine conformance to the plumbing code.

(1) Evaluation service. The code official shall designate the evaluation service of an approved agency as the evaluation agency, and review such agency's evaluation report for adequacy and conformance to the plumbing code.

(2) Followup inspection. Except where ready access is provided to all plumbing systems, service equipment and accessories for complete inspection at the site without disassembly or dismantling, the code official shall conduct the frequency of in-plant inspections necessary to ensure conformance to the approved evaluation report or shall designate an independent, approved inspection agency to conduct such inspections. The inspection agency shall furnish the code official with the followup inspection manual and a report of inspections upon request, and the plumbing system shall have an identifying label permanently affixed to the system indicating that factory inspections have been performed.

(3) Test and inspection records. All required test and inspection records shall be available to the code official at all times during the fabrication of the plumbing system and the erection of the building, or such records as the code official designates shall be filed.

(Code 1992, § 5-393; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-983. Special inspections.

(a) Special inspections. Special inspections of alternative engineered design plumbing systems shall be conducted in accordance with subsections (b) and (c) of this section.

(b) Periodic inspection. The registered design professional or designated inspector shall periodically inspect and observe the alternative engineered design to determine that the installation is in accordance with the approved construction documents. All discrepancies shall be brought to the immediate attention of the plumbing contractor for correction. Records shall be kept of all inspections.

(c) Written report. The registered design professional shall submit a final report in writing to the code official upon completion of the installation, certifying that the alternative engineered design conforms to the approved construction documents. A notice of approval for the plumbing system shall not be issued until a written certification has been submitted.

(Code 1992, § 5-394; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-984. Testing.

(a) Required. Plumbing work and systems shall be tested as required in the plumbing code and in accordance with subsections (b) through (d) of this section.

Tests shall be made by the permit holder and observed by the code official.

(b) New, altered, extended or repaired systems. New plumbing systems and parts of existing systems that have been altered, extended or repaired shall be tested as prescribed herein to disclose leaks and defects, except that testing is not required in the following cases:

(1) In any case that does not include addition to, replacement, alteration or relocation of any water supply, drainage or vent piping.

(2) In any case where plumbing equipment is set up temporarily for exhibition purposes.

(c) Equipment, material and labor for tests. All equipment, material and labor required for testing a plumbing system or part thereof shall be furnished by the permit holder.

(d) Reinspection and testing. Where any work or installation does not pass any initial test or inspection, the necessary corrections shall be made to comply with the plumbing code. The work or installation shall then be resubmitted to the code official for inspection and testing.

(Code 1992, § 5-395; Ord. No. 2006-16, § 6, 12-14-2006; Ord. No. 2019-08, § 35, 11-14-2019)

Sec. 102-985. Approval.

After the prescribed tests and inspections indicate that the work complies in all respects with the plumbing code, a notice of approval shall be issued by the code official. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the code official. The code official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or shall notify the permit holder or his agent wherein the same fails to comply with the plumbing code.

Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the code official.

(Code 1992, § 5-396; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-986. Temporary connection.

The code official shall have the authority to authorize the temporary connection of the building or system to the utility source for the purpose of testing plumbing systems or for use under a temporary certificate of occupancy.

(Code 1992, § 5-397; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-987. Work covered without inspection approval: investigation required.

Whenever any work for which a permit is required has been covered without first obtaining the necessary inspection approval, a special investigation shall be made before subsequent inspections are approved. The work shall be uncovered to allow an inspection.

(Code 1992, § 5-398; Ord. No. 2006-16, § 6, 12-14-2006; Ord. No. 2019-08, § 36, 11-14-2019)

Sec. 102-988. Inspection requests.

It shall be the duty of the permit holder of the building permit or their duly authorized agent to notify the code official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work that are required by the plumbing code.

(Code 1992, § 5-399; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-989. Alternative engineered design.

(a) Alternative design. The design, documentation, inspection, testing and approval of an alternative engineered design plumbing system shall comply with subsections

(b) through (g) of this section.

(b) Design criteria. An alternative engineered design shall conform to the intent of the provisions of the plumbing code and shall provide an equivalent level of quality, strength, effectiveness, fire resistance, durability and safety. Material, equipment or components shall be designed and installed in accordance with the manufacturer's installation instructions.

(c) Submittal. The registered design professional shall indicate on the permit application that the plumbing system is an alternative engineered design. The permit and permanent permit records shall indicate that an alternative design was part of the approved installation.

(d) Technical data. The registered design professional shall submit sufficient technical data to substantiate the proposed alternative engineered design and to prove that the performance meets the intent of the plumbing code.

(e) Construction documents. The registered design professional shall submit to the code official two complete sets of signed and sealed construction documents for the alternative engineered design. The construction documents shall include floor plans and a riser diagram of the work. Where appropriate, the construction documents shall indicate the direction of the flow, all pipe sizes, grade of horizontal piping, loading, and location of fixtures and appliances.

