Habersham County · Code of Ordinances
Habersham County Code of Ordinances
This document is shown whole, as one text: its source does not cut it into sections.
About this text
- As published by Municode, current through 2025-12-15
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Part 7 of 8. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.
(7) Construction signs not exceeding five feet in height and 32 square feet in aggregate sign area with a limit of one sign per site. The sign may only be erected after a building permit has been issued for the site. The sign may only be used to identify the name of the project, architects, engineers, contractors and other individuals or firms involved with the construction but not including any advertisement of any project. In single-family residential areas or developments, the maximum size is six square feet and must be removed no later than seven days after issuance of an occupancy permit by the county (and in no case more than one year).
(c) Future use signs are permitted in all districts and shall be used to announce a future use of a now vacant parcel of land. These signs can be no more than five feet in height, no more than 32 square feet in sign area, and shall be limited to one sign for each parcel of land. Future use signs may remain erected for a maximum of one year subject to review by the administrative officer and must be replaced immediately by a construction sign once a building permit has been issued.
(Ord. of 12-21-2020) Sec. 68-921. Illumination.
Illumination for signs shall not cast light on adjoining property or shine in such a manner as to cause traffic interference.
(Ord. of 12-21-2020) Sec. 68-922. Enforcement and penalties.
(a) All signs shall be maintained in good condition as to present a neat and orderly appearance. The county may, after due notice, issue a citation to any permittee for any sign which shows gross neglect or becomes dilapidated.
Such due notice shall be in writing, shall specify the sign and location, and shall state that the sign has not been properly maintained. The county shall give the permittee ten days to rectify the condition or remove the dilapidated sign before issuing a citation.
(b) The county may issue a citation for violation of this article by any sign erected, altered, converted or used in violation of this article.
(c) Any person violating any provision of this article shall be guilty of an offense and, upon conviction, shall be fined not less than $100.00 and not more than $500.00 for each offense. Each day shall constitute a separate offense.
(Ord. of 12-21-2020) Secs. 68-923—68-1000. Reserved.
ARTICLE X. BUFFER, LANDSCAPE, SCREENING, AND OPEN
SPACE REQUIREMENTS
Sec. 68-1001. Purpose and intent.
The following regulations are designed to promote the health, safety, order, aesthetics and general welfare by protecting against incompatible uses of land, providing for a more attractive urban environment, assuring adequate open space and reducing noise, night lighting, glare, odor, objectionable views, loss of privacy and other adverse impacts and nuisances through the use of buffers and landscaping. This article is also designed to encourage the protection and planting of trees, which are declared to be beneficial public resources, and to prevent the needless, wasteful or purposeless destruction of trees in order to better control problems of flooding, soil erosion and air pollution.
(Ord. of 12-21-2020) Sec. 68-1002. Buffer required.
A planted buffer, as defined by this chapter, shall be provided along any rear or side property line of adjacent properties, not separated by road or railroad right-of-way, containing residential and commercial/industrial uses or in other cases as required by this article, provided that no buffer shall extend within 15 feet of a public right-of-way line. Minimum buffer widths shall be established in accordance with the following schedule:
(a) When a commercial or industrial use in a MI-C or HI district abuts a residential use regardless of ownership, a setback of 50 feet shall be provided including a 25-foot buffer.
(b) When a commercial use in a LI-C District abuts a residential district, regardless of ownership, a setback of 40 feet shall be provided including a 25-foot buffer.
(c) When a single-family residence, mobile/manufactured home, modular home or other dwelling is to be built abutting an AG district, a setback of 50 feet shall be provided. When a residential subdivision, preliminarily or final platted after the date of adoption of these regulations is to be built abutting an existing building or structure used to house poultry or commercial livestock on any abutting property, a setback of 100 feet shall be provided including a 50-foot buffer along the entire portion of the property line abutting said building or structure used to house poultry or commercial livestock.
(d) When a building or structure used to house poultry or commercial livestock is constructed adjacent to a single-family residence, mobile/ manufactured home, modular home or other dwelling, a setback of 100 feet shall be provided including a 50-foot buffer along the entire portion of the property line abutting said dwelling, and such buffer shall also extend an additional 100 feet in each direction along said common property line to protect the yard and lot of the dwelling.
A natural buffer, as defined in this chapter, shall be required along all waterways as stipulated in article V and for erosion protection in areas of steep slope development as stipulated in section 68-607.
It shall be the responsibility of the subdivider of any property hereafter divided to designate required setbacks and buffers on preliminary and final subdivision plats.
It shall be the responsibility of the developer upon installation of utilities, streets, etc. to designate required buffers on construction plans and to ensure that existing vegetation within required buffers is maintained unless disturbance of the buffer is approved by the administrative officer as specifically provided herein.
It shall be the responsibility of the property owner of the lot to be used or built upon to maintain existing vegetation within required buffers and to replant where sparsely vegetated or install fencing, walls, etc. as approved to achieve the desired screening. Installation of vegetation, fencing, walls, etc.
may be phased in accordance with approved building plans.
(Ord. of 12-21-2020) Sec. 68-1003. Buffer specifications.
All buffers required by this chapter shall conform to the following provisions:
(a) Utilization will be made of existing vegetation where it has been determined by the administrative officer that existing vegetation is appropriate for inclusion within the buffer or, when found not appropriate, shall be supplemented with approved, additional plantings.
(b) Disturbance or modification of the natural topography of the land for property improvements or during construction and maintenance activities is to be minimized, except in the following instances that have been approved by the administrative officer.
(1) Where the land must be cleared and graded as required by the application of laws to prevent soil erosion or sedimentation;
(2) Where regulations for storm drainage improvements require alteration of the topography;
(3) Where necessary to prevent a nuisance to thin natural growth that has become so dense as to prohibit normal growth or to remove diseased, misshapen, or dangerous or decayed growth;
(4) Where access and/or utility crossings have been approved.
(c) Vegetation planted for screening, except for ground covers, shall be of such type as to be a height of not less than three feet when planted and which will, in normal growth, attain a height of six feet within three years provided, however, that such plant materials can form a hardy screen dense enough and high enough both to interrupt vision and to reduce the transmission of sound.
(d) Vegetation planted for erosion control shall meet the minimum requirements of this chapter and Chapter 26, Environment of the Code of Habersham County. Required buffers must be well established and maintained to control erosion until completion of the entire project.
(Ord. of 12-21-2020) Sec. 68-1004. Acceptable plant materials.
In those instances where the natural vegetation and topography are insufficient to achieve the desired level of screening required by this chapter, a planted buffer shall be provided and shall consist of plant material of such growth characteristics as will provide an acoustical and visual screen and/or erosion control barrier. Planted materials shall conform to the following specifications:
(a) Trees used for screening purposes should be native to the region and shall not be deciduous. Trees should be at least three feet in height above the ground when planted or which will, in normal growth, attain a height of six feet within three years.
(b) Shrubs that are used to form hedges shall not be deciduous. Shrubs shall be at least two feet above the ground level when planted. They should be spaced in such a way that, when mature, they will form a continuous visual screen (hedge) that is at least six feet in height.
(c) For purposes of erosion control, ground covers, perennial plants and shrubs shall be placed to facilitate development of a continuous root network within one year or the period of construction, whichever is the greater.
(Ord. of 12-21-2020) Sec. 68-1005. Maintenance of buffers and landscape strips.
The owner and/or user of the property shall be responsible for installing the trees, shrubs and ground covers and maintaining them in good health in a neat and orderly appearance. This includes irrigating or watering, fertilizing, pruning and replanting where necessary. In cases of noncompliance, the administrative officer shall be empowered to take action as provided by law to ensure maintenance of all plant and landscaping materials.
(Ord. of 12-21-2020) Sec. 68-1006. Administration and enforcement.
Where buffers are required, the applicant must demonstrate, whether on appropriate plans or after inspection by the administrative officer, that the plant materials in place or installed achieve the required screening and/or erosion controls. All site plans, plot plans and grading and drainage plans shall indicate all required buffers and landscape strips.
Required buffers, landscape strips and parking lot landscaping shall be installed in accordance with approved plans prior to the issuance of a certificate of occupancy. Certificates of occupancy may be withheld if, after inspection, the required buffers and landscape strips have not been installed in accordance with approved plans. However, owing to special conditions or exceptional circumstance such as drought, said buffers and landscape strips may be installed within 90 days after the issuance of a certificate of occupancy provided that a letter of credit, escrow money, performance bond or other approved alternative is submitted to the administrative officer prior to the issuance of a certificate of occupancy.
(Ord. of 12-21-2020) Sec. 68-1007. Exception to buffer, landscape, screening, and open space requirements.
The single exception to the buffer, landscape, screening and open space requirements is public and semi-public buildings and uses to house communication equipment, pumps, security or similar such uses, as determined by the administrative officer, located on small parcels that could not normally meet the buffer, landscape, screening and open space requirements in sections 68-1002, 68-1003, 68-1004, 68-1005, and 68-1006.
(Ord. of 12-21-2020) Secs. 68-1008—68-1100. Reserved.
ARTICLE XI. PLANNING COMMISSION
Sec. 68-1101. Existence continued.
The planning commission for Habersham County as it exists on the effective date of this chapter shall continue.
(Ord. of 12-21-2020) Sec. 68-1102. Meetings and records.
The planning commission shall meet one time each month and determine its time of meeting; provided, however, that this provision shall not be construed as requiring the planning commission to meet when it has no regular business to transact. All such meetings shall be open to the public.
The planning commission shall adopt rules for the transaction of business or, in lieu of such rules, the commission shall follow "Robert's Rules of Order," latest edition. The planning commission shall keep record of its resolutions, recommendations, transactions, findings, and determinations and all such records shall be public record and available for purchase by interested parties at a reasonable cost.
(Ord. of 12-21-2020) Sec. 68-1103. Powers and duties.
In addition to any other powers enumerated in this chapter and any other resolution approved by the Habersham County Commission, the planning commission shall have the following functions, powers and duties:
(a) Prepare and recommend for adoption by the governing body land development regulations and official land use district map, subdivision regulations, and other such land use regulations; prepare and recommend for adoption by the governing body amendments to any of the land use regulations; and to review and make recommendations concerning applications for land use district map amendment and conditional use permits.
(b) Review, approve and/or deny applications for preliminary plats, final plats and variances to the regulations of this chapter.
(c) To hear and decide appeals where it is alleged there is error in any order, requirement, decision, or determination made by the administrative officer, or other administrative officer, in the enforcement of this chapter. An appeal of an administrative decision stays all legal proceedings in furtherance of the action appealed from, unless the administrative officer or other administrative officer from whom the appeal is made certifies to the planning commission, after the notice of appeal shall have been filed, that by reason of facts stated in the certificate a stay would cause imminent peril to life or property. In such case, proceedings shall not be stayed otherwise than by a restraining order which must be granted by a court of competent jurisdiction.
(d) Perform other planning functions and duties as may be required by the governing body.
(Ord. of 12-21-2020) Secs. 68-1104—68-1200. Reserved.
ARTICLE XII. APPEALS AND VARIANCES
Sec. 68-1201. Appeals.
Application, hearings, and notice: Applications for appeal of any alleged error in any order, requirement, decision or determination made by the administrative officer shall be made to the planning commission. Decisions on applications for appeals shall only be made following a public hearing pursuant to notice and procedures approved by the planning commission.
Recourse from a decision of the planning commission shall be to the Habersham County Board of Commissioners by the filing of an appeal within 30 days of the planning commission decision.
Such appeal shall be taken by filing with the administrative officer the notice of appeal specifying the grounds thereof. All papers constituting the record upon which the action appealed from was taken shall forthwith be transmitted to the governing body.
The governing body shall select a reasonable time and place for the hearing of the appeal and give at least 15 days of public notice thereof and due notice to the parties in interest and shall render a decision on the appeal within a reasonable time. Such decision shall be the final decision by the county, appealable to a court of competent jurisdiction by the filing therein an appeal within 30 days of the final decision by the county.
(Ord. of 12-21-2020) Sec. 68-1202. Variances.
The planning commission is hereby empowered to authorize upon application in specific cases such variance from the terms of this chapter as will not be contrary to the public interest where, owing to special conditions, a literal enforcement of the provisions of this chapter will, in an individual case, result in unnecessary hardship so that the spirit of this chapter shall be observed, public safety and welfare secured, and substantial justice done.
The existence of a nonconforming use of neighboring land, buildings or structures in the same land use district or of permitted or nonconforming uses in other districts shall not constitute a reason for the requested variance. The planning commission is not authorized to grant a use variance;
only a variance to development standards in a district.
(a) A variance may be granted in an individual case of unnecessary hardship after appropriate application in accordance with article XII upon specific findings that all of the following conditions exist. The absence of any one of the conditions shall be grounds for dismissal of the application for variance.
(1) There are extraordinary and exceptional conditions pertaining to the particular piece of property in question because of its size, shape, or topography that are not applicable to other land or structures in the same district.
(2) A literal interpretation of the provisions of these regulations would create an unnecessary hardship and would deprive the applicant of rights commonly enjoyed by other property owners within the district in which the property is located.
(3) Granting the variance requested will not confer upon the property of the applicant any special privileges that are denied to other properties of the district in which the applicant's property is located.
(4) Relief, if granted, will be in harmony with the purpose and intent of this chapter and will not be injurious to the neighborhood or general welfare in such a manner as will interfere with or discourage the appropriate development and use of adjacent land and buildings or unreasonably affect their value.
(5) The special circumstances are not the result of the actions of the applicant.
(6) The variance requested is the minimum variance that will make possible the legal use of the land, building or structure.
(7) The variance is not a request to permit a use of land, building or structure which is not permitted by right in the district involved.
(b) Conditional approval permitted: In exercising the powers to grant appeals and approve use variances, the governing body may attach any conditions to its approval which it finds necessary to accomplish the reasonable application of the requirements of this chapter. In exercising its powers, the governing body may, in conformity with the provisions of this chapter, reverse or affirm, wholly or partly, or may modify the order, requirement, decision or determination and to that end shall have all of the powers of the administrative officer may issue or direct the issuance of a permit. The concurring vote of three members of the governing body shall be necessary to reverse any order, requirement, decision or determination of the administrative officer or County Engineer.
(c) Approval period limited: No order of the governing body permitting the erection or alteration of a building shall be valid for a period of longer than six months unless such use is established within such period;
provided, however, that such order by the governing body shall continue in force and effect if a building permit for said erection or alteration is obtained within such period and such erection or alteration is started and proceeds to completion in accordance with such permit.
(d) Application, hearing, and notice: Decisions on applications for appeals or variances shall only be made following a public hearing pursuant to notice and procedures approved by the planning commission and the governing body.
(Ord. of 12-21-2020) Sec. 68-1203. Administrative variances.
The administrative officer is hereby authorized to consider and grant or deny, pursuant to the procedures and standards contained in this section, a variance or a special exception from the following regulations:
(a) Reduce by variance any front, side or rear yard setback by an amount not to exceed ten percent of the district requirement but not including any buffer or any setback which is a condition of zoning or conditional use.
(b) Reduce by variance the off-street parking or loading requirements imposed by this chapter in an amount not to exceed ten percent of the requirement, pursuant to the standards specified in article IV.
(Ord. of 12-21-2020) Secs. 68-1204—68-1300. Reserved.
ARTICLE XIII. AMENDMENT, APPLICATION, AND PROCEDURAL
REQUIREMENTS
Sec. 68-1301. Initiation of amendments.
Applications to amend this chapter may be in the form of proposals to amend the text or proposals to amend the official land use district map.
(a) An application to amend the text of this chapter may be initiated by the planning commission or be submitted to the planning commission by the governing body or by any person having an interest in the county. An application to amend the official land use district map may be initiated by the governing body or the planning commission.
(b) Unless initiated by the governing body or the planning commission, all applications to amend the official land use district map must be submitted by the owner of the affected property or the authorized agent of the owner. If submitted by an agent of the owner, such authorization shall be notarized and attached to the application.
(c) An application for an amendment to the text of this chapter or to the official land use district map affecting the same property shall not be submitted more than once every six months, such interval to begin on the date of final decision by the governing body.
(d) An application to alter conditions of rezoning may be submitted at any time after the final decision but shall not be submitted more than once every six months, such interval to begin on the date of the final decision by the governing body on said application to amend the condition.
(e) An application may be withdrawn without prejudice at any time prior to the planning commission meeting. Withdrawal subsequent to that time shall mean such application may not be resubmitted for consideration for a period of six months, counting from the date of withdrawal to the date of renewed application. Unless withdrawn at a hearing, the withdrawal must be in writing, signed, and dated by the applicant.
(Ord. of 12-21-2020) Sec. 68-1302. Application for amendment.
