(a) Purpose and intent. The purpose of this chapter is to provide procedures, rules and regulations governing any person, entity, partnership, corporation, association or other organization engaged in commercial timber operations in the unincorporated area of the county and to provide for the notice by such person, entity, partnership, corporation, association or other organization to allow for the taxation of timber harvesting, to provide the efficient collection of the timber harvest, to protect the environment, county road system and to assure the public's safety. (b) Definitions. The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Board means the Gilmer County Board of Commissioners. County means [the] Gilmer County, Georgia. County right-of-way means the shoulder, front slope, ditch, drain, and back slope, facility or any appurtenance of any county road, whether owned by title or otherwise, as herein defined. County road means any and all roads which are part of the county road system, delineated in accordance with O.C.G.A. § 32-4-1, et seq., and intended or used for the passage of motor vehicles by the public. Damage means any and all injury to the road surface, road base or rights-of-way of a road within 100 feet of any designated entrance or exit from the timber harvesting site, including, but not limited to, the following: (1) Diversion of or the filling of any drainage ditch, culvert or pipe parallel to or underneath a county road, so as to restrain or redirect the flow of water. (2) The operation of any vehicle, machinery or equipment which gouges, rips, breaks, depresses or otherwise defaces a public road beyond normal wear and tear. (3) The continued ingress or egress to and from a county road at a particular location which results in a buildup of rock, gravel, mud, dirt or other materials, which present hazards to other persons using the county road for authorized purposes. (4) The creation or erection of any dam, berm, ditch or wall which restrains the natural flow of water and results in the redirecting of waters onto the road surface of any county road. (5) The term does not include normal wear and tear to county roads from use of such roads by an operator in the course of transporting timber or pulpwood harvested in the county. Driveway means any temporary roadway, drive, structure, fill or device, existing or constructed, that is used or employed for the purpose of crossing, traveling upon or use of county right-of-ways. Enforcement officer means the director of the county planning and zoning department or designee. Notice means the notice as described and referred to in O.C.G.A. § 12-6-24. Property owner means the person or legal entity holding title to the real property for which a timber operations notice is being requested. Timber means softwood or hardwood trees. Timber harvesting means the harvesting of standing timber for delivery as pulpwood, logs, poles, posts, or wood chips to any wood yard or processing plant located inside or outside this state. Timber operator means any person, entity, partnership, corporation, association or other organization including the officers, agents and employees thereof, engaged in buying, harvesting or hauling timber in the county for commercial or profit making purposes. Tract means a particular parcel or lot of land, as identified by parcel ID by the county tax assessors, or a particular stand of trees to be harvested on a particular lot or parcel of land, as identified by parcel ID by the county tax assessors. (c) Notice required. (1) All persons or firms harvesting standing timber in any unincorporated area of the county for delivery as pulpwood, logs, poles, posts, or wood chips to any woodyard or processing plant located inside or outside this state shall provide notice of such harvesting operations to the county governing authority or the designated agent thereof prior to entering onto the property if possible, but in no event later than 24 hours after entering onto the property. Further, such persons shall give notice of cessation of cutting within 24 hours after the job is completed. (2) The notice of harvesting operations required by this article shall be provided for each separate tract to be harvested. Such notice shall be made in such form as prescribed by rule or regulation of the director of the state forestry commission, and shall include the following information: a. A map of the area which identifies the location of the tract to be harvested and, as to those trucks which will be traveling to and from such tract for purposes of picking up and hauling loads of cut forest products, the main point of ingress to such tract from a public road and, if different, the main point of egress from such tract to a public road. If multiple points of ingress and/or egress will be used, all such points shall be identified; b. A statement as to whether the timber will be removed pursuant to a lump sum sale, per unit sale, or owner harvest for purposes of ad valorem taxation under O.C.G.A. § 48-5-7.5; c. The name, address, and daytime telephone number of the timber seller if the harvest is pursuant to a lump sum or per unit sale or of the timber owner if the harvest is an owner harvest; and d. The name, business address, business telephone number, and nighttime or emergency telephone number of the person or firm harvesting such timber. (3) Subject to the provisions of paragraph (c)(5) of this section, the notice required by this article may be submitted in person, by transmission of an electronic record via facsimile or e-mail, or by mail. (4) Subject to the provisions of paragraph (c)(5) of this section, upon notification published by the director of the state forestry commission that a state-wide notification website or platform is available for public use, persons or firms wishing to utilize said website or platform to provide the notice required by this article may do so at their option, and the county will accept notifications submitted in this manner. (5) On and after a date specified and published by the director