Skip to content
Georgia Commons
Menu

Glascock County · Code of Ordinances

Part II - COUNTY CODE / Chapter 18 - MANUFACTURED HOMES AND TRAILERS / Article II - LOCATION OR RELOCATION / Division 3 - PERMITS AND APPROVALS

Sec. 18-75. Site; conditions for turning on electricity.

About this text

  • As published by Municode, current through 2022-02-01
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) All manufactured homes must be located on an approved site.

(b) Permission to turn on the electricity to the manufactured home shall not be granted until the following conditions have been met in accordance with established administrative procedures:

(1) Tax decal. A valid location decal must be obtained from the tax commissioner's office and attached to the manufactured home. Decals must be renewed annually.

(2) Septic tank permit. A septic tank permit for wastewater hook-up for the site must be obtained from the county health department (not applicable for units being used for storage purposes only).

(3) Moving permit. Once subsections (b)(1) and (2) of this section and section 18-41 have been met, the applicant must obtain a moving permit pursuant to section 18-76. The moving permit must be attached to the manufactured home before it is moved into or within the county and installed.

(4) Street address. Additionally, the street address must be posted on the house where it is clearly visible from the street or clearly visible at the entrance to the house for 911 emergencies (not applicable for units being used for storage purposes only).

(5) Temporary power for completion of installation. The county's designated building inspector or designee is authorized to permit the applicable power company to provide temporary power not to exceed 120 volts for the express purpose of completing necessary construction and installation for the manufactured home. This provision does not authorize permanent power hook-up or occupancy of the manufactured home. It shall be unlawful for temporary power to be utilized on a permanent basis or for occupancy of said manufactured home.

(6) Time allowed for completion. Time limit compliance is three months for completing set-up, including skirting/underpinning.

(7) Variances. Variances are to be brought before the board of commissioners for consideration.

(8) Not applicable to recreational vehicles. The requirements of this section do not apply to recreational vehicles because they are not acceptable for permanent occupancy and may only be used for a maximum of 28 consecutive days, or 60 calendar days, in any given year as a temporary residence, unless located in an approved recreation vehicle park. All recreational vehicles must display a current state license before movement. A moving permit will not be issued for recreational vehicles.

(9) Final inspection; re-inspection. The county's designated building inspector or designee shall conduct a final inspection of the site and shall grant permission to have the electricity turned on if the site is appropriate. If the final inspection is not approved, then there shall be an additional fee of $50.00 for a re-inspection.

(10) Connection of permanent power. It shall be unlawful for permanent power to be connected without final approval by the county's designated building inspector or designee.

History

The history line the source prints at the end of the section.

(Res. of 8-6-2002; Ord. No. 2017-03, § 10-45, 12-5-2017)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:glascock-county/code/18-75@2022-02-01-0058841c6c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.