Each application required by this chapter to amend this chapter or the official land use district map shall be filed with the administrative officer along with the fee as determined by the governing body. A maximum of ten applications shall be accepted by the administrative officer for consideration at any public hearing before the planning commission and/or the governing body. Applications shall be submitted in compliance with the following:
(a) Text amendment applications shall include the following:
(1) Name and current address of the applicant;
(2) Current provisions of the text to be affected by the amendment;
(3) Proposed wording of text change;
(4) Reason for the amendment request.
(b) Official land use district map amendment applications shall include the following:
(1) A tax parcel card from the Habersham County Tax Assessor identifying the parcel to be rezoned or the parent parcel of the parcel to be rezoned if a split or subdivision is occurring;
(2) A site plan is required by this article and shall, at a minimum, contain the following information:
a. Title of the proposed development and the name, address and telephone number of the property owner;
b. The name, address and telephone number of the architect, engineer or other designer of the proposed development;
c. Scale, date, north arrow and general location map showing relationship of the site to streets or natural landmarks;
d. Boundaries of the subject property, all existing and proposed streets including right-of-way and street pavement widths, buildings, water courses, parking and loading areas and other physical characteristics of the property and proposed development;
e. Building setbacks, buffers, and landscape strips.
(3) The present and proposed land use district for the tract;
(4) Existing and intermediate regional floodplain and structures;
(5) The names and addresses of the owners of the land and their agents, if any;
(6) The names and addresses of all adjoining property owners. In determining the adjoining property owners, road, street or railroad rights-of-way shall be disregarded;
(7) A letter of intent which describes general characteristics of the proposed development such as type and time frame of development, background information in support of such application and any other information deemed pertinent by the applicant;
(8) On any rezoning of three or more acres to be subdivided, a soil survey prepared by a soil scientist registered in the State of Georgia shall be submitted prior to approval, unless the property is served by sewer;
(9) Such other and additional information as may be requested by the administrative officer.
(c) An application shall be submitted at least 28 days prior to the date on which it is to be considered by the planning commission. The governing body shall establish fees for an application to amend this chapter or the official land use district map. A fee shall not be charged for applications initiated by the governing body or planning commission.
(d) With respect to amendments to the official land use district map, an applicant may file site plans, renderings, construction specifications, written development restrictions and other conditions which the applicant proposes as binding conditions upon the development and use of the property involved in the application provided, however, that such conditions or alterations or changes thereto shall be filed with the administrative officer at least seven days prior to the public hearing before the planning commission. If such conditions or alterations or changes thereto are proposed by an applicant and have not been filed as required by this paragraph, the governing body, at the time of the public hearing on the application, may defer any action on such application to a specific meeting date which will permit the planning commission to conduct another hearing to consider the applicant's proposal prior to consideration of the application by the governing body. At the hearing in which the deferral is granted, the governing body shall specify the date of the hearing before the planning commission and the subsequent hearing before the governing body and this action shall constitute public notice of such hearings and no additional notices shall be required prior to the hearings so scheduled by the governing body. The date designated for action on the application shall be set at a time which will allow the applicant to comply with the filing requirements of this paragraph.
(Ord. of 12-21-2020) Sec. 68-1303. Public notification.
(a) Legal notice: Due notice of each public hearing pursuant to this article shall be published in the newspaper of general circulation within the county at least 15 days prior to the date of each scheduled hearing of the governing body and of the planning commission but not more than 45 days prior to the date of each scheduled hearing. If the application is initiated by the governing body, the notice shall state the time, place and purpose of the public hearing. If the application for amendment to the official land use district map is initiated by anyone other than the governing body, then the notice shall also include the location of the property, the present land use district of the property and the proposed land use district of the property. The cost of the advertisement shall be borne by the applicant. The notice shall also state: "Notice is hereby given that the governing body has the power to impose a different land use classification from the classification requested and impose or delete zoning conditions that may change the application considerably."
(b) Signs posted: If the application for amendment to the Official Land Use District Map is initiated by anyone other than the governing body, the administrative officer shall post at least 15 days prior to the planning commission's public hearing, in a conspicuous place in the public right-of-way fronting the property or on the property for which an application has been submitted, a sign containing information as to the application and date, time and place of the public hearing.
(Ord. of 12-21-2020) Sec. 68-1304. Planning commission action.
The planning commission shall hold a public hearing on each application for an amendment pursuant to this article in accordance with a schedule adopted by the planning commission. As to each application, the planning commission shall make a recommendation for approval, approval with conditions or denial. A tie vote on any motion shall equate to denial. The planning commission may also table the application one time for the presentation of more information.
(a) A written report of the planning commission's recommendation shall be submitted to the administrative officer, or designee, and shall be a public record. The planning commission's action may recommend amendments to the applicant's request which would reduce the land area for which the application is made, change the district requested and recommend conditions of rezoning which may be deemed advisable so that the purpose of this chapter will, if applicable, be served and health, public safety and general welfare secured.
(b) Proposed land use decisions shall be called in the order determined by the administrative officer. If an application is not complete or all requirements of this chapter have not been complied with, the application is out of order and will not be called at that meeting. It shall be tabled for one month. If the application is still incomplete or out of order at the next meeting, it shall be deemed withdrawn. The applicant shall have to wait six months to reapply.
(Ord. of 12-21-2020) Sec. 68-1305. Governing body's public hearing.
(a) Before taking action on a proposed amendment and after receipt of the planning commission recommendations, the governing body shall hold a public hearing on the proposed amendment made pursuant to this article. At the public hearing, the governing body shall review the analysis submitted by the initiating party and the recommendation prepared by the planning commission. So that the purpose of this chapter will be served, health, public safety and general welfare secured, the governing body may approve or deny the application, reduce the land area for which the application is made, change the district or land use category requested or add or delete conditions of the application. The governing body shall have the power to impose a different zoning classification from the classification requested and impose any zoning conditions which ameliorate the impact of the zoning on neighboring property owners or serve other lawful purposes of this chapter.
An action by the governing body to defer the application shall include a statement of the date and time of the next meeting at which the application will be considered, which statement shall constitute public notice of the hearing on the application and no further notice is required.
(b) In conjunction with the approval of a map amendment in accordance with this section, the governing body may impose conditions to zoning approval which shall have the full force and effect of law. A condition to zoning approval may be imposed regardless of whether it is agreed to by the applicant or property owner. Use or development of the rezoned property shall not be permitted unless the conditions are fully complied with.
(c) The date of all approved amendments to the text of this chapter shall be indicated on the title/cover page of the text, and any sections within the chapter text hereafter amended or repealed shall be so indicated by an asterisk (*,**,***, etc.) and concurring footnote providing the date such amendment was approved. All such text amendments shall be incorporated within the text without unreasonable delay.
(d) Conduct of the hearing:
(1) All persons who wish to address the governing body at a hearing concerning a proposed zoning decision under consideration by the governing body shall first sign up on a form to be provided by the county prior to the commencement of the hearing.
(2) The administrative officer or his designee will read the proposed zoning decision under consideration and summarize the departmental reviews pertaining thereto prior to receiving public input on said proposed zoning decision. Proposed zoning decisions shall be called in the order determined by the administrative officer. If an application is not complete or all requirements of this chapter have not been complied with, the application is out of order and will not be called at that meeting. It shall be tabled for one month. If the application is still incomplete or out of order at the next meeting, it shall be deemed withdrawn. The applicant shall have to wait six months to reapply.
(3) The chair (or designee-county attorney) shall call each person who has signed up to speak on the zoning decision in the order in which the persons have signed up to speak, except the applicant who will always speak first. Prior to speaking, the speaker will identify himself or herself and state his or her current address. Only those persons who signed up to speak prior to the commencement of the hearing shall be entitled to speak unless the governing body, in its discretion, allows the person to speak to the zoning decision, notwithstanding the failure of the person to sign up prior to the hearing.
(4) Each speaker shall be allowed five minutes to address the governing body concerning the zoning decision then under consideration unless the governing body, prior to or at the time of the reading of the proposed zoning decision, allows additional time in which to address the governing body on said proposed zoning decision. The applicant or his representative may initially use all of the time allotted to him to speak or he may speak and reserve a portion of his allotted time for rebuttal provided, however, that the proponents and opponents of each amendment shall have no less than ten minutes per side for presentation of data, evidence and opinion thereon.
(5) Each speaker shall speak only to the merits of the proposed zoning decision under consideration and shall address his remarks only to the governing body. Each speaker shall refrain from personal attacks on any other speaker or the discussion of facts or opinions irrelevant to the proposed zoning decision under consideration. The governing body may limit or refuse a speaker the right to continue if the speaker, after first being cautioned, continues to violate this subsection.
(6) Nothing contained herein shall be construed as prohibiting the governing body from conducting the hearing in an orderly and decorous manner to assure that the public hearing on a proposed zoning decision is conducted in a fair and orderly manner.
(7) These procedures shall be available in writing at all hearings.
(Ord. of 12-21-2020) Sec. 68-1306. Standards governing the exercise of zoning power.
The following standards governing the exercise of the zoning power are adopted in accordance with O.C.G.A. § 36-66-5(b):
(a) The existing land uses and zoning classification of nearby property;
(b) The suitability of the subject property for the zoned purposes;
(c) The extent to which the property values of the subject property are diminished by the particular zoning restrictions;
(d) The extent to which the diminution of property values of the subject property promote the health, safety, morals or general welfare of the public;
(e) The relative gain to the public as compared to the hardship imposed upon the individual property owner;
(f) Whether the subject property has a reasonable economic use as currently zoned;
(g) Whether the proposed zoning will be a use that is suitable in view of the use and development of adjacent and nearby property;
(h) Whether the proposed zoning will adversely affect the existing use or usability of adjacent or nearby property;
(i) Whether the zoning proposal is in conformity with the policies and intent of the land use plan;
(j) Whether the zoning proposal will result in a use which will or could cause an excessive or burdensome use of existing streets, transportation facilities, utilities or schools;
(k) Whether there are other existing or changing conditions affecting the use and development of the property which give supporting grounds for either approval or disapproval of the zoning proposal.
(Ord. of 12-21-2020) Sec. 68-1307. Standards for granting conditional uses.
In reviewing an application for a conditional use, the governing body shall consider the following standards:
(a) A proper application has been filed in accordance with the requirements of the governing body;
(b) A recommendation has been received from the planning commission;
(c) The applicant is in compliance with the particular conditions for the proposed conditional use that are required by this chapter;
(d) The applicant is in compliance with conditions imposed by the governing body for the purpose of reducing the harmful effects of the use on surrounding uses and assuring compatibility with surrounding uses;
(e) The governing body determines that the benefits of and need for the proposed conditional use are greater than any possible depreciating effects and damages to the neighboring properties.
(Ord. of 12-21-2020) Sec. 68-1308. Hearing procedures.
Hearings on conditional uses shall follow the procedures for public hearings on text and map amendments.
(Ord. of 12-21-2020) Sec. 68-1309. Reapplication.
An application for a conditional use which has been denied shall not be resubmitted for a period of six months from the date of the denial by the governing body.
(Ord. of 12-21-2020) Secs. 68-1310—68-1400. Reserved.
ARTICLE XIV. ADMINISTRATION, INTERPRETATION,
ENFORCEMENT, PENALTIES, AND REMEDIES
Sec. 68-1401. Administration and interpretation.
The administrative officer shall be responsible for interpretation of the provisions of this chapter and for maintenance of the official land use district map, subject to general direction of the planning commission.
(Ord. of 12-21-2020) Sec. 68-1402. Enforcement.
The provisions of this chapter shall be enforced by the administrative officer.
(Ord. of 12-21-2020) Sec. 68-1403. Land disturbing activity permit required.
(a) A land disturbing activity permit shall be required for any proposed use of land(s) or building(s) to indicate and ensure compliance with all provisions of this chapter and Chapter 26 of the OCHC before any building permit is issued or any improvement, grading, land disturbing activity, or alteration of land(s) or building(s) commences provided, however, that land disturbance permits shall not be required for single-family residences on individual lots.
(b) All land-disturbing activity permits shall be issued by the administrative officer, who shall in no case approve a land disturbance permit for the use, construction or alteration of any land or building if the land or building as proposed to be used, constructed or altered would be in violation of any of the provisions of this chapter or any other codes and laws
(c) A land disturbance permit shall not be issued until an approved plat has been submitted with the application.
(Ord. of 12-21-2020) Sec. 68-1404. Building permit required.
No building, structure or sign shall be erected, moved, extended, enlarged or structurally altered until a building permit has been issued, except as specifically identified below:
(a) Structures no greater than 200 square feet in size located on any lot of record in Habersham County.
(b) Signs as set forth in section 201 of this chapter.
Although not required to obtain a building permit, the above-referenced structures shall obtain applicable permits for the connection of electricity, plumbing, mechanical, heating equipment and fuel gas piping.
Building permits shall become invalid unless the work authorized by it commences within 180 days of the date of issuance or if the work authorized by it is suspended or abandoned for a period of 180 days or more.
(Ord. of 12-21-2020) Sec. 68-1405. Certificate of occupancy required.
A certificate of occupancy issued by the administrative officer is required in advance of occupancy or use of any lot or change or extension in the use of any lot, any building or structure hereafter erected or any change in the use of an existing building or structure.
All certificates of occupancy shall be issued by the administrative officer and no such certificate shall be issued unless the proposed use of a building or land conforms to the applicable provisions of this chapter. Business licenses shall not be issued until the business conforms to the regulations of the district in which it is located and a valid certificate of occupancy is issued.
(Ord. of 12-21-2020) Sec. 68-1406. Penalties for violation.
Any person, firm or corporation violating, neglecting or refusing to comply with any of the provisions of this chapter shall be guilty of a misdemeanor and, upon conviction, shall be fined not less than $100.00 nor more than $500.00 for each offense or a sentence of imprisonment not exceeding 60 days in jail or to work on the streets or public works for a period not exceeding 60 days or as determined by the court of proper jurisdiction provided, however, that the following minimum fines are hereby established for specific actions which violate this chapter:
(a) Failure to obtain location decal by owner under section 68-703(b):
Penalty is as set forth in section 68-703(d)(2); and
(b) Moving mobile home/manufactured home for which no relocation permit has been issued under section 68-703. Penalty is as noted in section 68-703(d)(3).
(Ord. of 12-21-2020) Sec. 68-1407. Remedies.
In case any building or structure is or is proposed to be erected, constructed, reconstructed, altered, converted, or maintained or any building structure or land is or is proposed to be used in violation of any provision of this chapter, the administrative officer or any other appropriate authority may, in addition to other remedies and after due notice to the owner of the violation, issue a citation for violation of this chapter requiring the presence of the violator in the court of proper jurisdiction; institute injunction or other appropriate action or proceeding to prevent such unlawful erection, construction, reconstruction, alteration, conversion, maintenance or use to correct or abate such violation or to prevent the occupancy of such building, structure or land. Where a violation of this chapter exists with respect to a structure or land, the administrative officer may, in addition to other remedies, require that public utility service be withheld therefrom until such time as the structure or premises is no longer in violation of this chapter.
(Ord. of 12-21-2020) Sec. 68-1408. Jurisdiction for enforcement.
The boundaries of the area of jurisdiction of this chapter shall be the boundaries of Habersham County, excluding that land which lies within the boundaries of any municipality within the county. The land within these municipalities may be included under this chapter only after legal action is taken by the individual governing bodies of these municipalities to lawfully adopt this chapter.
(Ord. of 12-21-2020) Sec. 68-1409. Administrative procedures.
The Habersham County Planning Commission and governing authority may supplement these regulations as necessary with administrative procedures so that the regulations may be more effectively and consistently applied.
These administrative procedures must be explicitly recorded in the minutes of Habersham County Planning Commission and the governing authority.
(Ord. of 12-21-2020) Secs. 68-1410—68-1500. Reserved.
ARTICLE XVI. WIRELESS TELECOMMUNICATIONS FACILITIES
DIVISION 1. IN GENERAL
Sec. 68-1601. Purpose and intent.
The purpose of this article is to regulate the permitting, siting, placement, construction and modification of wireless telecommunications towers and facilities while fulfilling all applicable zoning standards and the visioning, planning and guidance within the Habersham County Comprehensive Plan.
Requirements in this article are based upon the county's authority to regulate wireless telecommunication facility development in unincorporated Habersham County under Georgia law and as provided in the Telecommunications Act of 1996. The county Comprehensive Plan finds, as a major source of economic development, a significant increase in tourism that relies upon special natural beauty, sports, recreation, cultural resources and rural character. Desired economic development is achievable when gains from expansion and upgrading of wireless services correspond with the comprehensive plan's protection of the special resources and characteristics necessary to achieve gains from the priority to increase tourism. Consequently, this article shall be interpreted to achieve the visioning within the comprehensive plan.
(Ord. of 12-21-2020) Sec. 68-1602. Overall policy and goals for permits for wireless telecommunications facilities.
