Grady County · Code of Ordinances
Part IX - OPERATIONAL PERMITS AND MAINTENANCE REQUIREMENTS FOR ADVANCED TREATMENT SYSTEMS
9.01. OPERATING PERMIT REQUIREMENTS.
About this text
- As published by Municode, current through 2025-02-18
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
a. An annual operating permit shall be required for advanced treatment systems and all components thereof, and no person may operate an advanced treatment system without an annual operating permit. A fee may be charged for the issuance of such permit, such fee to be established by the Grady County Board of Health as provided in O.C.G.A. Title 31-3-4(6).
b. After meeting all requirements of the construction permit and after a satisfactory construction inspection, the owner/applicant shall submit within 30 days of such inspection, the following information to the County Board of Health:
i. A copy of the applicable manufacturer's warranty and service agreement.
ii. Proof of a recorded notification of the existence of and the maintenance requirements for an advanced treatment system, filed with the deed of the property in the county office of deed records.
iii. Any other documentation as reasonably required by the County Board of Health to ensure the health, safety and welfare of the public.
c. Upon receipt of the above information, the County Board of Health shall issue an operating permit.
d. Renewal of the operating permit shall be required on the anniversary of the issuance of said permit or on a calendar year basis.
e. The Grady County Board of Health shall annually renew the operating permit after the County Health Department establishes that the system is in full compliance with applicable rules.
f. The system owner shall be responsible for compliance with all maintenance requirements as described in the Manual, which is incorporated herewith in pertinent part. Proof of compliance shall be provided to the County Health Department prior to the renewal date.
g. Current owners of pre-existing advanced treatment systems shall be required to obtain an operating permit within twelve (12) months of the effective date of these rules.
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.