--- title: Gordon County Code of Ordinances, Sec. 14-40. Fire, safety and accessibility fees collection: local-codes id: local-code:gordon-county/code/14-40 cite_as: Gordon County, Ga., Code of Ordinances § 14-40 canonical_url: https://georgiacommons.org/counties/gordon/code/14-40 md_url: https://georgiacommons.org/counties/gordon/code/14-40.md text_url: https://georgiacommons.org/counties/gordon/code/14-40/text source_url: https://library.municode.com/ga/gordon_county/codes/code_of_ordinances date: 2025-08-05 status: active jurisdiction: county:gordon jurisdiction_name: Gordon County county_fips: "13129" corpus_version: local-codes-gordon-county-1c9bbdb767b1 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/gordon/code/~chapter-14/~article-iii.md previous: https://georgiacommons.org/counties/gordon/code/14-39.md next: https://georgiacommons.org/counties/gordon/code/14-41.md index: https://georgiacommons.org/counties/gordon.md branch: code edition: As published by Municode, current through 2025-08-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:gordon-county/code/14-40@2025-08-05-25f1751d80 --- # Gordon County Code of Ordinances, Sec. 14-40. Fire, safety and accessibility fees > As published by Municode, current through 2025-08-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 14 / Article III - FIRE PREVENTION (a) Fire department plan review—Construction, expansion permit fee. There shall be a permit fee for the construction or for the expansion of every building in the county. Permits required by this Code shall be obtained from the fire code official. Permit fees shall be paid prior to issuance of the permit. Issued permits shall be kept on the premises designed therein at all times and shall be readily available for inspection by the fire code official. Said permit fees shall be calculated at a rate prescribed by the board of commissioners. Eighty (80) percent or cover up inspection, one hundred (100) percent or final inspection, and first follow-up inspection will be allowed under the construction permit with no additional charge. Sprinkler system and alarm system permit fee. There shall be a permit fee for a sprinkler system or alarm system being installed in buildings in the county, and said permit fee shall be calculated at a rate prescribed by the board of commissioners. (b) Minimum fees. The minimum fees at a rate as prescribed by the board of commissioners shall be charged for the specific permits and services listed: (1) Commercial construction fire prevention permit. (2) Religious / private education construction fire prevention permit. (3) Site plan review. (4) Second follow-up inspection. (5) All other follow-up inspections. (6) Tent permit. (7) NFPA 96 hood vent plan review and inspection. (8) Sprinkler system plan review up to fifteen thousand (15,000) square feet. (9) Sprinkler system plan review over fifteen thousand (15,000) square feet. (10) Alarm system plan review up to fifteen thousand (15,000) square feet. (11) Alarm system plan review over fifteen thousand (15,000) square feet. (12) New tenant inspection (business license). (13) Tenant remodel or minor alterations plan review. (14) Above ground fuel tank site plan review. (15) Consumer fireworks retail sales stand. (16) IFC 510 ERRC permit. (c) Inspection fees. There will be no charge for annual inspections. There will be no charge for the first follow-up inspection. Reinspection fees will automatically be assessed on all second and third reinspections. (1) If during a reinspection, a code violation is noted that was not listed as part of the original violation(s), a reinspection fee will not be assessed for the newly cited code violation(s). Any newly cited code violation discovered at the time of reinspection will be considered a first-time violation and will restart the reinspection fee process. (2) Reinspection fees shall apply to all project plans which are re-submitted prior to addressing all red-line comments made by the fire code official or designee. (3) Project plans submitted with multiple revisions will be assessed a new fire department plan review fee. A complete updated set of plans shall be submitted for fire department review upon the request of the fire code official or designee. ## History (Ord. of 2-20-24(1))