In order to ensure that the placement, construction and modification of wireless telecommunications facilities protects the county's health, safety, public welfare, environmental features, the nature and character of the community and neighborhood and other aspects of the quality of life specifically listed elsewhere in this chapter and the comprehensive plan, the county hereby adopts an overall policy for wireless telecommunications facilities for the express purpose of achieving the following goals:
(a) The obtainment of an applicable permit for any new, co-location or modification of a wireless telecommunications facility.
(b) An application process for person(s) or entities seeking a permit for wireless telecommunications facilities.
(c) Application review and issuance of a permit for wireless telecommunications facilities that is both fair and consistent.
(d) The promotion of sharing and/or co-location of wireless telecommunications facilities and towers among service providers.
(e) Requirement, promotion and encouragement, wherever possible, of the placement, height and number of wireless telecommunications facilities in such a manner to minimize adverse aesthetic and visual impacts on the land, property, buildings and other facilities adjacent to, surrounding, and within the same general area as the requested location.
(Ord. of 12-21-2020) Sec. 68-1603. Exceptions and exclusions.
No person shall be permitted to site, place, build, construct, modify or prepare any site for the placement or use of a wireless telecommunications facility unless exempted below. No permit shall be required for those non-commercial exceptions noted in this section.
(a) All legally permitted wireless telecommunications towers and facilities in existence on or before the effective date of this article
(b) Any repair and maintenance of a wireless facility does not require an application for a permit. However, no additional construction or site modification will be permitted.
(c) The county's fire, sheriff's or other public service facilities owned and operated by the county.
(d) Any facilities expressly exempt from the county's siting, building and permitting authority.
(e) Over-the-air reception devices including the reception antennas for direct broadcast satellites (DBS), multi-channel multipoint distribution providers (MMDS), television broadcast stations (TVBS) and other customer-end antennas that receive and transmit fixed wireless signals that are primarily used for reception.
(f) Facilities not exceeding 75 feet in height used exclusively for private, non-commercial radio and television reception and private citizen's bands, licensed amateur radio and other similar non-commercial telecommunications.
(g) Facilities used exclusively for providing unlicensed spread spectrum technologies, such as IEEE 802.11a, b, and g services (e.g. wi-fi and bluetooth) where the facility does not require a new tower.
(h) Any electrical utility pole or tower used for the distribution or transmission of electrical service or other utilities not regulated by the county.
(Ord. of 12-21-2020) Sec. 68-1604. Permit application requirements for a new wireless support structure or increase in height of an existing
wireless support structure.
All applications for a permit for a new wireless telecommunications facility or for a modification or a co-location under this section shall comply with the requirements set forth in this section. The administrative officer is the individual to whom applications for a permit must be submitted. Said designee is authorized to review, analyze, evaluate and make recommendations to the planning commission and/or the board of commissioners:
(a) The administrative officer may reject in writing applications not meeting the requirements stated herein, which are otherwise not complete or not accompanied by proper fees.
(b) Any and all representations made by the applicant to the board or its duly authorized representatives on the record during the application process shall be in writing and shall be deemed a part of the application and will be deemed to have been relied upon in good faith by the board or their designee.
(c) An application for a permit for wireless telecommunications facilities shall be signed on behalf of the applicant by the person preparing the same and with knowledge of the contents and representations made therein and attesting to the truth and completeness of the information.
(d) The applicant must provide documentation to verify it has the authority to proceed as proposed on the site.
(e) The applicant shall include a statement in writing:
(1) That the applicant's proposed wireless telecommunications facilities shall be maintained in a safe manner, in compliance with all conditions of the permit, as well as all applicable county, state and federal laws, rules and regulations; and
(2) That the construction of the wireless telecommunications facilities is legally permissible, including, but not limited to, the fact that the applicant is authorized to do business in the state.
(f) Where a certification is called for in this article, such certification shall bear the signature and seal of a professional engineer licensed by the state.
(g) In addition to all other required information as stated in this article, all applications for the construction or installation of a new wireless telecommunications facility or co-location of an existing facility where the overall height or width of the structure or where the dimensions of the equipment compound will be increased shall contain the information hereinafter set forth. An applicant will be granted permission for anything that it can conclusively prove the technical or legal "need" as defined in section 68-201.
(h) Specific requirements: The items contained in Chapter C are mandatory on all applications to assist the board in rendering an informed decision on the application.
(Ord. of 12-21-2020) Sec. 68-1605. Requirements for an application for a co-location or modification to an existing structure.
The grant of a permit under this section shall be done by administratively granted authorization, such being defined in section 68-201.
(a) Within 30 calendar days of the date an application for modification or collocation is filed with the county, the board designee shall notify the applicant in writing of any information required to complete the application.
(b) Within 90 calendar days of the date an application for modification or collocation of wireless facilities is filed with the county, unless another date is specified in a written agreement between the administrative officer and the applicant, the administrative officer shall:
(1) Have the application reviewed and make its final decision to approve or disapprove the application; and
(2) Advise the applicant in writing of its final decision.
(c) An application for attaching wireless facilities to an existing structure including, but not limited to, cellular or PCS facilities and microwave facilities, shall contain the following information and comply with the following requirements:
(1) Documentation shall be provided proving that the applicant has the legal right to attach to the structure.
(2) A written statement that:
a. The proposed wireless telecommunications facility will be maintained in a safe manner, and in compliance with all
conditions of all applicable permits and authorizations.
b. The construction of the wireless telecommunications facilities is legally permissible.
(Ord. of 12-21-2020) Sec. 68-1606. Location of new wireless telecommunications facilities.
(a) If a service provider requests a planning meeting prior to considering a new site for an application, the meeting may include representative(s) of the applicant, the planning designee of the county, members of the community, and the county's consultant should the administrative officer deem it necessary for the consultant to attend.
(b) Unless the proof of technical need is established as set forth in subsection (c) below, telecommunications towers and wireless telecommunications facilities shall be prohibited:
(1) From being built on any crest or extending above any and all crests;
(2) When any portion of a structure on a ridge extends higher than 30 feet above the ambient tree height near the facility.
(3) Within areas of traditional neighborhoods or subdivisions except the fringe and at least one eighth mile from a dwelling.
(4) Within or visually intrusive to county identified river protection corridor and scenic road corridor character areas.
(5) Within or visually intrusive to any recognized historic area for the purposes of cultural preservation.
(6) In areas identified by local, state, or federal agencies containing biological or environmental impact to alleviate harm to any variety of species.
(7) Within or visually intrusive to a view shed that contributes to scenic beauty and/or tourist attractions or facilities.
(c) Wireless telecommunications facilities may be allowed in the above seven areas if the applicant provides proof of technical need by documentation in the form of clear and convincing evidence to demonstrate that the proposed telecommunications tower or wireless facility is necessary and:
(1) The area cannot be served from outside the area.
(2) Co-location is not possible.
(3) Increasing the height of an existing wireless telecommunication facility cannot provide the service.
(4) Serving a traditional neighborhood or subdivision residential area from outside the area is technologically impracticable.
(5) Serving a traditional neighborhood or subdivision with a satisfactory stealth structure is technologically impracticable.
(6) An alternative structure compatible with the area such as a silo, barn cupola or church steeple cannot be used to provide wireless telecommunications service to the area.
(7) An alternative configuration of sites to avoid a structure on a crest or on a ridge that extends no more than 30 feet above the ambient tree height near the facility is technologically impracticable.
(d) Notwithstanding that a potential site may be situated in an area of highest or highest available priority, the county may disapprove an application for any, or a combination, of the following reasons:
(1) Conflict with local, state and federal safety and safety-related codes and requirements.
(2) The placement and location or height of a wireless telecommunication facility would create an unacceptable risk, or the reasonable possibility of such to residents, the public or employees of the service provider or other service providers.
(3) Placement and location or height of the facility conflicts with provisions of this article.
(4) Failure to submit documentation required under this article within 30 days of written notice to the applicant setting forth any deficiencies in the application.
(e) Notwithstanding anything to the contrary in this article the governing body may require the investigation of relocation of a proposed site, chosen by the applicant to use more than one site or other support structure to provide substantially the same service if the location could result in a less intrusive facility or facilities singly or in combination, as long as such does not prohibit or serve to prohibit the provision of service.
(Ord. of 12-21-2020) Sec. 68-1607. Shared use of wireless telecommunications facilities and other structures.
(a) This article requires wireless facilities to be located on existing wireless support structure or other suitable structures unless such is proven to be technologically impracticable. The applicant shall submit a comprehensive report inventorying all existing wireless support structure and other suitable structures within one mile of the location of any proposed new wireless support structure. Applicant may present conclusive documentation for consideration by the governing body showing that another distance is more appropriate and other suitable structure cannot be used.
(b) An applicant intending to locate on an existing tower or other suitable structure not owned by the applicant shall be required to provide documentation from the existing owner that the applicant is permitted co-location.
(c) Shared use or co-location shall contain the minimum antenna array technologically required to primarily serve the needs of customers within the county, with incidental service to customers outside the county at the board's discretion.
(Ord. of 12-21-2020) Sec. 68-1608. Height of telecommunications tower(s).
(a) New towers shall be of the monopole type, unless such is proven to be technologically impracticable.
(b) The applicant shall submit documentation justifying the technical need by the service provider for the total height of any wireless support structure and/or antenna requested and the basis therefore. To enable verification of the need for new wireless support structures, documentation in the form of propagation studies must include all backup data used to produce the studies at the height requested, the maximum height allowed by this article, and the midpoint of the height range. Such documentation will be analyzed in the context of the justification of the height needed to primarily serve the needs of customers within the county.
(c) (1) The placement and installation of towers and antennas are permitted by application for a building permit up to a height of 165 feet pursuant to the provisions of section 68-1606.
(2) The placement and installation of towers and antennas are permitted with planning commission review up to a height of 199 feet pursuant to the provisions of section 68-1606.
(3) The placement and installation of towers and antennas with a height of 200 feet or greater shall be conditional uses in all land use districts.
(d) Spacing or the distance between towers shall be such that the service may be provided without exceeding the maximum permitted height.
(Ord. of 12-21-2020) Sec. 68-1609. Visibility of wireless telecommunications facilities.
(a) Wireless telecommunications facilities shall not be artificially lighted or marked except as required by ordinance or other applicable agencies.
(b) Stealth: All new wireless telecommunications facilities including, but not limited to, towers, shall utilize stealth or camouflage techniques, unless such can be shown to be either commercially or technologically impracticable.
(c) If wireless telecommunications facilities are lighted for any reason, the applicant shall provide a detailed plan for sufficient lighting of as unobtrusive and inoffensive an effect as is permissible under state and FAA regulations.
All such lighting shall be affixed with technology that enables the light to be seen as intended from the air but that prevents the ground scatter effect so that it is not able to be seen from the ground to a height of at least 12 degrees vertical for a distance of at least one mile in a level terrain situation flush mounting: So as to be the least visually intrusive reasonably possible all antennas attached to a tower or other structure shall be as near to flush mounted as is technologically practicable.
(d) Placement on building—fascia. If attached to a building, all antennas shall be mounted on the fascia of the building and camouflaged so as to match the color and, if possible, texture of the building or in a manner so as to make the antennas as visually innocuous and undetectable as is possible given the facts and circumstances involved.
(Ord. of 12-21-2020) Sec. 68-1610. Security of wireless telecommunications facilities.
(a) All wireless telecommunications facilities, antennas and accessory equipment shall be located, fenced or otherwise secured in a manner that prevents unauthorized access.
(b) Transmitters and telecommunications control points shall be installed in such a manner that they are readily accessible only to persons authorized to operate or service them.
(Ord. of 12-21-2020) Sec. 68-1611. Signage.
Wireless telecommunications facilities shall contain a sign no larger than four square feet in order to provide adequate notification to persons in the immediate area of the presence of RF radiation to minimize accidental exposure to RF radiation within a given area. A sign of the same size is also to be installed containing the name(s) of the owner(s) and operator(s) of the antenna(s) as well as emergency phone number(s). The sign shall be on the equipment shelter or cabinet of the applicant and be visible from the access point of the site and must identify the equipment owner of the shelter or cabinet. On tower sites, an FCC site registration, as applicable, is also to be present. The signs shall not be lighted unless specified by law, rule or regulation. No other signage, including advertising, shall be permitted.
(Ord. of 12-21-2020) Sec. 68-1612. Lot size and setbacks.
(a) All proposed towers shall be setback from recorded rights-of-way and habitable building by the distance specified by the engineer of record plus 25 percent, otherwise known as the Fall Zone. The nearest portion of any new access road to the tower shall be no less than 15 feet from the nearest property line.
(b) There shall be no development of habitable buildings within the Fall Zone set forth in the preceding subsection.
(Ord. of 12-21-2020) Sec. 68-1613. Retention of expert assistance.
The board of commissioners may hire any consultant and/or expert necessary to assist the county in reviewing and evaluating applications. Such consultant and/or expert shall participate in pre-application and site visit meetings, and upon receipt of a complete application shall review and evaluate the application and associated data, including safety requirements and technical review.
(Ord. of 12-21-2020) Sec. 68-1614. Action on an application for a permit for wireless telecommunications facilities.
(a) The board designee will review an application pursuant to this article in a timely fashion, and as required by applicable federal law (the Telecommunications Act of 1996) as amended and legally enforceable interpretations and declaratory rulings thereof.
(b) For applications requiring a public hearing before the Board of Commissioners, the county Board of Commissioners may by proper vote and in accordance with its by-laws, request further study, approve, approve with conditions or deny a permit.
(c) The applicant shall be notified of the board's ruling and any conditions, if applicable, in writing within ten calendar days of the board's action. The grant and issuance of such permit does not exempt the applicant from obtaining land disturbance permits and building permits or certificates of compliance.
(Ord. of 12-21-2020) Sec. 68-1615. Adherence to state and/or federal rules and regulations, building codes and safety standards.
To ensure the structural integrity of wireless support structures, the owner, permittee or subsequent lessee of a tower or alternative tower structure shall meet or exceed current standards and regulations of the FAA, the FCC and any other agency of the federal government with the authority to regulate towers and antennas, ensure that towers are maintained in compliance with standards contained in applicable local building codes and published by the International Code Council and the American National Standards Institute. If, upon inspection, the county concludes that a tower fails to comply with all applicable codes and standards, or constitutes a danger to persons or property, then upon receipt of written notice by the owner, permittee, or lessee of the tower, said party shall have 180 days to bring the tower into compliance with such standards. If the owner, permittee or lessee fails to bring the tower into compliance within the 180-day period, the governing authority may remove the tower at the owner, permittee or lessee's expense. Prior to the removal of any tower, the county may consider detailed plans submitted by the owner, permittee or subsequent lessee for repair of substandard towers and may grant a reasonable extension of the above referenced compliance period. Any such removal by the governing authority shall be in the manner provided in O.C.G.A. §§ 41-2-7 through 41-2-17.
(Ord. of 12-21-2020) Sec. 68-1616. Abandonment of wireless telecommunication facilities.
(a) Any tower or antenna that is not operated for a continuous period exceeding six months shall be considered abandoned, and the owner of such antenna or tower shall remove the structure within 60 days of receipt of notice from the county notifying the owner of such abandonment. If said tower or antenna is not removed within said 60 days, the governing authority may, in the manner provided in the O.C.G.A. §§ 41-2-7 through 41-2-17, remove such antenna or tower at the owner's expense. If there are two or more users of a single tower, then this provision shall not become effective until all users cease utilizing the tower.
(b) Prior to the issuance of a permit for the construction of a tower or antenna, the owner of the tower or antenna facility shall procure a bond or a letter of credit from a surety with an office located in State of Georgia, in an amount not less than $25,000.00 conditioned upon the removal of the tower and/or antenna, should it be deemed abandoned under the provisions set forth in subsection (a) of this section. Such bond or letter of credit must be renewed at least every two years during the life of the tower or antenna.
(Ord. of 12-21-2020) Sec. 68-1617. Appeals, variances, application, procedural requirements, administration, interpretation, enforcement, penalties, and remedies.
Unless otherwise prohibited by law or in conflict with any section of this article, appeals, variances, application, procedural requirements, administration, interpretation, enforcement, penalties and remedies as set forth in article XII of this chapter and as most currently amended are expressly incorporated in this article.
(Ord. of 12-21-2020)
DIVISION 2. STANDARDS FOR SMALL WIRELESS FACILITIES
PLACED IN THE COUNTY RIGHT-OF-WAY
Sec. 68-1618. Purpose and scope.
(a) The purpose of this article is to establish nondiscriminatory policies and procedures for use of the right-of-way and more specifically the placement of small wireless facilities in right-of-way within the county jurisdiction, which will provide public benefit consistent with the preservation of the integrity, safe usage and reasonable aesthetic qualities of the county right-of-way and the county as a whole.