of the state forestry commission, use of the state-wide notification website or platform shall be mandatory and shall be the sole means of providing the notice required by this article; on and after said date submission of the notice by any of the means listed in paragraph (c)(3) above shall cease and will no longer be deemed acceptable or in compliance with this article. (6) Following the submission of the notice, the enforcement officer will inspect and document the access points within two business days. (7) The failure of any person, firm or entity ("timber operator") to provide the surety bond or irrevocable letter of credit as provided in this chapter shall render the notice as required in this section ineffective for any such harvesting operation(s) unless and until said person, firm or entity ("timber operator") providing said notice has delivered to the enforcement officer the required valid surety bond or irrevocable letter of credit. (8) Notice shall be effective for such harvesting operation on such tract within such unincorporated area of the county upon receipt of the same by the enforcement officer, and compliance with the requirements of this chapter, and until such time as the person or firm ("timber operator") giving such notice has completed the harvesting operation for such tract; provided, however, that any subsequent change in the facts required to be provided for purposes of such notice shall be reported to the enforcement officer within three business days after such change or the notice shall cease to be effective. (d} Bond required. (1) The notice required by this article shall not be or remain effective unless and until the person or firm providing such notice has delivered to the governing authority of the county or its designated agent a valid surety bond, executed by a surety corporation authorized to transact business in this state, protecting the county against any damage caused by such person or firm in the amount of $5,000.00; provided, however, that at the option of the person or firm harvesting timber a valid irrevocable letter of credit issued by a bank or savings and loan association, as defined in O.C.G.A. § 7-1-4, in the amount of $5,000.00 may be provided in lieu of a surety bond. Such bonds or letters of credit shall be subject to the conditions set forth in this article. No more than one bond or letter of credit shall be required from each person or firm harvesting timber, regardless of the number of tracts harvested in the county for so long as the bond or letter of credit remains in effect. The bond or letter of credit required herein shall be valid only for the calendar year in which it was delivered. (2) The bond or letter of credit required by paragraph (d)(1) of this section shall protect the county against any damage requiring re-ditching or repair of existing ditch structures or the removal of any harvesting residue, including tree tops, debris, logs, pulpwood and other materials, placed in or around the county's rights-of-way caused by such person or firm tendering the bond or letter of credit. The proceeds of such bond or letter of credit shall be available to reimburse the county for any cost incurred to repair such damages or remove such debris in or around the county's rights-of-way. The proceeds of such bond or letter of credit shall also be available to reimburse the county for any costs incurred to maintain or repair county roads damaged by the ingress or egress of motor vehicles engaged in the harvest operations located within 500 feet of any point of ingress or egress of the timber harvesting operation. The right of the county to call such bond or letter of credit in accordance with the provisions of paragraph (d)(1) of this section shall be in addition to any other remedies available to the county at law or in equity for damage to county roads or rights-of-way. (e) Damages. (1) When damage results from a person or firm's harvesting activities, the county shall make and provide a written claim to the person or firm causing the damage within 30 business days after the county becomes aware of the damage. Such claim may be given in person, by facsimile, email or mail. The claim shall describe the damage in detail and, in compliance with paragraph (e)(2) of this section, give the person or firm the opportunity to repair such damage within 30 days of the notification; provided, however, the county shall be authorized to repair the damage immediately if the county or its designee determines the conditions present a threat to public safety, health or welfare and, upon making such repairs, shall present to the person or firm and the issuer of the applicable bond or letter of credit an itemized list of expenses incurred as a claim against the responsible party and the issuer of its bond or letter of credit. Upon the issuance of a claim as provided in this section, the county or its designee shall notify the issuer of the bond or letter of credit that a claim has been made and will be resolved or adjudicated according to the terms of this article. (2) Within 30 days of receipt of the written claim described in paragraph (e)(1) of this section, the person or firm against whom the claim is submitted may: a. Repair such damage at his or its own expense with the approval and supervision of the county or its designee. When repairs are completed to the satisfaction of the county or its designee, the county or its designee shall provide a written notification of satisfactory completion within five business days to the responsible person or firm and to the surety issuing the bond or the bank issuing the letter of credit, thereby terminating the claim. b. In the event of inclement weather or other factors preventing repair of the damage, request a 30 day extension to repair the damage from the county, provided that no extensions shall exceed 90 days from the date the claim was tendered. Approval of any extension shall be at the discretion of the county or its designee. c. Appeal the claim to the magistrate court of the county. Any