Sec. 10-5. General provisions.

About this text

  • As published by Municode, current through 2022-02-01
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The following provisions are applicable to all towers and antennas regardless of location unless context limits application to towers only:

(1) Landscaping and maintenance. Tower facilities shall be landscaped with a buffer of plant materials that effectively screens the view of the tower compound from adjacent properties. As such, a landscaping buffer consisting of evergreen material that is at least six feet in height, xeriscape tolerant, or irrigated, shall be planted on all sides of the site, said landscaping plan shall be submitted to the planning and development department when the building permit is applied for. Said buffer shall be maintained and any loss of vegetation within the buffer shall be replaced by the applicant. Existing mature tree growth and natural landforms on the site shall be preserved to the maximum extent possible. In some cases, such as tower sited on large, wooded lots, natural growth around the property perimeter may provide a sufficient buffer as determined by the appropriate county authority. Native vegetation on the site shall be preserved to the greatest practical extent. The applicant shall provide a site plan showing existing significant vegetation to be removed, and vegetation to be replanted to replace that lost.

The landscaping maintenance set forth herein shall be a required condition for approval of the annual occupation registration. No more than two parking spaces per facility shall be allowed, and a minimum ten-foot-wide turnaround drive with an all-weather surface shall be required if parking spaces are provided.

(2) Lighting. Towers and antennas shall not be artificially lighted, unless required by the Federal Aviation Administration or other applicable authority. If lighting is required, the governing authority may review the available lighting alternatives and approve the design that would cause the least disturbance to the surrounding area and views, or the tower shall use a dual lighting system consisting of a strobe light during the day and a slow flashing red light at night unless otherwise required by the Federal Aviation Administration.

(3) Removal of abandoned towers and antennas. After a continuous period of 12 months during which an antenna or tower is not used for its original purpose (including upgraded equipment), it shall be considered abandoned, and the owner of such antenna or tower shall remove same within 90 days of receipt of notice from Glascock County Board of Commissioners notifying the owner of such abandonment. The owner may request a three-month extension prior to the end of the 12-month period.

Said three-month extension may be granted administratively by the planning and development department if the request is received in writing by the planning and development department prior to the end of the 12-month period. If a three-month grace period is granted, then a notice of abandonment will be given to the owner at the end of the three-month period. If any abandoned antenna or tower is not removed by the owner within said 90 days after notice of abandonment, then the governing authority may remove such antenna or tower at the owner's expense. If there are two or more users of a single tower, then this provision shall not become effective for the tower until all users cease using the tower. Within 30 days of the owner's receipt of said notice of abandonment, any owner aggrieved by said notice of abandonment may file a written request to be heard before the governing authority.

In addition, prior to the issuance of any tower construction permit, the applicant shall submit security for the costs of removal of the structure in an amount estimated by the applicant and approved by the Glascock County Board of Commissioners as sufficient to cover the costs of removal. Such security may be in the form of:

a. An 18-month security bond from a surety bonding company authorized to do business in the State of Georgia, payable to the Glascock County Board of Commissioners; the security bond shall be renewed at the time the annual operating permit is renewed in an amount sufficient to cover the costs of removal at the time of renewal. Such renewal bond must be approved by the Glascock County Board of Commissioners.

b. A deposit of cash with the Glascock County Board of Commissioners or an escrow of any other instrument readily convertible to cash at face value with a financial institutional; and in case of an escrow account, the bank with which the funds are deposited, being subject to the approval of the Glascock County Board of Commissioners. In the case of an escrow account, the applicant shall file with the Glascock County Board of Commissioners an agreement between the financial institution and the applicant specifying the funds that are in the escrow account shall be held in trust until released by the Glascock County Board of Commissioners and may not be used or pledged by the applicant as security in any other matter during that period and that, in the case of the applicant's failure to remove the tower and antennas in accordance with the terms set forth above, then the bank shall immediately make the funds available to the Glascock County Board of Commissioners for use of completion of the removal of the structure.