(b) In enacting this article, the county is establishing uniform standards consistent with federal and state law to address the placement of small wireless facilities and associated poles in the right-of-way including, without limitation, to:
(1) Prevent interference with the use of streets, sidewalks, alleys, parkways and other public ways and places;
(2) Prevent the creation of visual and physical obstructions and other conditions that are hazardous to vehicular and pedestrian traffic;
(3) Prevent interference with the facilities and operations of facilities lawfully located in right-of-way or public property;
(4) Preserve the character of historic districts or areas with decorative poles;
(5) Protect against environmental damage, including damage to trees; and
(6) Facilitate rapid deployment of small cell facilities to provide the benefits of wireless services.
(c) This article supersedes all articles or parts of articles adopted prior hereto that are in conflict herewith, to the extent of such conflict.
(Ord. of 12-21-2020) Sec. 68-1619. Definitions.
The following words, terms, and phrases when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning.
Administrative review means review of an application by the county relating to the review and issuance of a permit including review by county staff, to determine whether the issuance of a permit is in conformity with the applicable provisions of this article. An application that is subject to administrative review shall be approved as provided in section 68-1629 of this article.
Antenna means the following:
(a) Communications equipment that transmits and/or receives electromagnetic radio frequency signals used in the provision of wireless services or other wireless communications; or
(b) Similar equipment used for the transmission or reception of surface waves.
The definition for an antenna does not apply to broadcast antennas, antennas designed for amateur radio use, or satellite dishes for residential or household purposes.
Applicable codes means uniform building, fire, safety, electrical, plumbing or mechanical codes adopted by a recognized national code organization to the extent such codes have been adopted by the county or otherwise are applicable in the county. The county adopted the current edition of the Utility Accommodation Policy and Standards (UAM) issued by the State of Georgia Department of Transportation.
Applicant means any person who submits an application as or on behalf of a wireless provider.
Application means a written request submitted by an applicant to the county for a permit to:
(a) Collocate a small wireless facility in a right-of-way; or
(b) Install, modify, or replace a pole or decorative pole in a right-of-way on which a small wireless facility is or will be collocated.
County means Habersham County, Georgia.
County pole means a pole owned, managed or operated by or on behalf of the county. Such term shall not include poles, support structures, electric transmission structures or equipment of any type owned by an electric supplier.
Collocate or collocation means to install, mount, modify or replace a small wireless facility on or adjacent to a pole, decorative pole or support structure.
Communications service provider means a provider of communications services.
Communications services means cable service as defined in 47 U.S.C.
Section 522(5); telecommunications service as defined in 47 U.S.C. Section 153(53); information service as defined in 47 U.S.C. Section 153(24), as each such term existed on January 1, 2019; or wireless services.
Decorative pole means a County pole that is specially designed and placed for aesthetic purposes.
Eligible facilities request means an eligible facilities request as set forth in 47 C.F.R. Section 1.40001(b)(3), as it existed on January 1, 2019 and as may be amended from time to time.
Fee means a one-time, nonrecurring charge based amount based on time and expense.
Historic district means the following:
(a) Any district, site, building, structure, or object included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior of the United States in accordance with Section VI.D.1.a.i-v of the Nationwide Programmatic Agreement codified by 47 C.F.R. Part 1;
(b) Any area designated as a historic district under O.C.G.A. Article 2 of Article 10 of Title 44, the "Georgia Historic Preservation Act"; or
(c) Any area designated as a historic district or property by law prior to the effective date of this code section.
Law means and includes any and all federal, state or local laws, statutes, common law, codes, rules, regulations, orders or ordinances.
Micro wireless facility means a small wireless facility not larger in dimension than 24 inches in length, 15 inches in width and 12 inches in height that has an exterior antenna, if any, no longer than 11 inches.
Permit means a written authorization, in electronic or hard copy format, required to be issued by the county to initiate, continue or complete the collocation of a small wireless facility or the installation, modification or replacement of an associated pole or decorative pole upon which a small wireless facility is collocated.
Person means an individual, corporation, limited liability company, partnership, association, trust or other entity or organization, including the county.
Pole means a vertical pole such as a utility, lighting, traffic or similar pole made of wood, concrete, metal or other material that is lawfully located or to be located within a right-of-way, including without limitation a replacement pole and an county pole. Such term shall not include a support structure, decorative pole or electric transmission structure.
Rate means a recurring charge.
Reconditioning work means the activities associated with substantially painting, reconditioning, improving or repairing county poles.
Replace, replacement, or replacing means to replace an existing pole or decorative pole with a new pole or decorative pole, similar in design, size and scale to the existing pole or decorative pole consistent with 47 C.F.R.
1.40001(b)(7) as it existed on January 1, 2019 in order to address limitations of or change requirements applicable to the existing pole to structurally support the collocation of a small wireless facility.
Right-of-way or ROW means property or any interest therein, whether or not in the form of a strip, which is acquired for or devoted to a public road. A public road can be a highway, road, street, avenue, drive or other way that is either open to the public or has been acquired as right-of-way and is intended to be used by the public and for the passage of vehicles in any county or municipality of Georgia. The term ROW shall only apply to property or an interest therein that is under the ownership or control of the county. The term ROW shall not include property or any interest therein acquired for or devoted to an interstate highway or the public rights, structures, sidewalks, facilities and appurtenances for buildings for public equipment and personnel used for or engages in administration, construction or maintenance of such ways or scenic easements and easements of light, air, view and access.
Small wireless facility means radio transceivers, surface wave couplers, antennas, coaxial, fiber-optic or other cabling, power supply and backup battery and comparable and associated equipment, regardless of technological configuration at a fixed location or locations that enables communication or surface wave communication between user equipment and a communications network and that meets both of the following qualifications:
(a) Each wireless provider's antenna could fit within an enclosure of no more than six cubic feet in volume; and
(b) All other wireless equipment associated with the facility is cumulatively no more than 28 cubic feet in volume. When an enclosure is used, volume shall be measured based on the exterior dimensions of the enclosure.
The following types of associated, ancillary equipment are not included in the calculation of equipment volume: electric meter, concealment elements, telecommunications demarcation box, grounding equipment, power transfer switch, cut-off switch and vertical cable runs for connection of power and other services. The term does not include the pole, decorative pole or support structure on, under or within which the equipment is located or collocated or to which the equipment is attached and does not include any wireline backhaul facilities or coaxial, fiber-optic or other cabling that is between small wireless facilities, poles or support structures or that is not otherwise immediately adjacent to or directly associated with a particular antenna.
Support structure means a building, billboard, water tank or any other structure to which a small wireless facility is or may be attached. Such term shall not include a decorative pole, electric transmission structure, or pole.
Wireless infrastructure provider means any person, including a person authorized to provide telecommunications service in the state, that builds, installs or operates small wireless facilities, poles or support structures on which small wireless facilities are or are intended to be used for collocation but that is not a wireless services provider.
Wireless provider means a wireless infrastructure provider or a wireless services provider.
Wireless services means any services using licensed or unlicensed spectrum, including the use of wi-fi, whether at a fixed location or mobile, provided to the public.
Wireless services provider means a person who provides wireless services.
Wireline backhaul facility means an aboveground or underground wireline facility used to transport communications data from a telecommunications demarcation box associated with small wireless facility to a network.
(Ord. of 12-21-2020) Sec. 68-1620. Rates and fees.
(a) As a condition to the issuance of a permit to collocate a small wireless facility or to install, modify or replace a pole or a decorative pole for collocation of a small wireless facility in the right-of-way, the applicant shall pay the following fees and rates:
(1) An application fee for each small wireless facility collocated on an existing pole, decorative pole, or support structure assessed by the county not to exceed $100.00 per small wireless facility;
(2) An application fee for each new pole with an associated small wireless facility assessed by the county not to exceed $1,000.00 per pole with an associated small wireless facility;
(3) An application fee for each replacement pole with an associated small wireless facility assessed by the county not to exceed $250.00 per replacement pole with an associated small wireless facility;
(4) Annual right-of-way occupancy rate assessed by the county for nonexclusive occupancy of the right-of-way by the applicant not to exceed:
a. One hundred dollars per year for each small wireless facility collocated on any existing or replacement including an existing or replacement county pole;
b. Two hundred dollars per year for each new pole with an associated small wireless facility, provided however that such rate shall not be applied to a replacement pole;
(5) An annual attachment rate assessed by the county for collocations on county poles shall be nondiscriminatory regardless of the services provided by the collocating wireless provider. Such annual attachment rates shall not exceed $40.00 per year per small wireless facility;
(6) A fee for make-ready work as provided in subsection 68-1622(m) of this article and
(7) Generally applicable, non-discriminatory fees for any permit required under generally applicable law, provided however that an applicant shall not be required to obtain or pay any fees for a building permit as the permit issued pursuant to this article serves as a building permit for the applicable poles and small wireless facilities.
(b) The monetary caps in subsections 68-1620(a)(1)—(5) of this article shall increase 2.5 percent annually beginning January 1, 2021.
(c) An applicant shall not be subject to any fees or rates other than those expressly provided for by this article.
(d) The applicant, or person who owns or operates the small wireless facility collocated in the right-of-way (including, without limitation, on a county pole) may remove its small wireless facilities at any time from the right-of-way, upon not less than 30 days prior written notice to the county and may cease paying to the county any applicable fees and rates for such use, as of the date of actual removal of the small wireless facilities. In the event of such removal, the right-of-way shall be, to the extent practicable, restored to its condition prior to the removal. If the applicant fails to return the right-of-way to the extent practicable in the reasonable judgement of the county to its condition prior to the removal within 90 days, the county may, at the sole option of the county, restore the right-of-way to such condition and charge the applicant its reasonable, documented cost of doing so plus a penalty not to exceed $500.00. The county may suspend the ability of the applicant to receive any new permits from the county until the applicant has paid the amount assessed for such restoration costs and the penalty assessed, if any.
(e) Any failure to comply with subsection 68-1621(b) of this article by a wireless provider shall allow the county, at the sole discretion of the county, to restore the right-of-way to the extent practicable in the reasonable judgment of the county to its condition prior to the unpermitted collocation or installation and to charge the responsible wireless provider its reasonable, documented cost of doing so plus a penalty not to exceed $1,000.00. The county may suspend the ability of the wireless provider to receive any new permits from the county until the wireless provider has paid the amount assessed for such restoration costs and the penalty assessed, if any.
(Ord. of 12-21-2020) Sec. 68-1621. Collocations and pole installations subject to administrative review.
(a) A wireless provider may collocate small wireless facilities on county poles, decorative poles and support structures in the right-of-way subject to administrative review only and issuance of a permit as set forth in this article. All such uses shall be in accordance with applicable provisions of this article, including without limitation, those set forth in section 68-1624 of this article:
(1) Collocation of a small wireless facility on or adjacent to a pole or a support structure that does not exceed the limitations set forth in subsection 68-1622(i) of this article or on or adjacent to a decorative pole in compliance with section 68-1627 of this article; and
(2) Installation, modification, or replacement of a pole or a decorative pole for collocation of a small wireless facility that does not exceed the limitations set forth in subsection 68-1622(i) of this article.
(b) No wireless provider shall collocate any small wireless facility in the right or way or install, modify or replace a pole or decorative pole for collocation of a small wireless facility in the right-of-way without first filing an application and obtaining a permit therefor, except as otherwise expressly provided in subsection 68-1621(e) of this article.
(c) The county shall make accepted applications publicly available.
Notwithstanding the foregoing, an applicant may designate portions of its application materials that it reasonably believes contain trade secrets by following the procedures set forth in subparagraph (34) of paragraph (a) of O.C.G.A. Article 72 of Article 18 of Title 50.
(d) The application shall be made by the applicable wireless provider or its duly authorized representative and shall contain the following:
(1) The applicant's name, address, telephone number and e-mail address, including emergency contact information for the applicant;
(2) The names, addresses, telephone numbers and e-mail addresses of all consultants, if any, acting on behalf of the applicant with respect to the filing of the application;
(3) A general description of the proposed work and the purposes and intent of the proposed facility. The scope and detail of such description shall be appropriate to the nature and character of the physical work to be performed, with special emphasis on those matters likely to be affected or impacted by the physical work proposed;
(4) Detailed construction drawings regarding the proposed use of the right-of-way;
(5) To the extent the proposed facility involves collocation on a pole, decorative pole or support structure, a structural report performed by a duly licensed engineer evidencing that the pole, decorative pole or support structure will structurally support the collocation (or that the pole, decorative pole or support structure may and will be modified to meet structural requirements) in accordance with applicable codes;
(6) For any new aboveground facilities, visual depictions or representations if not included in the construction drawings;
(7) Information indicating the horizontal and approximate vertical location, relative to the boundaries of the right-of-way of the small wireless facility for which the application is being submitted;
(8) If the application is for the installation of a pole or replacement of a decorative pole, a certification that complies with subsection 68-1621(j) of this article;
(9) If the small wireless facility will be collocated on a pole or support structure owned by a third party, a certification that the wireless provider has permission from the owner to collocate on the pole or support structure; and
(10) If the applicant is not a wireless services provider, a certification that a wireless services provider has requested in writing that the applicant collocate the small wireless facilities or install, modify or replace the pole or decorative pole at the requested location.
(e) An application shall not be required for the following activities, provided that a wireless provider may be required to obtain permits for such activities, such as electrical permits or street opening permits, if otherwise required by generally applicable law:
(1) With respect to a pole or decorative pole on which a small wireless facility is collocated, inspections, testing, repairs and modifications that maintain functional capacity and aesthetic and structural integrity, provided that modifications are limited by the structural load analysis supplied by the applicant in its prior application to the county; and
(2) With respect to a small wireless facility, inspections, testing or repairs that maintain functional capacity or the replacement or upgrade of antennas or other components of the small wireless facility such as a swap out or addition of antennas and radio equipment as required by the applicant with antennas and other components that are substantially similar in color, aggregate size and other aesthetics to that previously permitted by the county and consistent with the height and volume limits for small wireless facilities under this article, so long as the pole, decorative pole or support structure will structurally support or prior to installation will be modified to support, the structural load in accordance with the structural load analysis supplied by the applicant in its prior application to the county.
(f) Any material change to information contained in an application shall be submitted in writing to the county within 30 days after the events necessitating the change.
(g) Unless otherwise provided by applicable laws, all applications pursuant to this article shall be accompanied by the fees as required in section 68-1620 of this article.
(h) The county shall not enter into an exclusive arrangement with any person for use of the right-of-way for the collocation of small wireless facilities or the installation, operation, marketing, modification, maintenance or replacement of poles, or for the right to attach to county poles. A person who purchases or otherwise acquires a county pole is subject to the requirements of this article.
(i) The county, in the exercise of its administration and regulation related to the management of the right-of-way, shall be competitively neutral and nondiscriminatory with regard to other users of the right-of-way.
(j) A wireless provider shall not apply to install a pole or replace a decorative pole unless it has determined after diligent investigation that it cannot meet the service objectives of the permit by collocating on an existing pole or support structure on which the provider has the right to collocate subject to reasonable terms and conditions, and such collocation would not impose technical limitation or significant additional costs. The wireless provider shall certify that it has made such a determination in good faith, based on the assessment of a licensed engineer, and it must provide a written summary of the basis for such determination.
(k) Requests for installation, modification, or replacement of a support structure are not eligible for administrative review as set forth in this section 68-1621 of this article.
(Ord. of 12-21-2020) Sec. 68-1622. Review of applications subject to administrative review.
(a) The requirements of this section govern the county's review of applications for uses that are subject to administrative review as described in Subsection 68-1621(a) of this article.
(b) If an applicant has not previously held a meeting that complies with this article, an applicant shall meet with the county at least 30 days before submitting applications under this article to inform the county in good faith when such applicant expects to commence deployment of small wireless facilities and poles within the county pursuant to this article, the number of small wireless facilities and poles it expects to deploy during the 24 months after commencement and the expected timing of such deployments.
(1) All documents or other information provided by the applicant in the course of, or in association with, any meetings provided for in this article shall be presumed to be confidential and proprietary and a trade secret as such term is defined in O.C.G.A. Article 27 of Article 1 of Title 10, shall be subject to exemption from disclosure under state and federal law and shall not be subject to disclosure under O.C.G.A.
Article 4 of Article 18 of Title 50.
(c) Within 20 days of receiving an application, the county must:
(1) Notify the applicant in writing of the commencement and completion dates of any widening, repair, reconstruction or relocation of the applicable right-of-way that is scheduled to commence or is anticipated in good faith to commence within 24 months after the application is filed.