such appeal must name the issuer of the bond or letter of credit as a party, who shall be served with all pleadings in the action and shall have the right to appear. The magistrate court will hear evidence and arguments within 30 days of the written appeal and issue a ruling within ten days of such hearing. Any such appeal shall toll the 30 day period, or any extension thereof, required by paragraph (e)(1) of this section. If the magistrate court rules in favor of the person or firm against whom the claim was made, the county shall have no right to recover any proceeds of the bond or letter of credit, and judgment shall be entered against the county. If the magistrate court rules in favor of the county the court shall determine the amount of damages to which the county is entitled to recover and enter judgment accordingly; the county shall be authorized to call the bond or letter of credit and recover from the proceeds thereof an amount equal to the judgment entered by the court, up to the total amount of the bond or letter of credit. The portion of any judgment entered in favor of the county that exceeds the amount of the bond or letter of credit shall be subject to collection by any additional remedies at law or equity. d. In the event the person or firm against whom the claim has been submitted fails to take any of the actions allowed under subsections (a), (b), or (c) of this paragraph within the time required therein, such person or firm shall be deemed to have waived any and all rights to contest the call of the bond or letter of credit. (f) Renewal or revocation of bond. (1) If the person or firm tendering a bond or letter of credit pursuant to the requirements of this article continues its timber harvesting operation beyond the calendar year in which the bond or letter of credit was issued, the person or firm continuing the timber harvesting operation shall tender a new bond or letter of credit within five business days after the first day of the new calendar year. (2) In the event a bond or letter of credit tendered pursuant to the requirements of this article is revoked by the surety or bank, then a valid replacement bond or letter of credit must be delivered to the county within five business days after the date of revocation in order for timber harvesting operations to continue. In addition, if the person or firm tendering the bond or letter of credit caused its revocation, the amount of the bond or letter of credit required shall be increased to $7,500.00 after the first revocation, and $10,000.00 after a second revocation caused by the person or firm tendering the bond or letter of credit. The maximum amount of the bond or letter of credit shall not exceed $10,000.00. (g) Operations. (1) Submission of the notice required by this article shall authorize the person or firm submitting same to undertake the timber harvesting operation described in the notice and shall remain in effect until such time as the person or firm gives notice that the harvesting operation is complete; provided, however, that any change in the facts required to be provided for purposes of such notice, including but not limited to a change in the scope or extent of the operation, must be reported to the governing authority of the county within three business days after such change. (2) This article applies to activities which qualify as forestry land management practices or agricultural operations under O.C.G.A. §§ 12-7-17(5) and (6) on land that is zoned for or used for forestry, silvicultural or agricultural purposes. It shall not authorize land disturbing activities incidental to development in conflict with the limitations set forth in O.C.G.A. § 12-7-17(6). (h) Violations. Any person or firm that engages in a timber harvesting operation in the unincorporated portion of the county without complying with the notice requirements of this article shall be subject to a citation and trial, and upon conviction shall be fined in an amount not to exceed $1,500.00 for each violation. (i) Miscellaneous. Consistent with O.C.G.A. § 12-6-24: (1) No fee shall be charged to provide and submit the notice required by this article; and (2) No permit, including a driveway permit, shall be required of the person or firm engaged in a timber harvesting operation as defined by said code section. Persons and firms providing the notice required by this article may be asked to consult with county officials responsible for roads and public works for the purpose of minimizing damage to the county's roads, rights-of-way and infrastructure, and are urged to follow recommendations from county officials. Notwithstanding the foregoing, the person or firm conducting the timber harvest operation bears ultimate responsibility for their actions, and nothing in this article shall preclude the governing authority of the county from taking any and all legal action necessary to protect its property and the health, safety and welfare of its citizens. (3) While said surety bond and/or irrevocable letter of credit shall not be valid for more than one year from the date of delivery to the enforcement officer, said bond and/or letter of credit may be transferred for the purposes of securing another location as many times as may be approved by the enforcement officer during the calendar year that the original bond and/or letter of credit was delivered to the enforcement officer. (j) Posted notice. Once the notice requirement has been met, the enforcement officer will provide a notice at no cost. Said notice must be displayed and available for review at the main point of ingress and egress to a public road and in such a location as to be seen by the traveling public. The notice shall be effective at the time it is properly posted on site. The notice may be posted once the notice requirements have been satisfied and prior to county inspection. (k) Signs. The timber operator shall post two signs in each direction from the point of access onto the county road. One sign at a distance of 1,000 feet stating, "Warning: Logging Operations Ahead," and