Said deposit of cash shall be kept current to cover the actual costs of removal.

c. A letter of credit from a financial institution in a form approved by the Glascock County Board of Commissioners providing that the financial institution does guarantee funds in an amount equal to the aforementioned cost of removal and that in the event the applicant fails to remove the structure in accordance with the terms set forth above, the financial institution shall pay to the Glascock County Board of Commissioners immediately and without further action, such funds as necessary to finance the removal of the structure up to the amount specified in the letter of credit. Such amount shall be kept current to cover the actual costs of removal.

(4) Setbacks and separation. The following setbacks and separation requirements shall apply to all towers:

a. Freestanding towers must be set back a distance equal to the total height of the tower from adjacent property lines, as measured radially from the base of tower to the property line of the subject property; and the design must be able to fully collapse upon itself.

b. Freestanding towers must also be set back from all single- and two-family residences, a distance of the total height of the tower in all directions, as measured radially from the base of the tower to the district boundaries or landmark boundaries.

c. Guy wires and accessory facilities associated with towers must satisfy the minimum setback requirements for buildings.

d. All lattice or guy-wired towers constructed after the effective date of this chapter shall conform to the following minimum tower separation requirements as set out in chart form below. Antennas mounted on rooftops, monopole towers, or alternative tower structures shall be exempt from these minimum separation distances as set out in chart form below. Monopole towers shall be separated from any other tower at least a distance equal to 1,200 feet in all directions. All freestanding towers which are alternative in design (stealth design) shall be separated from any other towers a minimum distance of the height of the tallest tower to which it is adjacent.

Lattice or GuyWired Tower Height Next Closest Tower Height 50 Feet Separation Next Closest Tower Height 50—100 Feet Separation Next Closest Tower Height 101—150 Feet Separation Next Closest Tower Height 150 Feet Separation 50' 300' 500' 750' 1,000' 50—100' 500' 750' 1,000' 1,500' 101—150' 750' 1,000' 1,500' 2,000' 150'+ 1,000' 1,500' 2,000' 2,500'

(5) Tower color. The color of the tower shall be either painted gray or left in its natural gray metallic state unless otherwise required by the Federal Aviation Administration.

(6) Insurance. Commercial general liability insurance shall be required with combined single limits of liability coverage of $1,000,000.00 per occurrence, for bodily injury and property damages, with respect to the construction, use of the property, maintenance, operation, or other liabilities associated with a telecommunication tower.

(7) Federal and state requirements. All towers and antennas must meet or exceed current standards and regulations of the Federal Aviation Administration, the Federal Communications Commission, and any other agency of the federal government or state government with the authority to regulate towers and antennas. If such standards and regulations are changed, then the owner of the towers and antennas governed by this chapter shall bring such towers and antennas into compliance with such revised standards and regulations within the compliance schedule mandated by the controlling federal or state agency. Failure to bring towers and antennas into compliance with such revised standards and regulations shall constitute grounds for removal of the tower or antenna by the owner or by the local governing authority at the owner's expense. Any such removal by the governing authority shall be in the manner provided above.

(8) Building codes and safety standards. To insure the structural integrity of towers, the owner of a tower shall ensure that it is maintained in compliance with standards contained in applicable local building codes and the applicable standards for towers that are published by the latest edition of the Electronic Industries Association, as amended from time to time. A professional engineer shall certify that all antennas, towers, and wireless telecommunications equipment are erected and installed so as to comply with said codes and standards. The tower design must be able to fully collapse upon itself.

(9) Security fence. All towers shall have a security fence of not less than six feet in height with anti-climbing devices on the fence. A sign no larger than 32 square feet in size shall be placed on the security fence or other outermost structural element of the telecommunication facility; which sign shall state the name and telephone number of a person responsible for the safety and maintenance of said facility and emergency contact numbers. No other signs, symbols, or advertisements shall be allowed on the security fence or on any monopole, tower, or antenna.