(2) Notify the applicant, based on the county's good-faith preliminary review of the information provided in the application, of any aspect of the application that appears to be grounds for the county not to approve the application as described in Subsection 68-1622(j) of this article; and
(3) Determine whether the application is complete and inform the applicant of its determination in writing. If the county determines an application is incomplete, it must specifically identify to the applicant in writing all missing information within this 20 day period; otherwise the application is deemed complete. If the county identifies missing information to the applicant as provided above, the applicant may submit such missing information to the county within 20 days of receipt of notification in writing from the county without paying any additional application fee and any subsequent review of the application by the county for completeness must be limited to the previously identified missing information. If the county determines that an application remains incomplete or if the county determines that the applicant has made material changes to the application (other than to address the missing information identified by the county), the county must notify the applicant of such determination in writing within ten days of receipt of the resubmission of the application, and absent an agreement to the contrary between the county and the applicant that is confirmed by email or other writing, such notice shall constitute a denial of the application and a new application and application fee must be submitted. If the county does not provide such written notification to the applicant within this ten day period, the application shall be deemed complete.
(d) The county shall make its final decision to approve or deny the application within 30 days of the written determination that the application is complete or when the application is deemed complete as described in subsection 68-1622(c) of this article, whichever is earlier, for a collocation, and within 70 days of the written determination that the application is complete or when the application is deemed complete as described in subsection 68-1622(c) of this article, whichever is earlier, for the installation, modification or replacement of a pole or decorative pole.
(e) A decision to deny an application pursuant to this section 68-1622 of this article shall be in writing, shall identify all the reasons for the denial and shall identify the applicable code provisions or other standards applicable pursuant to this article on which the denial was based. The decision to deny shall be sent to the applicant contemporaneously via email or regular mail.
The written decision shall be deemed delivered upon email transmission or deposit into regular mail receptacle with adequate postage paid. The review period shall run until the written decision is sent to the applicant.
(f) If the county fails to act on an application within the review period referenced in this article, the applicant may provide the county written notice that the time period for acting has lapsed and the county then has 20 days after receipt of such notice within which to render its written decision. The application shall be deemed approved by passage of time and operation of law if the county does not render its written decision within such 20 days.
(g) An applicant may, at the applicant's discretion and subject to the consolidated application requirements and processes as described in section 68-1629 of this article file a consolidated application.
(h) Notwithstanding any other provision of this article, to the extent that an application constitutes an eligible facilities request, the county may not deny the application and shall approve the application within 60 days according to the procedures established under 47 C.F.R. 1.40001(c).
(i) Small wireless facilities and new, modified or replacement poles to be used for collocation of small wireless facilities may be placed in the right-of-way as a permitted use in accordance with section 68-1621 of this article, subject to the definition of a small wireless facility as described in section 68-1619 of this article:
(1) Each such new, modified or replacement pole installed in the right-ofway in historic districts and in areas zoned exclusively for residential use shall not exceed 50 feet above ground level;
(2) Each such new, modified or replacement pole installed in the right-ofway that is not in an historic district or in area zoned exclusively for residential use shall not exceed the greater of:
a. Fifty feet above ground level; or
b. Ten feet greater in height above ground level than the tallest existing pole in the same county right-of-way in place as of January 1, 2019 and located within 500 feet of the new proposed pole; and
(3) New small wireless facilities in the right-of-way shall not exceed:
a. For a collocation on an existing pole or support structure more than ten feet above the existing pole or support structure; or
b. For a collocation on a new, modified or replacement pole as described in subsection 68-1622(i) of this article, the height limit under those paragraphs.
(j) The county shall approve an application for permitted uses described in subsection 68-1621(a) of this article unless it:
(1) Interferes with the operation of traffic control equipment;
(2) Interferes with sight lines or clear zones for transportation or pedestrians;
(3) Fails to comply with the Americans with Disabilities Act, 42 U.S.C.
Section 12101, et seq., or similar laws of general applicability regarding pedestrian access or movement;
(4) Requests that ground-mounted small wireless facility equipment be located more than 7.5 feet in radial circumference from the base of the pole, decorative pole or support structure to which the small wireless facility antenna would be attached, provided that the county shall not deny the application if a greater distance from the base of the pole, decorative pole or support structure is necessary to avoid interfering with sight lines or clear zones for transportation or pedestrians or to otherwise to protect public safety;
(5) Fails to comply with applicable codes;
(6) Fails to comply with the maximum limitations set forth in subsection 68-1622(i) of this article, or the requirements of section 68-1628 of this article;
(7) With respect to an application to install a pole or decorative pole interferes with the widening, repair, reconstruction or relocation of a public road or highway by the county or the department of transportation that has been advertised for bid and scheduled for completion within six months after the application is filed;
(8) With respect to an application to install a pole or decorative pole interferes with a public works construction project governed by O.C.G.A. Article 91 of Title 36 which is advertised for bid and scheduled for completion within six months after the application is filed;
(9) Fails to comply with sections 68-1625, 68-1626 or 68-1627 of this article;
(10) Fails to comply with laws of general applicability addressing pedestrian and vehicular traffic and safety requirements; or
(11) Fails to comply with laws of general applicability that address the occupancy or management of the right-of-way and that are not otherwise inconsistent with this article.
(k) Effect of permit.
(1) A permit from the county authorizes an applicant to undertake only certain activities in accordance with this article, and does not create a property right or grant the applicant to impinge upon the rights of others who may already have an interest in the right-of-way.
(2) Collocation, installation, modification, or replacement for which a permit is issued under this article shall be completed within six months after issuance, provided that an extension shall be granted for up to an additional six months upon written request made before the end of the initial six month period if a delay results from circumstances beyond the reasonable control of the applicant. Issuance of a permit authorizes the applicant to:
a. Undertake the collocation, installation, modification or replacement approved by the permit; and
b. Operate and maintain the small wireless facilities and any associated pole covered by the permit for a period of not less than ten years, which shall be renewed for equivalent durations so long as the applicant is in compliance with the criteria set forth in Subsection 68-1622(j) of this article, subject to the relocation requirements described in subsection 68-1622(1) of this article and the applicant's right to terminate at any time.
(l) If, in the reasonable exercise of police powers, the county requires widening, repair, reconstruction or relocation of a public road or highway or relocation of support structures, poles or small wireless facilities is required as a result of a public project; a wireless provider shall relocate poles and support structures it has installed in the right-of-way for the collocation of small wireless facilities pursuant to this article at no cost to the county should such poles be found by the county to be unreasonably interfering with the widening, repair, reconstruction, relocation project or public project. If widening, repair, reconstruction or relocation is required as a condition or result of a project by an entity other than the county, the other entity shall bear the cost of relocating such poles or support structures and any communications facilities on such poles or support structures. The wireless provider shall relocate the support structures or poles:
(1) By the date designated in a written notice from the county that contains a good faith estimate by the county of the date by which the county intends to commence work, whenever the county has determined that such removal, relocation, change or alteration is reasonably necessary for the construction, repair, maintenance or installation of any county improvement in or upon or the operations of the county in or upon the right-of-way so long as the same timeframes are applied to all utilities in the right-of-way; provided however that the date designated for relocation must be at least 45 days after the county provides the written notice to the wireless provider; or
(2) Within the time frame the wireless provider estimates in good faith is reasonably needed to complete the relocation, so long as the wireless provider provides the county written notice of its good faith estimate within 30 days following receipt of the written notice provided by the county pursuant to subsection 68-1622(1) of this article and explains in detail why the wireless provider cannot reasonably complete the relocation by the date designated in the county's written notice.
(3) The wireless provider shall reasonably cooperate with the county to carry out reconditioning work activities in a manner that minimizes interference with the wireless provider's approved use of the facility.
a. Prior to commencing reconditioning work, the county will use reasonable efforts to provide the wireless provider with at least 120 days prior written notice. Upon receiving that notice, it shall be the wireless provider's sole responsibility to provide adequate measures to cover, remove or otherwise protect the wireless provider's communications facility from the consequences of the reconditioning work including, but not limited, to paint and debris fallout. The county reserves the right to require the wireless provider to remove all of the wireless provider's communications facility from the county pole and surrounding premises during reconditioning work, provided the requirement to remove such is contained in the written notice required by section 68-1622 of this article. All cost associated with the protection measures including, temporary removal, shall be the sole responsibility of the wireless provider. If the county fails in good faith to give notice of at least 120 days, it will not affect the county's rights under this subsection. In all cases, as much notice as possible should be provided, but less than 30 days' notice shall be prohibited. The county will provide the wireless provider with a date by which its equipment must be protected or removed.
b. The wireless provider may request a modification of the county procedures for carrying out reconditioning work in order to reduce the interference with wireless provider's operation of its communications facility. If the county agrees to the modification, the wireless provider shall be responsible for all reasonable incremental cost related to the modification.
c. The county shall provide wireless provider with at least 120 days written notice of any replacement work before the county may remove the wireless providers communications facilities. The county shall also promptly notify the wireless provider when the county poles have been replaced and the wireless provider may re-install its equipment. During the replacement work, the wireless provider may maintain a temporary communications facility on the property or, after approval by the county, on any land owned or controlled by the county in the vicinity of the property. If the property will not accommodate the wireless provider's temporary communications facility or if the parties cannot agree on a temporary location, the wireless provider, at its sole option, shall have the right to suspend the applicable permit until the replacement pole is installed, upon 30 days written notice to the county.
(m) For any collocation to county poles in the right-of-way, the county shall provide a good faith estimate for any make-ready work necessary to enable the county pole to support the proposed facility including replacement of the pole if necessary, within 60 days after receipt of a completed application requesting attachment to the county pole. Alternatively, the county may require the wireless provider to perform the make-ready work and so notify the wireless provider within the 60 day period. If the wireless provider or its contractor performs the make-ready work it shall indemnify the county for any negligence by the wireless provider or its contractor in the performance of such make-ready work and the work shall comply with applicable law. If the county opts to perform the make-ready work itself, it shall complete the work including any pole replacement within 90 days of written acceptance of the good faith estimate by the wireless provider. Such acceptance shall be signified by payment via check or other commercially reasonable and customary means specified by the county. The county may require that the replaced county pole have the same functionality as the pole being replaced.
If the county pole is replaced, the county shall operate county fixtures on the pole and, absent an agreement to the contrary between the county and the wireless provider that is confirmed in writing, the county shall take ownership of the new pole.
(n) If the wireless provider fails to relocate a support structure or pole or fails to provide a written good faith estimate of the time needed to relocate a support structure or pole within the time period proscribed in subsection 68-1622(1) of this article, the county shall have the right and privilege, after providing the wireless provider at least ten days' written notice, to cut power to or move any support structure or pole located within the right-of-way as the county may determine to be necessary, appropriate or useful in order to commence work on the public project.
(o) Abandonment:
(1) If a wireless provider decides to abandon any small wireless facility, support structure or pole, it shall notify the county in writing as soon as practicable but no later than 30 days prior to the abandonment.
Following receipt of such notice, the county shall direct the wireless provider in writing to remove all or any portion of the small wireless facility, support structure or pole if the county determines that such removal will be in the best interest of the public safety and public welfare. If the provider fails to remove the abandoned small wireless facility, support structure or pole within 90 days after such notice, the county may undertake to do so and recover the actual and reasonable expenses of doing so from the wireless provider, its successors or assigns plus a penalty not to exceed $500.00. The county may suspend the ability of the wireless provider, its successors or its assigns, as applicable, to receive any new permits from the county until the wireless provider, its successors or its assigns, as applicable, have paid the amount assessed for such removal costs and the penalty assessed, if any; provided, however, that the county shall not suspend such ability of any applicant that has deposited the amount in controversy in escrow pending an adjudication of the merits of the dispute by a court of competent jurisdiction.
(2) A small wireless facility that is not operated or a support structure or pole that is not utilized for a continuous period of 12 months shall be considered abandoned and the owner of such wireless facility, support structure or pole shall remove such within 90 days after receipt of written notice from the county notifying such owner of such small wireless facility, support structure or pole of the abandonment. The county shall send the notice by certified or registered mail, return receipt requested, to such owner at the last known address of such owner of the small wireless facility, support structure or pole. If the owner does not provide written notice that the small wireless facility has been out of operation or the support structure or pole has been utilized for a continuous period of 12 months or does not remove such small wireless facility, support structure or pole within the 90-day period, the county may remove or cause the removal of such small wireless facility, support structure or pole pursuant to the terms of its support structure or pole attachment agreement for county poles or through whatever actions are provided for abatement of nuisances or by other law for removal and cost recovery.
(p) If the county determines that a wireless provider's activity in a right-of-way pursuant to this article creates an imminent risk to public safety, the county may provide written notice to the wireless provider and demand that the wireless provider address such risk. If the wireless provider fails to reasonably address the risk within 24 hours of the written notice, the county may take or cause to be taken action to reasonably address such risk and charge the wireless provider the reasonable documented cost of such actions.
(q) The county may require a wireless provider to repair all damage to a right-of-way directly caused by the activities of the wireless provider while occupying, installing, repairing or maintaining small wireless facilities, poles or support structures in such right-of-way and to restore the right-of-way to its condition before the damage occurred pursuant to the competitively neutral and reasonable requirements and specifications of the county. If the wireless provider fails to return the right-of-way to the extent practicable in the reasonable judgment of the county to its condition prior to the damage within 90 days of receipt of written notice from the county, the county may, at the sole discretion of the county, restore the right-of-way to such condition and charge the wireless provider its reasonable, documented cost of doing so plus a penalty not to exceed $500.00. The county may suspend the ability of the wireless provider to receive any new permits from the county until the wireless provider has paid the amount assessed for such restoration costs and the penalty assessed, if any; provided, however, that the county shall not suspend such ability of any applicant that has deposited the amount in controversy in escrow pending an adjudication of the merits of the dispute by a court of competent jurisdiction.
(r) The county shall send any notice or decision required by this section 68-1622 of this article by registered or certified mail, statutory overnight delivery, hand delivery, or email transmission. The decision or notice shall be deemed delivered upon email transmission, deposit into overnight mail or regular mail receptacle with adequate postage paid or actual receipt if delivered by hand.
(Ord. of 12-21-2020) Sec. 68-1623. Activity in the right-of-way that is not subject to administrative review or not addressed by this article.
(a) Applications for any other uses that are not expressly set forth or referenced in this article shall require compliance with and issuance of a permit under applicable law. Without limiting the foregoing, any modification, maintenance, repair or replacement that is not set forth in section 68-1621(e) or this section or that is not eligible for administrative review under section 68-1622 of this article shall require compliance with, and issuance of a permit under the county's applicable law.
(b) The county shall not require a wireless provider to obtain a permit or any other approval or require fees or rates for the installation, placement, maintenance, operation or replacement of micro wireless facilities that are suspended on cables that are strung between poles or support structures in the right-of-way in compliance with applicable codes; provided, however, that the county may require a wireless provider to obtain permits for any additional activities such as electrical work, excavation or closure of sidewalks or vehicular lanes within the right-of-way if otherwise required by generally applicable law. Such permits shall be issued on a nondiscriminatory basis upon terms and conditions applied to any other person's similar activities in the right-of-way.
(c) The construction, installation, maintenance, modification, operation and replacement of wireline backhaul facilities in the right-of-way are not addressed by this article and any such activity shall comply with O.C.G.A.
Article 1 of Article 5 of Title 46 and other applicable law.
(d) The approval of the installation, placement, maintenance or operation of a small wireless facility pursuant to this article shall not authorize the provision of any communications services.
(e) This article shall not apply to the county to the extent that the county uses communications facilities to provide free wi-fi services to the public.
(Ord. of 12-21-2020) Sec. 68-1624. Duty of due care regarding activity in the right-of-way.
(a) An applicant in the right-of-way shall employ due care during the installation and maintenance process and shall comply with all safety and right-of-way protection requirements of general applicability set forth in applicable law.
(b) An applicant in the right-of-way shall not place any small wireless facilities, support structures poles, or decorative poles where they will interfere with any existing infrastructure or equipment, and shall locate its lines and equipment in such a manner as not to interfere unnecessarily with the usual vehicular or pedestrian traffic patterns or with the rights or reasonable convenience of owners of property that abuts any right-of-way.
(c) Nothing in this article relieves any person of any duties set forth in O.C.G.A. Article 9 of Title 25.
(Ord. of 12-21-2020) Sec. 68-1625. Historic districts.
(a) Notwithstanding anything to the contrary in this article within an historic district, an applicant may collocate a small wireless facility and may place or replace a pole only upon satisfaction of the following requirements:
(1) Issuance of a permit under subsection 68-1621(a) of this article; and
(2) The collocation and the pole must:
a. Comply with any objective, reasonable and nondiscriminatory aesthetic and structural requirements that have been made publicly available in writing by the county at least 30 days prior to submission of the application, provided however that any such requirements may not have the effect of materially inhibiting any provider's technology or service nor may compliance with any such requirements be considered a part of the small wireless facility for purposes of the size restrictions in the definition of small wireless facility; or
b. In the absence of any such requirements, a replacement pole must be substantially similar in height and appearance to the pole that is being replaced.
