(a) Permit application. (1) When required. Any owner, authorized agent or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the technical codes, or to cause any such work to be done, shall first make application to the building inspection department and obtain the required permit for the work. Accessory buildings which are ten (10) feet by twelve (12) feet or less do not require a building permit. HOWEVER, any accessory building which requires a branch circuit panel board and/or a utility service shall be required to have a building permit. Accessory buildings which do not require a building permit are still required to meet all setback requirements as defined in the county zoning ordinance, codified herein as