(f) Design approval. Where the code official determines that the alternative engineered design conforms to the intent of the plumbing code, the plumbing system shall be approved. If the alternative engineered design is not approved, the code official shall notify the registered design professional in writing, stating the reasons therefor.

(g) Inspection and testing. The alternative engineered design shall be tested and inspected in accordance with the requirements of this division and the plumbing code.

(Code 1992, § 5-400; Ord. No. 2006-16, § 6, 12-14-2006; Ord. No. 2019-08, § 37, 11-14-2019)

Secs. 102-990—102-1006. Reserved.

DIVISION 4. VIOLATIONS

Sec. 102-1007. Unlawful acts.

It shall be unlawful for any person, firm or corporation to erect, construct, alter, extend, repair, remove, demolish or utilize any plumbing system, or cause same to be done, in conflict with or in violation of any of the provisions of the plumbing code.

(Code 1992, § 5-411; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-1008. Notice of violation.

The code official shall serve a notice of violation or order on the person responsible for the erection, installation, alteration, extension, repair, removal or demolition of plumbing work in violation of the provisions of the plumbing code, or in violation of a detail statement or the approved construction documents thereunder, or in violation of a permit or certificate issued under the provisions of the plumbing code.

Such order shall direct the discontinuance of the illegal action or condition and the abatement of the violation.

(Code 1992, § 5-412; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-1009. Prosecution of violation.

If the notice of violation is not complied with in the time prescribed by such notice, the code official shall request the solicitor general of the county state court to institute the appropriate proceeding at law or in equity to restrain, correct or abate such violation, or to require the removal or termination of the unlawful occupancy of the building or structure in violation of the provisions of the plumbing code or of the order or direction made pursuant thereto.

(Code 1992, § 5-413; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-1010. Violation penalties.

Any person who violates a provision of the plumbing code or fails to comply with any of the requirements thereof or who erects, constructs, alters or repairs plumbing work in violation of the approved construction documents or directive of the code official, or of a permit or certificate issued under the provisions of the plumbing code, shall be subject to penalties as prescribed by law. Each day that a violation continues after due notice has been served shall be deemed a separate offense.

(Code 1992, § 5-414; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-1011. Stop work orders.

Upon notice from the code official, work on any plumbing system that is being done contrary to the provisions of the plumbing code, other pertinent laws or ordinances implemented through the enforcement of the plumbing code, or in a dangerous or unsafe manner shall immediately cease. Such notice shall be in writing and shall be given to the owner of the property, or to the owner's agent or to the person doing the work. The notice shall state the conditions under which work is authorized to resume. When an emergency exists, the code official shall not be required to give a written notice prior to stopping the work. Any person who shall continue any work in or about the structure after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to penalties as prescribed by law.

(Code 1992, § 5-415; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-1012. Abatement of violation.

The imposition of the penalties herein prescribed shall not preclude the legal officer of the jurisdiction from instituting appropriate action to prevent unlawful construction or to restrain, correct or abate a violation, or to prevent illegal occupancy of a building, structure or premises, or to stop an illegal act, conduct, business or utilization of the plumbing on or about any premises.

(Code 1992, § 5-416; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-1013. Unsafe plumbing.

(a) Declaration of public nuisance. Any plumbing regulated by the plumbing code that is unsafe or that constitutes a fire or health hazard, unsanitary condition, or is otherwise dangerous to human life is hereby declared unsafe. Any use of plumbing regulated by the plumbing code constituting a hazard to safety, health or public welfare by reason of inadequate maintenance, dilapidation, obsolescence, fire hazard, disaster, damage or abandonment is hereby declared an unsafe use. Any such unsafe equipment is hereby declared to be a public nuisance and shall be abated by repair, rehabilitation, demolition or removal.

(b) Authority to condemn equipment. Whenever the code official determines that any plumbing, or portion thereof, regulated by the plumbing code has become hazardous to life, health or property or has become unsanitary, the code official shall order in writing that such plumbing either be removed or restored to a safe or sanitary condition. A time limit for compliance with such order shall be specified in the written notice. No person shall use or maintain defective plumbing after receiving such notice. When such plumbing is to be disconnected, written notice as prescribed in section 102-1008 shall be given. In cases of immediate danger to life or property, such disconnection shall be made immediately without such notice.

(c) Authority to disconnect service utilities. The code official shall have the authority to authorize disconnection of utility service to the building, structure or system regulated by the technical codes in case of an emergency, where necessary, to eliminate an immediate danger to life or property. Where possible, the owner and occupant of the building, structure or service system shall be notified of the decision to disconnect utility service prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or service systems shall be notified in writing, as soon as practical thereafter.