(10) Noise. The intensity level of sound from the wireless telecommunications facility including temporary generators used during power outages, measured at the property line of abutting property zoned for residential use shall not at any time exceed 70 decibels from 7:00 a.m. to 10:00 p.m. and 55 decibels from 10:00 p.m. to 7:00 a.m.; and abutting property zoned for nonresidential use the same shall not exceed 80 decibels at any time.

(11) Maintenance of telecommunications facilities. Towers must be properly and routinely maintained in good and safe condition and in a manner that complies with all included in submittal information. The owner shall provide the Glascock County Board of Commissioners with a certified copy of the engineer's inspection report, which includes, but is not limited to, the condition of the grounding system, the structural integrity of the facility, any damage incurred over the past year, the condition of the bolts, and a plan to correct any deficiencies. Tower owners shall conduct periodic inspections of communications towers as follows: Guyed tower at least once every two years; lattice or self-supported towers every three years; and monopoles every three to five years to insure structural integrity. Inspections shall be conducted by a structural engineer licensed to practice in Georgia. The results of such inspection shall be provided to the Glascock County Board of Commissioners. If, upon inspection, the Glascock County Board of Commissioners concludes that a tower fails to comply with such codes and standards and constitutes a danger to persons or property, then upon notice being provided to the owner of the tower, the owner shall have 30 days from the date of the mailing of such notice, to bring such tower into compliance within said 30 days, or the owner may submit an alternate schedule for approval within 30 days of notice. There is no guarantee an alternate schedule will be approved. The governing authority may remove such tower at the owner's expense, if the deadline is not met. Any such removal by the governing authority shall be in the manner provided.

(12) Fire prevention. All telecommunication facilities shall be designed and operated in such a manner so as to minimize the risk of igniting a fire or intensifying one that otherwise occurs. To this end all of the following measures shall be implemented for all telecommunications facilities when determined necessary by the state fire marshal. Demonstration of compliance with requirements subsections a. through f. shall be evidenced by a certificate signed by the state fire marshal on the building plans submitted.

a. At least one-hour, fire-resistant interior surfaces shall be used in the construction of all buildings;

b. Monitored automatic fire extinguishing systems approved by the state fire marshal shall be installed in all equipment buildings and enclosures;

c. Rapid entry (KNOX) systems shall be installed as required by the state fire marshal;

d. Type and location of vegetation and other materials within ten feet of the facility and all new structures, including telecommunication towers, shall have review for fire safety purposes by the state fire marshal. Requirements established by the state fire marshal shall be followed;

e. The access road must be designed for emergency services vehicles to reach the site and turn around;

f. All tree trimmings and trash generated by construction of the facility shall be removed from the property and properly disposed of prior to building permit finalization or commencement of operation, whichever comes first.

(13) Co-location. Each telecommunications tower application shall be required by affidavit of the applicant to make a good faith effort to substantially demonstrate that no existing or planned towers within the applicant's search ring can accommodate the applicant's proposed antenna/transmitter as described below:

a. The applicant shall contact the owners of all existing or planned towers within the applicant's search ring of a height roughly equal to or greater than the height necessary to accommodate the applicant's antenna. Such contact shall be by certified mail/return receipt requested. The applicant shall provide a list of all owners contacted, the date of such contact, the form and content of such contact, and a copy of the return receipt of the certified mail.

b. The applicant shall request the following information from each owner contacted:

1. Identification of the site by location, tax map and parcel number, existing uses on or adjacent to the site, and tower height;

2. Whether each such tower could structurally accommodate the antenna proposed by the applicant without requiring structural changes be made to the tower. To enable the owner to respond, the applicant shall provide each such owner with the height, length, weight, and other relevant data about the proposed antenna;

3. Whether each such tower could structurally accommodate the proposed antenna if structural changes were made, not including totally rebuilding the tower. If so, the owner shall specify in general terms what structural changes would be required;

4. If structurally able, would share use on such existing tower be precluded for reasons related to RF interference. If so, the owner shall describe in general terms what changes in either the existing tower or antenna(s) or the proposed antenna would be required to accommodate the proposed antenna, if at all;

5. If shared use is possible, the fee an owner of an existing tower would charge for such shared use;

6. Co-location on an existing tower will only require a building permit, as the tower would have already obtained a conditional use.

c. Such request shall be made at least one month prior to the filing of an application for a building permit or conditional use. Responses to such request shall also be included.

