--- title: Glascock County Code of Ordinances, Sec. 14-23. Application; permit process collection: local-codes id: local-code:glascock-county/code/14-23 cite_as: Glascock County, Ga., Code of Ordinances § 14-23 canonical_url: https://georgiacommons.org/counties/glascock/code/14-23 md_url: https://georgiacommons.org/counties/glascock/code/14-23.md text_url: https://georgiacommons.org/counties/glascock/code/14-23/text source_url: https://library.municode.com/ga/glascock_county/codes/code_of_ordinances date: 2022-02-01 status: active jurisdiction: county:glascock jurisdiction_name: Glascock County county_fips: "13125" corpus_version: local-codes-glascock-county-7e957248d37f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/glascock/code/~part-ii/~chapter-14/~article-ii.md previous: https://georgiacommons.org/counties/glascock/code/14-22.md next: https://georgiacommons.org/counties/glascock/code/14-24.md index: https://georgiacommons.org/counties/glascock.md branch: code edition: As published by Municode, current through 2022-02-01 edition_date_kind: current_through source_publisher: Municode version_id: local-code:glascock-county/code/14-23@2022-02-01-970a71107f --- # Glascock County Code of Ordinances, Sec. 14-23. Application; permit process > As published by Municode, current through 2022-02-01 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - COUNTY CODE / Chapter 14 - ENVIRONMENT / Article II - SOIL EROSION AND SEDIMENTATION CONTROL (a) General. The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the issuing authority that affect the tract to be developed and the area surrounding it. They shall review the zoning ordinance, stormwater management ordinance, subdivision ordinance, flood damage prevention ordinance, this article, and other ordinances which regulate the development of land within the jurisdictional boundaries of the issuing authority. However, the property owner is the only party who may obtain a permit. (b) Application requirements. (1) No person shall conduct any land disturbing activity within the jurisdictional boundaries of the county without first obtaining a permit from the county tax assessor's office to perform such activity. (2) The application for a permit shall be submitted to the county tax assessor's office and must include the applicant's erosion and sedimentation control plan with supporting data, as necessary. Said plan shall include, as a minimum, the data specified in subsection (c) of this section. Soil erosion and sedimentation control plans shall conform to the provisions of section 14-22(b) and (c). Applications for a permit will not be accepted unless accompanied by two copies of the applicant's soil erosion and sedimentation control plans. (3) A fee in amount of $10.00 shall be charged for each acre or fraction thereof in the project area. (4) Immediately upon receipt of an application and plan for a permit, the issuing authority shall refer the application and plan to the district for its review and approval or disapproval concerning the adequacy of the erosion and sedimentation control plan. The results of the district review shall be forwarded to the issuing authority. No permit will be issued unless the plan has been approved by the district, and any variances required by sections 14-22(c)(15) and (16), and bonding, if required as per subsection (b)(5)b of this section, have been obtained. Such review will not be required if the issuing authority and the district have entered into an agreement which allows the issuing authority to conduct such review and approval of the plan without referring the application and plan to the district. (5) Approval or disapproval. a. If a permit applicant has had two or more violations of previous permits, this article, this section, or the Erosion and Sedimentation Act, as amended, within three years prior to the date of filing of the application under consideration, the issuing authority may deny the permit application. b. The issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land disturbing activity, prior to issuing the permit. If the applicant does not comply with this article or with the conditions of the permit after issuance, the issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land disturbing action and bring it into compliance. These provisions shall not apply unless there is in effect an ordinance or statute specifically providing for hearing and judicial review of any determination or order of the issuing authority with respect to alleged permit violations. (c) Plan requirements. (1) Design criteria. Plans must be prepared to meet the minimum requirements as contained in section 14-22(b) and (c). Conformance with the minimum requirements may be attained through the use of design criteria in the current issue of the Manual for Erosion and Sediment Control in Georgia published by the state soil and water conversation commission as a guide, or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is hereby incorporated by reference into this article. The plan for the land disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including waterways, sediment control and stormwater management