(Ord. of 12-21-2020) Sec. 68-1626. New poles in areas zoned for residential use.
(a) For applications for new poles in the right-of-way in areas zoned for residential use, the county may propose an alternate location in the right-of-way within 100 feet of the location set forth in the application, and the wireless provider shall use the county's proposed alternate location unless it imposes technical limits or significant additional costs. The wireless provider shall certify that it has made such a determination in good faith based on the assessment of a licensed engineer and it shall provide a written summary of the basis for such determination.
(Ord. of 12-21-2020) Sec. 68-1627. Decorative poles.
(a) Notwithstanding anything to the contrary in this article, an applicant may collocate a small wireless facility on a decorative pole or may replace a decorative pole with a new decorative pol, in the event the existing decorative pole will not structurally support the attachment only upon satisfaction of the following requirements:
(1) Issuance of a permit under subsection 68-1621(a) of this article.
(2) The collocation and the replacement decorative pole must:
a. comply with any objective and reasonable aesthetic and structural requirements that have been made publicly available in writing by the county at least 30 days prior to submission of the application, provided however that any such requirements may not have the effect of materially inhibiting any provider's technology or service nor may compliance with any such requirements be considered a part of the small wireless facility for purposes of the size restrictions in the definition of small wireless facility; or
b. in the absence of any such requirements, a replacement decorative pole must be substantially similar in height and appearance to the decorative pole that is being replaced.
(b) The county shall operate county fixtures on the replaced decorative pole and, absent an agreement to the contrary between the county and the wireless provider that is confirmed by email or other writing, the county shall take ownership of the new decorative pole.
(Ord. of 12-21-2020) Sec. 68-1628. Areas designated solely for underground or buried facilities.
(a) A wireless provider shall comply with reasonable and nondiscriminatory requirements that prohibit communications service providers and electric service providers from installing poles in a right-of-way in an area designated solely for underground or buried facilities of communications service providers and electric service providers where the county:
(1) Has required all such facilities other than light poles and attachments to be placed underground and all such undergrounding has been completed prior to the submission of the application or, for rights-ofway where such facilities other than light poles and attachments have not been deployed, has in effect a reasonable and nondiscriminatory zoning or development ordinance or regulation that requires such facilities other than light poles and attachments to be placed underground;
(2) Does not prohibit the replacement of light poles or the collocation of small wireless facilities in the designated area and
(3) Permits wireless providers to seek a waiver of the underground requirements for the placement of a new pole to support small wireless facilities, which waivers shall be addressed in a nondiscriminatory manner and consistent with applicable law.
(b) If the county adopts undergrounding requirements, those requirements shall:
(1) Allow a wireless provider to maintain in place any previously collocated small wireless facilities subject to any applicable pole attachment agreement; or
(2) Either allow the wireless provider to replace the pole associated with previously collocated small wireless facilities at the same location or propose an alternate location within 50 feet of the prior location, which the wireless provider shall use unless such alternate location imposes technical limits or significant additional costs.
(Ord. of 12-21-2020) Sec. 68-1629. Processing of applications that are subject to administrative review.
(a) An applicant may submit a single consolidated application provided that such a consolidated application shall be for a geographic area no more than two miles in diameter and must comply with this article. The denial of one or more small wireless facilities or poles in a consolidated application shall not delay the processing of any other small wireless facilities or poles in the same application. The county may issue a single or multiple permits for the small wireless facilities and poles in a consolidated application.
(b) For Class II Authorities as defined in O.C.G.A. § 36-66(C) "Streamlining Wireless Facilities and Antennas Act":
(1) A consolidated application for the placement of new poles and the collocation of one or more small wireless facilities on such new poles may include no more than five poles and any associated small wireless facilities. While an applicant has applications, including consolidated applications, pending before the county for review of 15 or more new poles and the collocation of associated small wireless facilities, the county may, but shall not be required to, toll the processing requirements under this article for any application subsequently submitted by the same applicant for the placement of new poles and the collocation of associated small wireless facilities; and
(2) A consolidated application for the collocation of small wireless facilities on existing poles or support structures may include no more than 15 sites. While an applicant has applications, including consolidated applications, pending before the county for review of 45 or more sites for the collocation of small wireless facilities on existing poles or support structures, the county may toll the processing requirements under this article for any application subsequently submitted by the same applicant for the collocation of small wireless facilities on existing poles or support structures.
(c) For purposes of subsection 68-1629(b) of this article:
(1) Small wireless facilities and poles that a wireless services provider applicant has requested a third-party to deploy and that are included in a pending application by the third-party shall be counted as pending requests by the wireless services provider applicant; and
(2) When the processing of an application is tolled under subsection 68-1629(b) of this article, it is no longer counted as pending. As processing of applications is completed, the county will begin processing previously tolled applications in the order they were submitted, unless the applicant specifies a different order.
(Ord. of 12-21-2020) Sec. 68-1630. Multiple applications for the same location.
If multiple applications are received by the county to install two or more poles or decorative poles at the same location or to collocate two or more small wireless facilities on the same pole, decorative pole or support structure, the county shall resolve conflicting requests in an appropriate, reasonable and nondiscriminatory manner.
(Ord. of 12-21-2020) Sec. 68-1631. Services unrelated to collocation.
Absent an agreement to the contrary that is made public and that is available for adoption upon the same terms and conditions to any requesting wireless provider, the county shall not require an applicant to perform services unrelated to the collocation for which approval is sought, such as in-kind contributions to the county, including reserving fiber, conduit or space on a utility pole or a wireless support structure for the county and the county may not require an applicant to transfer small wireless facilities, poles, decorative poles or support structures to the county, provided that the county may require transfer of a county pole replaced by the applicant to accommodate its collocation.
(Ord. of 12-21-2020) Sec. 68-1632. Indemnification.
(a) The county shall not require a wireless provider to indemnify and hold the county and its officers and employees harmless against any claims, lawsuits, judgments, costs, liens, losses, expenses or fees arising from the wireless provider's activities in the public right-of-way under this Article, except when a court of competent jurisdiction has found that the negligence of the wireless provider while conducting such activities caused the harm that resulted in such claims, lawsuits, judgments, costs, liens, losses, expenses or fees or to require a wireless provider to obtain insurance naming the county or its officers and employees an additional insured against any of the foregoing.
(b) In no event shall the county or any officer, employee or agent affiliated therewith, while in the performance of its or his or her official duties, be liable for any claim related to the siting, installation, maintenance, repair, replacement, relocation, permitting or location of wireless equipment, facilities, poles or infrastructure including, but not limited to, any claim for destruction, damage, business interruption or signal interference with other communications service providers wherein such siting, installation, maintenance, repair, replacement, relocation, permitting or location was undertaken in substantial compliance with this article.
(Ord. of 12-21-2020) Secs. 68-1633—68-1700. Reserved.
Chapter B.
(Ord. of 12-21-2020) Sec. 68-1714. Preliminary plat review.
(a) The administrative officer or his designee shall check the plat for compliance with these and other relevant county regulations and ordinances and report findings and recommendations to the planning commission in public session.
(b) No preliminary plat shall be reviewed by planning commission except in public session. The administrative officer is not empowered to act or speak for the planning commission in approving or disapproving preliminary plat requests.
(c) Planning commission shall not review the preliminary plat or hear public comments unless the applicant or a designated representative with written authorization is present at the hearing. If the applicant or approved representative is not in attendance, the 60-day requirement in subsection (f) below is automatically waived for an additional 61 days.
(d) After conducting the public hearing as specified in subsection 68-1712(b)(10), the planning commission shall make one of the following decisions which shall be recorded in the minutes:
(1) Approve the preliminary plat.
(2) Approve the preliminary plat on condition that necessary modifications be made. Such required modifications must be recorded on the plat and in the minutes.
(3) Disapprove the preliminary plat.
(e) If the planning commission approves the preliminary plat, it shall be noted by a certificate of preliminary plat approval (see section 68-1715) inscribed on two copies of the preliminary plat and distributed as follows:
(1) One annotated copy of the plat shall be returned to the subdivider or agent.
(2) One copy permanently filed in planning commission records.
(f) Plats not acted on by planning commission within 60 days of request for approval shall be deemed approved by the planning commission. If, however, planning commission determines that additional time is required to study a preliminary plat, an extension of time shall be requested in writing from the subdivider, who may agree to a specific time extension in lieu of a denial.
(Ord. of 12-21-2020) Sec. 68-1715. Parameters of preliminary plat approval.
(a) All preliminary plat approvals shall be limited by these qualifications:
(1) The approval is a tentative approval only pending submission of a final plat.
(2) The approval is valid for only one year from the issuance of a land disturbance permit or two years from the date of preliminary plat approval, whichever is the lesser, and shall be null and void after that date. If final plat approval is not received before the expiration of the preliminary plat, a new preliminary plat application shall be required.
(3) Exception: One extension of the land disturbance permit for good cause shown and for a maximum time period not to exceed the life of the preliminary plat approval may be granted when requested as follows:
i. In writing prior to the expiration of the preliminary plat approval.
ii. Must be filed with the planning and development department.
iii. The developer shall have the burden of proof and/or justification of a need for the extension.
(b) Preliminary plat approval does not constitute authorization for subdivider to begin physical improvement to the property being subdivided but rather the authority to:
(1) Prepare and submit road and infrastructure construction plans;
(2) Erosion and sedimentation plans for approval;
(3) To request land disturbance permit(s); and
(4) All required permits to construct only one model house.
(c) Plats of developments within municipalities where this chapter has not been adopted shall have the following certificate attached: "This plat of land within the city limits of is not subject to regulation by the Habersham County Planning Commission."
(d) Major changes to preliminary plats necessitate that the plat be resubmitted to the planning commission for review and approval. No final plat will be approved that does not substantially comply to the approved preliminary plat. Major changes would be changing the street configuration, location of uses, number of lots and similar changes.
(Ord. of 12-21-2020) Sec. 68-1716. Land disturbance permit application.
The land disturbance permit application shall conform to and meet the specifications contained in article XII of this chapter.
(Ord. of 12-21-2020) Sec. 68-1717. Final plat specifications.
The final plat shall conform to and meet the specifications contained in chapter B and contain the following:
(a) A surveyor's certification directly on the final plat. See Chapter A, Form 4.
(b) An owner's certification directly on the final plat. See Chapter A, Form 5.
(c) Certificate of dedication. See Chapter B.
(d) A certificate of approval of the final plat by the planning commission directly on the plat. See Chapter A, Form 3.
(Ord. of 12-21-2020) Sec. 68-1718. Final plat review and approval.
(a) The planning department staff shall check the plat for conformance with the approved/conditionally approved preliminary plat and for compliance with this and other relevant county regulations and ordinances and report their findings with their recommendation to the Habersham County Planning Commission in public session. The planning department, upon review of the final plat, shall notify the applicant of any comment that needs to be addressed no later than ten working days prior to the next scheduled planning commission meeting. Each comment shall be referenced to the applicable section of code being commented upon.
(b) No final plat shall be acted upon by the Habersham County Planning Commission except in public session. The administrative officer is not empowered to act or speak for the Habersham County Planning Commission in approving or disapproving final plat requests.
(c) The Habersham County Planning Commission shall take no action on a final plat if the applicant or a designated representative is not present at the hearing, in which case the 45-day requirement in subsection (f) below is automatically waived for 46 days.
(d) At a public hearing conducted under the procedures of subsection 68-1712(b)(10) within 45 days of request for final plat approval, the Habersham County Planning Commission shall take one of the following actions which shall be recorded with reasons for disapproval, where appropriate, in the minutes:
(1) Approve the final plat.
(2) Disapprove the final plat and further notify the subdivider in writing of the specific reasons for disapproval within five days.
(e) In order for the Habersham County Planning Commission to approve a final plat, all requirements of these regulations must have been satisfied and all improvements required must have been completed not less than five workdays prior to the scheduled hearing at which final plat approval is requested. All improvements shall be inspected by the planning department.
No final plat will be approved that does not substantially comply with the approved preliminary plat.
(f) Plats not acted on by the Habersham County Planning Commission within 45 days of a request for approval shall be deemed approved, and a certificate of final plat approval shall be issued on request of the subdivider.
If, however, the Habersham County Planning Commission determines that additional time is required to study a final plat, an extension of time shall be requested in writing from the, applicant or their duly authorized agent who may agree to a specific time extension in lieu of a plat disapproval.
(g) If final plat approval is requested two times and is denied both times because required improvements have not been made, the Habersham County Planning Commission shall not further consider that plat for 90 days following date of the second disapproval.
(h) When all conditions for approval of the final plat have been met and such approval has been granted, the Habersham County Planning Commission shall endorse and date the certificate of final plat approval on the original copy of the final plat. Such approval and endorsement convey the authority to record the plat and to sell lots shown on the plat.
(i) Upon approval of a final plat, the subdivision owner shall have the final plat recorded in the office of the clerk of the superior court of Habersham County.
(Ord. of 12-21-2020) Sec. 68-1719. Reserved.
Sec. 68-1720. General design and other requirements.
(a) Suitability of the land: Land subject to flooding, improper drainage or erosion or that is for topographical or other reasons unsuitable for residential use that will contribute to danger to health, safety or property destruction unless the hazards can be and are corrected. No land determined to fall in a 25-year floodplain identified by state or federal authority shall be approved for any building site. All land falling into the 100-year flood zone must be so identified on the preliminary and final plats.
(b) Name of subdivision: The name of the subdivision must have approval of the planning commission. The name shall not duplicate or closely approximate the name of an existing subdivision in the county.
(c) Conformance to adopted major thoroughfare and other plans: All streets and other features of the major thoroughfare plan of Habersham County, Georgia shall be platted by the subdivider in the location and to the dimension indicated on the major thoroughfare plan. When features of other plans such as schools or public building sites, parks or other land for public uses are located in whole or in part in a land subdivision, such features shall be either dedicated or reserved by the subdivider for acceptance or acquisition within a reasonable time by the appropriate public agency. Whenever a plat proposes the dedication of land to public use that the planning commission finds not required or suitable for such public use, the planning commission shall refuse to approve the plat and shall notify the governing body of the reasons for such action.
(d) Special easements: Easements having a minimum width of 18 feet and located along the side or rear lot lines shall be provided as required for utility lines, underground mains and cables. Where a watercourse, drainage way, channel, or stream traverses a subdivision, there shall be provided a storm water or drainage right-of-way of adequate width parallel to streets. When suitable road shoulder slopes cannot be obtained within prescribed road right-of-way widths, slope easements shall be required on abutting lots.
(Ord. of 12-21-2020) Sec. 68-1721. Reservation of public sites and open spaces.
(a) Where the features of the comprehensive plan such as school sites, parks, playgrounds and other public spaces are located in whole or in part in a proposed subdivision, such features shall be reserved by the subdivider, provided, however, that no more than ten percent of the total area of the subdivision shall be required for reservation to fulfill the requirements of this section. Whenever the land required for such planned features is not dedicated to and accepted, purchased, acquired, optioned or condemned by the appropriate public agency within a two-year period from the date of recording the subdivision plat or by the time that at least 75 percent of the lots are built on and occupied, whichever is sooner, the subdivider may claim the original reservation and cause it to be subdivided in a manner suitable to the subdivider subject to the provisions of this chapter. Whenever the public body responsible for land acquisition executes a written release stating that the reserved land is not to be acquired, the planning commission shall waive the reservation requirements. When a development is of such size or of a nature which will have a significant impact on community facilities, the dedication of an appropriate amount of land to meet such needs may be required by the planning commission.
(b) Whenever the planning commission finds that proposed reservation of land or dedication of land for public use is not required or suitable for such public use, it may require the rearrangement of lots to include such land.
(c) In all subdivisions, due regard shall be shown for all natural features such as large trees and water courses as well as for historical sites and similar community assets. These, when preserved, will add attractiveness and value to the property or community.
(Ord. of 12-21-2020) Sec. 68-1722. Design standards for blocks and lots.
(a) Block lengths and widths: Block lengths and widths shall be as follows:
(1) Blocks shall be no greater than 1,800 feet nor less than 600 feet in length, except in unusual circumstances.
(2) Blocks shall be wide enough to allow two tiers of lots, except where fronting on arterial, limited access highways or railroads or prevented by topographical conditions or size of property. In these cases, the planning commission may approve a single tier of lots of minimum depth (see section 68-1719) to include a buffer zone.
(b) Lot sizes and proportions: Residential lots shall meet the lot width and lot area requirements in section 68-607.
(c) Commercial and industrial lots shall be adequate to provide service areas and off-street parking suitable to use intended.
(d) Residential corner lots shall have adequate width to meet building setback requirements from both abutting streets.