one sign at a distance of 500 feet stating, "Slow Truck Entering Highway." Signs shall be at least 36 inches by 36 inches, erected in a diamond shape, painted orange with black legend and posted at least three feet from the travel surface of the roadway. (l) Delivery of a copy of the timber harvest notice to the county tax assessor and tax commissioner. Upon receipt of the completed timber harvest notice, the enforcement officer shall immediately forward a completed copy of the timber harvest notice to the county tax assessor and tax commissioner. (m) Standards for operations. During the period of operations, the timber operator shall comply with the following: (1) All timber harvesting operations shall be conducted on the selected tract and off the county roads and rights-of-way. Logging and skidding of logs on county roads and rights-of-way are strictly prohibited. (2) Ditches shall be kept clear of all debris and residue at all times to permit proper drainage. (3) There shall be no blockage of county roads at the access site, and roads must remain open at all times. (4) No timber operator or person shall park or leave unattended a truck, equipment or other motor vehicle or trailer upon the right-of-way of any county road. No county roads shall be used for loading or unloading of equipment, skidding of materials, vehicles or timber. (5) Mud shall not be carried onto paved roads by logging vehicles. (6) The timber operator shall keep the county road adjacent to the tract clean and serviceable at all times to accommodate the passing public, emergency vehicles, school buses, mail carriers, etc. (7) During periods of rain or inclement weather, a temporary road ban order may be placed upon a timber operator if the county roads are unsafe or impassable by designation of the enforcement officer. Written notice shall be given to the timber operator to cease using the county roads in the county for a specific period of time during inclement weather conditions. It is a violation of this article to continue to use any county road after receiving written notice to cease. (8) The timber operator shall install a driveway, using one and one-half-inch — three and one-half-inch stone; minimum pad thickness of six inches; minimum pad width of 20 feet; minimum pad length 50 feet; excavate footprint three inches; if tire washing is required, route runoff from washing to an approved sediment trap or sediment basin; install filter fabric under the entire pad; periodically dress with one and one-half-inch — three and one-half-inch stone, maintain in a condition that will prevent tracking and flow of mud onto public rights-of-way and roads; immediately remove mud and debris tracked or spilled onto roadways. The timber operator shall also meet any further requirements required by state law along state highways. This will be for all existing or future entrances/exits. (9) Driveways shall be piped by the timber operator, and upon completion of the timber harvesting, the pipe shall be removed and the right-of-way returned to its original condition. (10) The timber operator shall clear and gravel an equipment yard or loading dock on the property where the work is to be performed, and said yard shall be of sufficient size to accommodate that particular timber harvesting operation. (11) The enforcement officer, in his/her sole discretion, may waive compliance with one or more of the above requirements in this section. Any waiver must be in writing and provided to the timber operator. (n) Concluding operations. (1) The timber operator shall give written notification to the enforcement officer upon completion of operations. The enforcement officer shall inspect the site to assure that the area has been restored to its original condition, including any shaping of ditches, grading or seeding as required. The timber operator shall be notified in writing of any deficiencies and given notice per paragraph (e)(1) of this section. (2) When the enforcement officer has determined that the road and access site are in a proper state of repair and the payment of timber taxes has occurred, the enforcement officer shall release the posted bond to the timber operator. (o) Exemptions. Exempt from this chapter shall be those timber harvesting activities where a property owner is paying, at fair value/market levels, to have timber cut and removed from their tract of land. In those occasions, the timber operator (or contractor) shall obtain a written affidavit from the property owner in a form prescribed by the board stating the extent of the timber harvesting activities and the amount being paid by the property owner to the timber operator (or contractor). After review of the affidavit, the enforcement officer shall either approve or disapprove the exemption. Also exempt from this chapter shall be those timber harvesting activities where less than 5,000 board feet is harvested in a calendar year by a property owner. An exemption provided herein shall in no way relieve a property owner from complying with O.C.G.A. § 48-5-7.5 as to state ad valorem taxation of timber. (p) Effective date, validity and liability. (1) Effective date. This chapter shall become effective upon adoption. (2) Validity. If any section, paragraph, clause, phrase, or provision of this chapter shall be adjudged invalid or held unconstitutional, such decisions shall not affect the remaining portions of this article. (3) Liability. a. Neither the approval of a plan under the provisions of this article, nor the compliance with provisions of this article shall relieve any person, firm or entity ("timber operator") from the responsibility for damage to any person or property otherwise imposed by the law, nor impose any liability upon the county for damage to any person or property. b. No provision of this article shall permit any person, firm or entity ("timber operator") to violate the Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act, or the rules and regulations promulgated and approved thereunder or pollute any waters of the state as defined thereby.