facilities, local ordinances and state laws. (2) Data required for site plan. a. Narrative or notes. Notes or narrative to be located on the site plan in general notes or in erosion and sediment control notes. b. Description of project. A description of the existing land use at the project site and a description of the proposed project. c. Property owner information. The name, address, and telephone number of the property owner. d. Erosion and sedimentation control contact. The name and telephone number of a 24-hour local contact who is responsible for erosion and sedimentation control. e. Size of project. The size of the project or the phase under construction, in acres. f. Project schedule. An activity schedule showing the anticipated starting and completion dates for the project. Include the statement, in bold letters, that "The installation of erosion and sedimentation control measures and practices shall occur prior to or concurrent with land disturbing activities." g. Stormwater/sedimentation management systems. Stormwater and sedimentation management systems storage capacity, hydrologic study, and calculations, including off-site drainage areas. h. Protective vegetation measures. A vegetation plan for all temporary and permanent vegetative measures, including species, planting dates, and seeding, fertilizer, lime, and mulching rates. The vegetative plan should show options for year-round seeding. i. Project schematics. A detailed drawing for all structural practices. Specifications may follow guidelines set forth in the Manual for Erosion and Sediment Control in Georgia. j. Maintenance statement. Include the statement, "Erosion and sedimentation control measures will be maintained at all times. Additional erosion and sedimentation control measures and practices will be installed if deemed necessary by on-site inspection." (3) Supporting documents. Maps, drawings, and supportive computations shall bear the signature/seal of a registered or certified professional in engineering, architecture, landscape architecture, land surveying, or erosion and sedimentation control. The certified plans shall contain: a. Graphic scale and north point or arrow indicating magnetic north. b. Vicinity map showing the location of the project and existing streets. c. Boundary line survey. d. Delineation of disturbed areas within the project boundary. e. Existing and planned contours, with an interval in accordance with the following: Map Scale Ground Slope Contour Interval (in feet) 1 inch = 100 feet or larger scale Flat: 0—2% 0.5 or 1 Rolling: 2—8% 1 or 2 Steep: 8%+ 2, 5, or 10 f. Adjacent areas and feature areas such as streams, lakes, and residential areas, etc., which might be affected should be indicated on the plan. g. Proposed structures or additions to existing structures and paved areas. h. Delineate the 25-foot horizontal buffer adjacent to state waters and the specified width in Metropolitan River Protection Act areas. i. Delineate the specified horizontal buffer along designated trout streams, where applicable. j. Location of erosion and sedimentation control measures and practices using coding symbols from the Manual for Erosion and Sediment Control in Georgia, chapter 6. (4) Responsibility for maintenance. Maintenance of all soil erosion and sedimentation control practices, whether temporary or permanent, shall be at all times the responsibility of the property owner. (d) Permits. (1) Permits shall be issued or denied as soon as practicable, but in any event, not later than 45 days after receipt by the issuing authority of a completed application, providing variances and bonding are obtained, where necessary. (2) No permit shall be issued by the issuing authority unless the erosion and sedimentation control plan has been approved by the district and the issuing authority has affirmatively determined that the plan is in compliance with this article, any variances required by subsections 14-22(c)(15) and (16) are obtained, bonding requirements, if necessary, as per subsection (b)(5)b of this section, are met and all ordinances and rules and regulations in effect within the jurisdictional boundaries of the issuing authority are met. If the permit is denied, the reason for denial shall be furnished to the applicant. (3) If the tract is to be developed in phases, then a separate permit shall be required for each phase. (4) The permit may be suspended, revoked, or modified by the issuing authority, as to all or any portion of the land affected by the plan, upon finding that the holder or the holder's successor in title is not in compliance with the approved erosion and sedimentation control plan or that the holder or the holder's successor in title is in violation of this article. A holder of a permit shall notify any successor in title to the holder of the permit as to all or any portion of the land affected by the approved plan of the conditions contained in the permit. (5) No permit shall be issued unless the applicant provides a statement by the tax commissioner's office certifying that all the ad valorem taxes levied against the property and due and owing have been paid. ## History (Ord. of 4-1-1997, § V)