(e) Adequate building sites: Each lot shall contain an adequate building site not subject to flooding and outside the limits of any existing easements, buffers or building setback lines required by this chapter.
(f) Lot line arrangements: When practical, side lot lines shall be at right angles to straight street lines or radial to curved street lines.
(g) Panhandle or flag lots: "Panhandle" or "flag" lots of required width and area may be allowed where terrain or geometry makes standard design or frontage impossible or impractical. Where such lots are allowed, the street frontage of each panhandle access shall not be less than 60 feet wide and the panhandle access shall be not more than 200 feet long. The lot shall conform to all other lot standards of this chapter. Not more than two such panhandle access points shall abut each other. All such access points or combinations thereof shall be separated from each other by the frontage of a standard lot required under the other provisions of this chapter.
(h) Building setback lines:
(1) Building setback lines shall be indicated on each plat as set forth in section 1108 of this chapter. Corner lot setbacks shall conform to each right-of-way on which the lot fronts.
(2) In the case of electric transmission lines where easement widths are not definitely established, there shall be a minimum building setback line from the center of the transmission line as follows:
Voltage of Line Minimum Building Setback 600V—45KV 15 feet 46KV—115KV 50 feet 116KV and over 75 feet
(i) Double frontage lots: Double frontage lots should be avoided except where essential to provide separation of residential development from major traffic arteries or to overcome specific disadvantages of topography and orientation. A planting screen easement of at least ten feet, and across which there shall be no right of access, shall be provided along the line of lots abutting such a traffic artery or other disadvantageous use.
(Ord. of 12-21-2020)
DIVISION 3. ROADWAYS, STREETS, AND RIGHT-OF-WAY STANDARDS Sec. 68-1723. Requirements for streets and other rights-of-way.
(a) Continuation of existing streets: Existing streets shall be continued at the same or greater width but in no case less than the required width.
(b) Street names: Proposed streets that are obviously in alignment with others already existing and named shall bear the names of existing streets.
In no case shall the name for proposed streets duplicate existing street names regardless of the use of the suffix: street, avenue, boulevard, drive, place, way or court. Through its index list of street names on file, the planning commission can assist the subdivider in avoiding duplication.
(c) Street jogs: Street jogs with centerline offsets of less than 185 feet shall not be permitted.
(d) Cul-de-sacs or dead-end streets:
(1) Minor streets or courts designed to have one end permanently closed shall serve no more than 25 lots per block and have a turn-around or cross street every 1,000 feet unless necessitated by topography. They shall be provided with a turnaround at the closed end.
(2) Where in the opinion of the platting authorities it is desirable to provide street access to adjoining property, streets shall be extended to the boundary of such property and provided with a temporary turnaround.
(e) Single entry road restriction: In no case shall more than 100 lots in any subdivision be dependent on a single road or interval of road for entry/exit to/from the subdivision.
(Ord. of 12-21-2020) Sec. 68-1724. Development along major thoroughfares, limited access highway or railroad right-of-way.
Conditions and standards for land development within Habersham County shall be assigned in accordance with the type of road or street access provided to the properties. All roadways within the county shall be classified based according to Georgia Department of Transportation and Federal Highway Administration guidelines. The classifications shall be outlined within the county's Comprehensive Plan and updated at a minimum of every five years.
(a) Lots shall have no access to an arterial road, expressway or other limited access highway but only to rural minor access or residential streets. Where a subdivision abuts or contains an arterial, a limited access highway or a railroad right-of-way, the platting authorities shall require street approximately parallel to and on each side of such right-of-way either as a marginal access street or at a distance suitable for an appropriate use of the intervening land with a ten-foot, non-access reservation suitably planted. Due regard should be given requirements for approach grades and future grade separations in determining distances.
(b) Alleys: Alleys may be required at the rear of all lots used for multi-family, commercial or industrial developments but shall not be provided in one- and two-family residential developments unless the subdivider provides evidence satisfactory to the platting authorities of the need for alleys.
(c) Street right-of-way and roadway pavement widths: The right-of-way width shall be the distance across a street from property line to property line. All subdivision streets, public or private, shall be platted as right-of-way streets. Lots shall not include any portion of the right-of-way. All streets shall be evaluated according to performance within specific site requirements or limitations. No street shall be platted on the basis of a private easement.
(d) Minimum street right-of-way widths shall be as follows:
1. Rural minor and urban residential.
Right-of-way Minimum of 60 feet Turnarounds (Cul-de-sacs) 100 feet in diameter (50-foot radius) Roadbed Minimum of 28 feet (pavement width plus shoulder width) Turnarounds (Cul-de-sacs) 88 feet in diameter (Pavement width plus shoulder width) Pavement Minimum of 20 feet
Turnarounds (Cul-de-sacs) 80 feet in diameter (40-foot radius)
2. Within curb and gutter subdivisions.
Right-of-way Minimum of 40 feet Turnarounds (Cul-de-sacs) 100 feet in diameter (50-foot radius) Roadbed Minimum of 24 feet (pavement width plus shoulder
width) Turnarounds (Cul-de-sacs) 84 feet in diameter (Pavement width plus shoulder width)
Pavement Minimum of 20 feet Turnarounds (Cul-de-sacs) 80 feet in diameter (40-foot radius)
3. Collectors and rural major.
Right-of-way Minimum of 80 feet Roadbed Minimum of 30 feet (Pavement plus shoulder width) Pavement Minimum of 22 feet
4. Rural arterial system.
Right-of-way Minimum of 80-150 feet, depending on traffic conditions to be reviewed at time of development application
Roadbed Minimum of 38 feet (Pavement plus shoulder width) Pavement Minimum of 28 feet
5. Alleys, 16 feet right-of-way.
6. One-way streets.
Right-of-way 30 feet Roadbed 22 feet Pavement Width 14 feet
(e) Additional width on existing streets: Subdivisions that adjoin existing streets shall dedicate or reserve right-of-way to meet the above minimum street width requirements.
(1) The entire right-of-way shall be provided where any part of the subdivision is on both sides of the street.
(2) When the subdivision is located on one side of an existing street, one-half of the required right-of-way measured from the centerline of the existing roadway, shall be provided.
(f) Street grades: Maximum and minimum street grades shall be as follows:
(1) Rural arterial, not in excess of ten percent.
(2) Rural major and collector streets, not in excess of 18 percent.
(3) Rural minor routes, residential streets and alleys, not in excess of 16 percent.
(4) No more than 25 percent of the total square feet of pavement within a subdivision may be applied to a grade of 18 to 16 percent.
(5) No street grade shall be less than one-half of one percent in cases where streets are curbed and guttered.
(6) In meeting these grade and slope requirements on steep terrain, the planning commission suggests wherever feasible that the developer utilize a divided roadway in which the lanes for travel in opposite directions are cut at different levels of elevation. Under certain conditions, this method of giving separate treatment to each travel lane would lessen cut and fill requirements. Median cuts would be used at points where both lanes have the same roadway grade. The median cuts would shorten distance of
traveling any one direction and facilitate access to lots served by each lane.
(g) Horizontal curvature: The minimum radii of centerline curvature shall be as follows:
(1) Arterial streets as indicated on the road classification map, but in no case less than 800 feet.
(2) Collector and rural major streets, 300 feet.
(3) Rural minor and residential streets and alleys and other lower classification rural roads (industrial/commercial access, agricultural access, recreation and scenic, resource recovery), 100 feet.
(4) Exceptions may be granted based on proven performance for special site requirements.
(h) Tangents: Between reverse curves, there shall be tangent having a length not less than the following:
(1) Minor arterial streets, not less than 200 feet.
(2) Collector and rural major streets, 100 feet.
(3) Rural minor, residential streets and alleys and other lower classification rural roads (industrial/commercial access, agricultural access, recreation and scenic, and resource recovery), 25 feet.
(i) Vertical alignment: Vertical alignment shall be such that the following requirements are met:
(1) Rural arterial streets shall have a sight distance of at least 500 feet at four feet above ground level. (10 × the speed limit or 10 × the algebraic distance, per DOT/AASHTO.)
(2) Rural major and collector streets shall have a sight distance of at least 200 feet at four feet above ground level.
(3) Rural minor, residential streets and alleys and other lower classification rural roads (industrial/commercial access, agricultural access, recreation and scenic, and resource recovery) shall have a sight distance of at least 100 feet at four feet above ground level.
(4) Rural arterial streets shall have a sight distance of at least 500 feet at four feet above ground level.
(5) Local rural routes, 75 feet at four feet above ground level.
(j) Street intersections: Street intersections shall be as nearly at right angles as possible. No street intersection shall be at an angle of less than 75 degrees, unless required by unusual circumstances.
(k) Curb-line radii: Property lines at street intersections shall be rounded with a curb radius of 20 feet. Where the angle of intersection is less than 75 degrees, the platting authorities may require a greater radius.
The platting authorities also may permit comparable cut-offs or chords in place of rounded corners.
(l) Steep slope development: Street alignments are subject to performance standards as are appropriate to Habersham County and state construction requirements as may be adjusted to any given site limitations.
Driveways and roads coming into a county road shall observe at a minimum a 25-foot deep area with a slope of no more than two percent at the intersection with the county right-of-way. No storm water shall run out onto the county road from a subdivision or individual lot or parcel. Storm water runoff coming from driveways shall be diverted into ditches and away from the county road.
(Ord. of 12-21-2020) Sec. 68-1725. Development/project access improvements.
Single-family detached, single-family attached, duplex residential subdivisions, multi-family and nonresidential development: When property that abuts upon an existing or proposed county road is to be developed or redeveloped as a single-family detached or duplex subdivision, multi-family and nonresidential development and the county road will provide access to the property, access improvements to the county road (turn lanes, etc.) shall be provided by the developer as provided herein:
(a) Design criteria shall be in accordance with the requirements of this document or the latest edition of the Georgia Department of Transportation's "Regulations for Driveway and Encroachment Control."
(b) A right turn deceleration lane shall be required at each subdivision of 25 lots or more and commercial or private industrial project creating more than 50 trips per day with a road/street intersecting with a public road. Right turn deceleration lanes shall have a minimum length of 150 feet with an additional 50 feet taper length. Pavement width shall be 18 feet (exclusive of curb and gutter) if curb and gutter is required.
The design thickness of the base and pavement structure shall include eight-inch compacted graded aggregate base course, four-inch compacted asphalt concrete binder and two-inch compacted asphalt concrete "E" or "F" surface course. Additional right-of-way, if required, to accommodate the right turn deceleration lane and shoulder width to match the existing county road (in no case less than a four-foot wide shoulder) shall be acquired and dedicated by the developer to Habersham County at no cost. Associated drainage improvements as deemed necessary by the construction of the right turn deceleration lane shall be required.
(c) In the event a developer desires to construct a median break to serve the subdivision, a left turn lane leading to the median break shall be required to be provided by the developer and shall meet the standards contained in the GDOT "Standards Specifications Manual" and "Regulations for Driveway and Encroachment Control," current editions.
(d) Other access improvements may be required by the county upon the recommendation of either GDOT or the county engineer in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public.
(e) The developer shall be responsible for the relocation of public or private utilities and drainage structures as may be occasioned by the required access improvements.
(f) Subdivision street intersections with county maintained roads shall be located to provide adequate sight distance. Minimum intersection sight distances are criteria provided in Table (A) of this subsection.
The line of sight establishes the boundary of a sight triangle within which there should be no sight obstruction between the heights of 30 inches and 108 inches. No plants or shrubs shall be planted in this area that grows to a height greater than 30 inches. The sight distance criteria are based on the average time required for a vehicle to make a left or right turn from a stop controlled approach to the public road (AASHTO Case B1 and B2). The time to execute the maneuver is based on recommendations contained in NCHPR Report 383, Intersection Sight Distance. The sight distances for a two-lane road are the distance traveled at the posted speed limit during the average of 6.5 and 7.5 seconds. See ASSHTO Green Book, chapter 9 Intersections, for adjustments due to grades greater than three percent and design vehicle other than passenger cars. The developer's engineer shall certify that sight distance requirements are in accordance with table
(A) and so state on the preliminary plans at the time of submittal.
(g) A traffic impact study by the developer's engineer at the preliminary stage when any new road or street is created that abuts/adjoins a public road/street for all developments creating more than 50 trips per day.
(Ord. of 12-21-2020) Sec. 68-1726. Structures on right-of-way.
Right-of-way encroachment—mailboxes and other structures: This section applies to all arterial, collector and minor roads as defined herein.
(a) Mailboxes, county right-of-way:
(1) A mailbox that does not conform to the following provisions is an encroachment and shall be removed within 60 days of notification of the violation:
a. For noncompliance mailbox structures not moved within the 60-day notification period, such removal shall be performed by Habersham County at the expense of the structure owner.
b. Habersham County will assume no liability for damage that may occur in normal maintenance operations for any mailbox not conforming to the standards stated in subsections (1) through (3).
(2) No mailbox support shall be allowed to exist on Habersham County's right-of-way that interferes with the safety of the traveling public on the county road system. The mailbox shall be located in accordance with the rules and regulations set forth by the Highway Safety Administration.
a. The support or post shall not be made of a masonry nature or by any other material that will not readily yield upon impact.
b. Nor shall any other construction which could be classified as a hazardous fixed object be allowed, either as a support or as an encasement or housing for the box itself.
c. When using wood, the size shall be a maximum nominal four inch by four inch or, if round, the size will be a maximum of four inches in diameter.
d. If a metal post is to be used, no larger than three inches in diameter or equivalent shall be allowed and such posts shall be hollow.
e. When using other materials, the maximum size and configuration shall be determined and approved by the administrative officer prior to installation.
f. The face of the mailbox shall be no closer than three feet to the edge of the pavement on high-speed (establish threshold
speed) routes.
(3) Multiple mailbox installations shall meet the same criteria as single mailbox installations. Multiple support installations should have their supports separated a minimum distance equal to three-fourths of their heights above ground. This will reduce interaction between adjacent mailboxes and supports.
(b) Mailboxes—Subdivision roads with low traffic volume and speed: A mailbox that does not conform to the following provisions is an encroachment and shall be removed within 60 days of notification of the violation.
(1) Subdivision roads with low traffic volume and speed, shall comply with the following standard:
a. The supporting structure shall be as described in subsection 68-1726(a)(2) above.
b. The face of the mailbox shall be no closer than two feet to the edge of the pavement or one foot from the back of the curb.
(2) In the event that a request is made to place a subdivision road in the county maintenance system, all existing structures on rightof-way shall be brought into compliance with section 68-1726 of this chapter.
(c) Mailboxes—Existing structures on county-maintained roads: Singleentrance subdivision roads with a rural minor road classification that have existing brick or masonry mailbox structures will be allowed so long as they meet the following requirements:
(1) No portion of the mailbox or its structure shall be closer than two feet to the edge of pavement or one foot from the back of the curb.
(2) The planning commission reserves the right to review all existing mailbox structures on a case-by-case basis as requested.
(3) All undeveloped lots within a subdivision on a single entrance, low volume and low speed road shall conform to the specifications for mailbox structures defined in subsection 68-1726(a)(2) above.
(d) Other structures: Masonry or other type vertical walls that create a hazard will not be allowed on county rights-of-way. Existing masonry or other type walls built on driveways in the right-of-way will comply with the following regulations:
(1) Single entrance subdivision roads with a rural minor road classification that have existing brick, rubble or masonry driveway headwalls will be allowed so long as they meet the following requirements:
a. The wall shall not come within four and one-half feet of the edge of pavement.
b. The wall shall not extend above the existing driveway height without having adequate drain holes through the wall.
c. The overall height shall not exceed 18 inches above the driveway surface.
d. All undeveloped lots within a subdivision on a single entrance, low volume, low speed road shall conform to these same
specifications.
(2) Subdivision entrances with elaborate cosmetic structures of brick, masonry, or other materials forming an island shall conform to the following:
a. No structure shall extend beyond the right-of-way line of the adjoining street.
b. No structure shall extend vertically to a height that would impair visibility of adjacent vehicle traffic.
c. Structure walls must not lean or protrude over the adjacent pavement so as to hinder resurfacing or maintenance of the surface.
d. No structure shall be placed in conflict with utility facilities.
e. Structures placed in the middle of the cul-de-sac shall conform to all of the above specifications.
f. All structures must have some type of approved reflective device or be lit.
g. Any damage to existing structures during routine maintenance of the street will be the liability of the property owner.
(3) Exemption for new construction: Masonry or other type vertical walls may be built on driveways that are located in a platted subdivision on a "rural minor" road, defined herein and classified as a low volume, low speed, residential road that primarily serves the residents of the subdivision. A subdivision road or street that may be used as a cut through or connector road to a main road may not be considered a "minor" road. These structures must conform to the regulations as stated in this section. Habersham County does not accept maintenance responsibility for these vertical wall structures. The planning commission reserves the right to review all structures on a case-by-case basis as requested.
