--- title: Grady County Code of Ordinances, Sec. 16-30. Education and certification collection: local-codes id: local-code:grady-county/code/16-30 cite_as: Grady County, Ga., Code of Ordinances § 16-30 canonical_url: https://georgiacommons.org/counties/grady/code/16-30 md_url: https://georgiacommons.org/counties/grady/code/16-30.md text_url: https://georgiacommons.org/counties/grady/code/16-30/text source_url: https://library.municode.com/ga/grady_county/codes/code_of_ordinances date: 2025-02-18 status: active jurisdiction: county:grady jurisdiction_name: Grady County county_fips: "13131" corpus_version: local-codes-grady-county-78dc33f4a8d8 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/grady/code/~part-ii/~chapter-16/~article-ii.md previous: https://georgiacommons.org/counties/grady/code/16-29.md next: https://georgiacommons.org/counties/grady/code/16-31.md index: https://georgiacommons.org/counties/grady.md branch: code edition: As published by Municode, current through 2025-02-18 edition_date_kind: current_through source_publisher: Municode version_id: local-code:grady-county/code/16-30@2025-02-18-9c76375727 --- # Grady County Code of Ordinances, Sec. 16-30. Education and certification > As published by Municode, current through 2025-02-18 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 16 - ENVIRONMENT / Article II - SOIL EROSION SEDIMENTATION AND POLLUTION CONTROL (a) Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20. (b) For each site on which land disturbing activity occurs, each entity or person acting as either a primary, secondary or tertiary permittee, as defined in the state general permit, shall have, as a minimum, one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the commission present on-site whenever land disturbing activities are conducted on that site. The term "project site" means any land disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit. (c) Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this section. (d) If a state general permittee who has operational control of land disturbing activities for a site has met the certification requirements of O.C.G.A. § 12-7-19(b)(1), then any person or entity involved in land disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A. § 12-7-19(b)(4) and shall not be required to meet any education requirements that exceed those specified in said section. ## History (Ord. of 12-7-2010, § 2(26-38))