(d) Connection after order to disconnect. No person shall make connection form any energy, fuel, power supply or water distribution system or supply energy, fuel or water to any equipment regulated by the plumbing code that has been disconnected or ordered to be disconnected by the code official or the use of which has been ordered to be disconnected by the code official until the code official authorizes the reconnection and use of such equipment. When any plumbing is maintained in violation of the plumbing code, and in violation of any notice issued pursuant to the provisions of this section, the code official shall institute any appropriate action to prevent, restrain, correct or abate the violation.

(Code 1992, § 5-417; Ord. No. 2006-16, § 6, 12-14-2006) Secs. 102-1014—102-1039. Reserved.

DIVISION 5. EMERGENCY MEASURES

Sec. 102-1040. Imminent danger.

When, in the opinion of the code official, there is imminent danger of failure or collapse of a building that endangers life, or when any building or part of a building has fallen and life is endangered by the occupation of the building, or when there is actual or potential danger to the building occupants or those in the proximity of any structure because of explosives, explosive fumes or vapors, or the presence of toxic fumes, gases, or materials, or operation of defective or dangerous equipment, the code official is hereby authorized an empowered to order and require the occupants to vacate the premises forthwith. The code official shall cause to be posted at each entrance to such structure a notice reading as follows: DANGER—NO ENTRY. It shall be unlawful for any person to enter such structure except for the purpose of securing the structure, making the required repairs, removing the hazardous condition, or of demolishing the same.

(Code 1992, § 5-421; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-1041. Temporary safeguards.

Notwithstanding other provisions of the plumbing code, whenever, in the opinion of the code official, there is imminent danger due to an unsafe condition, the code official shall order the necessary work to be done, including the boarding up of openings, to render such structure temporarily safe whether or not the legal procedure herein described has been instituted; and shall cause such other action to be taken as the code official deems necessary to meet such emergency.

(Code 1992, § 5-422; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-1042. Closing streets.

When necessary for public safety, the code official shall temporarily close structures and close, or order the authority having jurisdiction to close, sidewalks, streets, public ways and places adjacent to unsafe structures, and prohibit the same from being utilized.

(Code 1992, § 5-423; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-1043. Emergency repairs.

For the purposes of this section, the code official shall employ the necessary labor and materials to perform the required work as expeditiously as possible.

(Code 1992, § 5-424; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-1044. Costs of emergency repairs.

Costs incurred in the performance of emergency work shall be paid by the jurisdiction. The legal counsel of the jurisdiction shall institute appropriate action against the owner of the premises where the unsafe structure is or was located for the recovery of such costs.

(Code 1992, § 5-425; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-1045. Hearing.

Any person ordered to take emergency measures shall comply with such order forthwith. Any affected person shall thereafter, upon petition directed to the board of commissioners of the county, be afforded a hearing as described in the plumbing code.

(Code 1992, § 5-426; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-1046. Emergency declaration.

In the event of a national, state, or local emergency declaration, the code official may waive or augment the provisions of this chapter as needed during the periods of emergency to protect public safety.

(Code 1992, § 5-427; Ord. No. 2006-16, § 6, 12-14-2006) Sec. 102-1047. Disaster assessment.

(a) Notification. Upon notification from emergency first responder personnel, law enforcement personnel or others of a disaster to a building or structure, the code official shall make or cause to be made any necessary visual, nondestructive inspections to determine:

(1) Immediate hazards that jeopardize public safety, health or general welfare;

(2) Extent of damage;

(3) Necessity to evacuate or condemn the building or structure;

(4) Necessity to disconnect or authorize reestablishment of utilities;

(5) What permits will be required; and

(6) Whether plans are necessary.

(b) Posting of placards. Placards shall be clearly posted at each entrance of the building or structure immediately upon completion of a disaster assessment as follows:

(1) Inspected—No Restriction on Lawful Use or Occupancy (Green);

(2) Danger!—Limited Entry (Yellow); or

(3) Danger!—No Entry (Red).

It shall be unlawful to remove placards posted by the code official.

(Code 1992, § 5-428; Ord. No. 2006-16, § 6, 12-14-2006; Ord. No. 2019-08, § 38, 11-14-2019)

Secs. 102-1048—102-1077. Reserved.

ARTICLE VII. PROCEDURES FOR THE ADMINISTRATION OF THE

ELECTRICAL CODE

DIVISION 1. GENERALLY

Sec. 102-1078. Applicability to electrical code The provisions of this article apply to the National Electrical Code, as adopted in section 102-22. In this article the term electrical code means the National Electrical Code as adopted in section 102-22.

(Code 1992, § 5-431; Ord. No. 2006-16, § 7, 12-14-2006) Sec. 102-1079. Purpose.

(a) Purpose. The purpose of the electrical code is to establish the minimum requirements to safeguard life or limb, health, property and public welfare by regulating and controlling the design, construction, installation, quality of materials, location, operation and maintenance or use of electrical systems and equipment.

The purpose of the electrical code is not to create or otherwise establish or designate any particular class or group of persons who will or should be especially protected or benefitted by the terms of the electrical code.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:fayette-county/code/whole@2026-05-28-208242a964

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.