1. Failure of a listed owner to respond shall not be relevant if a timely, good faith effort was made to obtain one. However, where an existing or planned tower is known to have capacity for additional antennas of the sort proposed, that application for a new tower shall not be complete until the response of such owner is filed, or in the case of a failure to respond, proof of the applicant's attempted contact with the correct owner to the correct address by certified mail/return receipt requested is filed by the applicant, or by way of a propagation study which shows the tower is technically flawed for the required coverage.

2. The governing authority shall maintain and provide, on request, records of responses from each owner.

3. Once an owner demonstrates an antenna of the sort proposed by the application cannot be accommodated on the owner's tower, the owner need not be contacted by future applicants for antennas of the sort proposed.

d. The governing authority may consider expert testimony to determine whether the fee for shared use and the costs to adapt the existing and proposed uses to a shared tower are reasonable. Costs exceeding new tower development are presumed unreasonable. Shared use is not precluded simply based on fee and cost structures, unless found to be unreasonable by the local governing authority.

e. If the owner of an approved or pre-existing tower refuses to allow co-location, an affidavit shall be required that states the reason for the refusal. An unsubstantiated refusal by the owner of a tower to allow for co-location not supported by the required engineering evidence shall be a reason for the governing authority to refuse to renew the annual operating permit of said approved or pre-existing tower. It is understood that pricing is propriety and therefore can and will be considered a valid reason. Generally however, the only other reasons for revoking a tower permit would be for continued noncompliance of health, safety, and general welfare issues, relating to tower maintenance. In addition, evidence submitted by the applicant based on a report by a certified engineer to demonstrate that no existing tower or structure can accommodate the applicant's proposed antenna shall be required and shall consist of the following:

1. No existing towers or structures are located within the geographic area required to meet the applicant's engineering requirements;

2. Existing towers or structures are not of sufficient height to meet the applicant's engineering requirements;

3. Existing towers or structures do not have sufficient structural strength to support the applicant's proposed antenna and related equipment;

4. The applicant's proposed antenna would cause electromagnetic interference with the antenna on the existing towers or structures, or the antenna on the existing towers or structures would cause interference with the applicant's proposed antenna;

5. The fees, costs, or contractual provisions required by the owner in order to share an existing tower or structure are in excess of the cost of new tower development and location to the extent that co-location would impose a significant financial burden on the applicant;

6. The applicant demonstrates there are other limiting factors that render existing towers or structures unsuitable.

7. If co-location on an existing tower or structure is not possible as set forth above, and a new tower is deemed appropriate, then the new tower must be constructed to allow co-location of antennas and the applicant must agree to accommodate the co-location of other antennas on the new tower, according to the following: For towers up to 100 feet in height, the tower and fenced compound shall be designed to accommodate at least two users; for towers up to 125 feet in total height, the tower and fenced compound shall be designed to accommodate at least three users; and for towers more than 125 feet in height, the tower and fenced compound shall be designed to accommodate at least four users, unless the proposed tower is an alternative tower structure or stealth design.

(14) Any new antenna/provider shall ensure there will be no interference to other providers or customers in the area. If such occurs this may result in an immediate rescission of the permit and service may be required to be terminated immediately.

(15) The county shall be afforded the vertical real estate opportunity to place public safety radio equipment on the tower and the necessary ground real estate for all applicable supporting infrastructure at no charge (except for reinforcing the existing tower design).

History

The history line the source prints at the end of the section.

(Ord. No. 2019-01, § 2, 6-4-2019)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:glascock-county/code/10-5@2022-02-01-107bdb752b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.