(e) Enforcement:
(1) Existing structures: It shall be the responsibility of the administrative officer to enforce the provisions of this section as it relates to existing structures. The administrative officer shall notify, in writing, property owners found to be in violation of this section. If the property owners fail to remove the structures(s) in violation within the time allowed by this section, the administrative officer is authorized to issue a citation to the property owner stating the nature of the violation, the cost to the property owner for removal and the time and date the matter will be reviewed by the board of commissioners. A copy of the citation shall be sent to the chief building inspector. The administrative officer shall refer the citation to the board of commissioners at its earliest regularly scheduled meeting. The board shall review the facts and if the property owner is found in violation, the administrative officer shall be authorized and directed to remove structures in violation and to bill the property owner the cost of removal.
(2) Enforcement (new construction): It shall be the responsibility of the administrative officer to enforce the provisions of this section as it relates to all new construction. In addition, the chief building inspector is directed and authorized to deny any and all construction permits for any property or to any property owner with a structure(s) in violation of this section as cited by the administrative officer.
(Ord. of 12-21-2020) Sec. 68-1727. Required improvements.
(a) Performance and specifications: Every subdivider shall be required to make the improvements outlined in this article in accordance with the specifications herein or otherwise adopted by Habersham County. The necessity for storm drainage on each site will be determined by inspection.
(b) Monuments: Monumentation shall be done as required by Georgia State Rules Section 108-7-05.
(c) Grading: All streets, roads and alleys shall be graded by the subdivider so that pavements and sidewalks, where required, can be constructed to the required cross section. The minimum width of grading shall be the pavement width as specified in Section 8-1724 plus eight feet on each side. Deviation from the above will be allowed only when due to special topographical conditions.
(1) Preparation: Before grading is started, that part of the right-of-way consisting of the area to be paved plus the shoulders shall be first cleared of all stumps, roots, brush and other objectionable materials and all trees not intended for preservation.
(2) Cuts: All boulders and other obstructions shall be removed to a depth of two feet below the subgrade. Rock, when encountered, shall be scarified to a depth of 18 inches below the subgrade. All vegetative debris, to include tree stumps and roots, must be removed from the site or may be burned in its entirety on site if burning complies with state rules and regulations.
(3) Fill: All suitable material from roadway cuts may be used in the construction of fills, approaches or at other places as needed. Excess materials including organic materials, soft clays, etc. shall be removed from the roadway. The fill shall be spread in layers not to exceed six inches loose and compacted by a sheepsfoot roller. The filling of utility trenches and other places not accessible to the roller shall be mechanically tamped.
(4) Subgrade: The subgrade shall be properly shaped, rolled and uniformly compacted to conform to the lines, grades and typical cross-sections as shown on drawings approved by the planning commission. Unsuitable materials shall be excavated and replaced with acceptable compacted material.
(d) Storm water management plan: This section is to formulate a plan to manage storm water runoff so that storm water hazards are not created and existing runoff-related problems are not exacerbated either upstream or downstream from or within the boundaries of the development. The storm water management plan will consist of a storm water report and construction documents (if applicable) to meet the minimum requirements set forth in this section.
(1) A storm water management plan shall be submitted with the request for land disturbance permit stage and shall contain the following information:
a. Location of proposed drainage-ways, streams and sediment ponds within the development.
b. Location, size and invert elevations of proposed drainage structure including culverts, bridges, pipes, drop inlets and top elevations of headwalls, diversion ditches, etc.
c. Area of land contributing runoff to each drainage feature.
d. Location of easements and right-of-way for drainage ways and maintenance accesses therefore.
e. Typical improvement around drainage features and culverts, if any.
f. Direction of water flow throughout the subdivision and computed velocities at those points deemed necessary by the review agency staff.
g. Detailed engineering drawings on all impoundment structures, dams, sediment ponds, etc.
(2) A storm water management plan must be prepared for new development or redevelopment to any site that meets one or more of the following criteria:
a. A new development in which 5,000 square feet or greater of new impervious area is created or that involves the land disturbing activity of one acre of land or greater;
b. Land development activity on a redevelopment site that constitutes more than 50 percent of the site area for the entire site or increases the impervious area on site by more than 5,000 square feet.
(3) The following development activities may be exempt from a storm water management plan:
a. Developments that do not create the addition of 5,000 square feet of impervious surfaces or disturb more than one acre of land;
b. Individual single-family residential lots (single-family lots that are part of a subdivision or phased development project are not exempt);
c. Additions or modifications to existing single-family structures;
d. Agricultural and silvicultural construction is exempt.
(e) Storm water report: A storm water hydrology report shall be provided to ensure that the requirements and criteria in these regulations are being complied with and that opportunities are being taken to minimize postdevelopment storm water runoff impacts from the development. The storm water hydrology report shall identify the locations and quantities of storm water runoff entering and exiting the site for both existing and developed conditions. The report at a minimum shall consist of pre- and post-developed topographic drainage maps delineating study points, drainage basins, soil types, runoff coefficients/curve numbers and land cover. In addition, the report shall contain a brief narrative, a vicinity map, a chart summarizing the water runoff associated with the proposed development and supporting design calculations for any proposed storm water management facility (such as and including stage-storage or outlet rating curves and inflow and outflow hydrographs, pre- and post-developed hydrographs). Pond discharge locations shall be in defined drainage ditches or piped systems. If this is not possible, the hydrology report shall address the creation of concentrated flows where none had occurred previously. The design professional shall ensure that the addition of any storm water management facility within its watershed basin does not adversely affect downstream property owners or storm water drainage systems and structures. Storm water hydrology reports shall be conducted in accordance with the criteria established in this section and must be submitted with the stamp and signature of a professional engineer (PE) or a registered land surveyor (RLS) licensed in the State of Georgia.
(f) Storm water management facilities: Storm water management facilities shall be implemented to control post-developed storm water runoff. The facility shall be designed so that the peak release rates (when combined with all detention bypass areas) are equal to or less than the pre-developed runoff rates at the same location. The facility will be designed to control the two to 50-year storm events. The facility shall also provide the safe passage of the 100-year storm event while providing one foot of free board between the 100-year pond elevation and the top of the dam. A proposed storm water management facility must be accompanied by a set of construction documents signed by a design professional, depicting the location and layout of the proposed facility and provide details for the construction of the facility (ex., outlet structures, dams, positive drainage, other structural controls, etc.). All storm water facilities shall be enclosed by fencing and an access gate where the sides of the facility adjacent to the water are steeper than 3:1 and the depth of the water in the pond is greater than three feet. The owner of the property on which the facility is located shall be responsible for maintaining all storm water management facilities. A clean-out marker showing two-thirds volume level of the pond shall be designated on the outlet structure to facilitate in inspection of the facility. If it is determined that the facility is not hydraulically functioning as designed due to inadequate maintenance, the county may conduct inspections and maintenance on the facility and the owner will be responsible for all expenses involved. A 25-foot easement measured from the elevation of the 100-year storm event within the facility and a 25-foot access easement to the facility shall be provided to the county. The county shall notify the owner 24 hours prior to any inspection or maintenance work which involves accessing the easement. All storm water management facilities shall be designed in accordance with the criteria established in this section, and plans and reports must be submitted with the stamp and signature of a professional engineer (PE) licensed in the State of Georgia.
(1) The following may be exempt from storm water management facilities but must provide a hydrology report:
a. A residential subdivision that does not increase the runoff for the two to 50-year storm event by more than 0.1 cubic feet per second per acre. Designated open space areas, flood plains, wetlands, green space and any other areas that are not buildable, with an exemption for stream or creek buffers, may not be included in the hydrological analysis in determining if the subdivision meets this exemption. In addition, the lot sizes must be uniformly sized throughout the subdivision development.
b. Where development does not increase the storm water runoff by more than one cubic feet per second (cfs) for the two to 50-year storm event.
(2) Storm water conveyance pipes: All culverts, cross drain, storm sewers or other drainage facilities under the county's jurisdiction shall be designed to accommodate all runoff from its entire upstream drainage area and be based upon the 50-year storm event.
(3) An adequate drainage system, including necessary open ditches, pipes, culverts, intersectional drains, drop inlets, bridges, etc. shall be provided for the proper drainage of all surface water. Cross-drains shall be provided to accommodate all natural water flow and shall be of sufficient length to permit full width roadway (roadway is defined as the portion of a road or street within the limits of construction) and the required slopes. The culvert pipe size to be provided shall be determined based on an engineering study. In no case shall the pipe diameter for cross drain pipe be less than 18 inches. Side drain pipe (driveway, etc.)
shall not be less than 15 inches in diameter.
a. All pipe used for cross drains shall consist of one of the following:
i. Reinforced concrete pipe;
ii. Metal pipe with paved invert and coated with bituminous material;
iii. Aluminized coated pipe meeting ASSHTO Standard M274 and M36;
iv. Smooth interior corrugated polyethylene pipe not to exceed 36 inches in diameter meeting ASSHTO Standard M294.
b. Certificate executed as shown in Chapter A, Form 6.
(g) Installation of utilities and driveways: After grading is completed and approved and before any base is applied, all of the underground work, water mains, gas mains, etc., and all service crossings shall be installed completely and approved throughout the length of the road and across the flat section.
All driveways for houses as they are built shall be cut and drained from the right-of-way.
(h) Water supply system: Water mains within the subdivision must be provided with connections to each lot from a community water system controlled by EPD or public water system. Minimum diameter of water pipes shall normally be six inches. Fire hydrants must be provided at not more than 1,000 feet intervals whenever community or public water system is used. Required fire hydrants shall be served with adequate water volume and pressure as required by the fire chief and the governing body of Habersham County. If a municipal water supply is not available to the subdivision at the time of development of the subdivision, then the developer should provide an adequate water source and an adequate water storage facility. This shall be accomplished by the use of individual wells for each housing unit or by a community water system. Individual wells are the responsibility of the lot purchaser; however, the community (subdivision) or municipal water system shall provide a minimum flow of 400 gallons per day per lot, shall be sanitary, and shall have a minimum adverse pressure of 30 pounds per square inch at each lot in the subdivision.
(i) The community water system shall be approved by the Habersham County Health Officer or the Georgia Department of Natural Resources, Water Supply Section and a letter of approval shall accompany the recording permit application.
Water distribution plan: A water distribution plan shall be provided for all developments providing a community water supply system, regardless of the provider/municipality. All designs shall meet the Habersham County Water Main Standards or the state requirements, whichever is more stringent. It shall contain the following information:
(1) Location and size of water distribution system, including pipes, valves, fittings, hydrants, high pressure pumping equipment, pressure reducing valves, etc., complete to individual lots
(2) Location and size of all wells, storage tanks and lift stations
(3) A water supply system letter of approval from environmental health or the Department of Natural Resources, Water Supply Section, shall be attached.
(j) Sanitary sewers: If the sewage disposal facilities cannot be connected to a trunk line sewer at the time of the development of the subdivision, septic tanks or another approved method of treatment of sanitary sewerage shall be installed by and at the expense of the subdivider or lot purchaser for interim use in conformity with the requirements of the county health department.
Plans shall be reviewed by the appropriate municipality or county facility accepting the waste. Further, approved sanitary sewage methods other than septic tanks shall include the maintenance and ownership agreements and requirements explained in detail. In addition, once the proposed plans are approved by a municipality, the building and planning department shall review and approve the plans for installation on county right-of-way. A sanitary sewer plan shall be provided for those developments offering such service. See Chapter A, Form 2.
(k) Street and alley improvements:
(1) Required streets shall be either public streets or private streets, all platted with right-of-way specified in section 68-1723. All streets must be paved to meet specifications in sections 68-1724 and 1727 below in order to qualify for final plat approval by the planning commission or acceptance for maintenance by the county governing body as public streets.
(2) Asphalt paving and curb and gutter required: All streets within subdivisions with any lot 1.5 acre or less in size or slope of five percent shall be paved with asphalt per subsection (m) below and provided with curbs and gutters constructed with either pre-cast concrete curb or integral concrete curb and gutter conforming to the dimensions and standards in the adopted standard drawings. Driveways shall require curb cuts.
(3) Street signs, signals, markings or other traffic control devices: All street signs, signals, markings or other traffic control devices on public or private streets shall conform to the Manual for Uniform Traffic Control Devices (MUTCD) as adopted by the Georgia Department of Transportation, as required by O.C.G.A. § 32-6-50(a).
(l) Base: The base course shall consist of compacted and graded aggregated crushed stone or other approved material having a minimum thickness after being thoroughly compacted of six inches on all rural minor and residential streets regardless of the type pavement wearing surface used.
(1) Base and pavement structure for collectors, rural major, other rural roads, arterial roads, and streets shall be designed based on projected traffic and use. Commercial and/or industrial streets and roads shall be designed by a registered engineer according to the projected loads and weight capacities for the project but in no case shall be no less than eight inches compacted base course and two inches asphaltic concrete surface binder with a one and one-half inch asphalt concrete surface course. Residential streets and roads shall also consist of no less than six inches of compacted base course and two inches of asphaltic concrete surface course.
(2) All materials shall be secured from an approved source and shall generally conform to minimum acceptable standards of the Georgia Department of Transportation.
(3) All materials shall be mixed to the extent necessary to produce a thoroughly pulverized and homogeneous mixture.
(4) As soon as the base material has been spread and mixed, the base shall be brought to approximate line, grade and cross-section and then rolled with a sheepsfoot or other approved roller until full thickness of the base course has been compacted thoroughly. Defects shall be remedied as soon as they are discovered.
(5) The base course shall be maintained under traffic and kept free from ruts, ridge and dusting, true to grade and cross-section until it is primed.
(6) No base material shall be deposited or shaped when the subgrade is frozen or thawing or during unfavorable weather conditions.
(m) Pavement: Wearing surface shall conform to mixes found suitable by the Georgia Department of Transportation, Highway Division, or an independent testing laboratory and shall be applied after prime coat. Unless otherwise approved by the platting authority, pavement shall be constructed as follows:
(1) Bituminous material used for prime coat shall be in accordance with the current edition of the Georgia Department of Transportation Standard Specifications Manual and shall be applied on clean slightly damp surface in the amounts of from 0.15 to 0.30 gallons/square yard, depending on the nature and condition of the surface.
(2) Wearing surface shall consist of either an approved plant mix prepared in accordance with the standards in the current edition of the Georgia Department of Transportation Standard Specifications Manual and shall have a completed minimum compacted thickness of two inches or a triple surface treatment constructed in accordance with section 424 of the current edition of the Georgia Department of Transportation Standard Specifications Manual.
(3) Weather limitations. Comply with the current edition of the Georgia Department of Transportation Standard Specifications Manual.
(4) Care and precaution shall be taken that all joints between the surface mixture and such structures as manholes and curbs are well sealed.
(5) Materials and installation of traffic control devices, such as striping or required signal devices and signage, shall be at the developer's expense and comply with Manual for Uniform Traffic Control Devices.
(n) Guarantee against faulty material and workmanship:
Final approval: Public streets to be accepted by the county will be at the discretion of the governing body. Road acceptance and acceptance of any other dedicated easement to the county shall only be accomplished by written resolution adopted by the governing body at a public meeting; approval of the final plat does not indicate acceptance of roads or easements by the county.
Final approval will be considered upon separate written request by the developer, subdivider or any person or persons who own all fee simple interest in the subject road to the governing body and in accordance with one of the following:
(1) The subdivider shall post with the county a guaranty bond or other surety in an amount equal to 15 percent of the street and utility improvement cost, verified by the county engineer and approved by the governing body for the street for which acceptance is sought. Said bond will guarantee the county that the street has been installed in a workmanlike manner, that it is free from defects caused by faulty materials or workmanship and that the street will remain in acceptable condition for a period of at least 18 months. This bond shall be effective for a period of at least 18 months. At the end of this period, if the street is found to have settled or be otherwise unacceptable because of faulty workmanship or material, the defective street shall be repaired at the expense of the subdivider up to the amount of the bond. Upon his failure or refusal to do so within 90 days after demand is made upon him by the governing body, the county shall make such repairs as are reasonably necessary and recover the cost thereof from the bond issuer.
(2) Certificate of development conformance required: A certificate of development conformance is required for final approval of road system.
The certificate will not be issued until all requirements of these and other applicable regulations have been met. It is also required that the planning department receive a completed request for approval of development conformance, an executed development performance and maintenance agreement and a final inspection report has been done.
(3) Process of road inspection/acceptance: All roads will be inspected at time of construction pursuant to the published procedures as set forth by the planning department. Published procedures will be included with the development application.
(4) Warranty deed required: A warranty deed must be provided by the developer, subdivider or any person or persons who own all fee simple interest in the subject road.
(o) Private roads:
(1) Private roads may, upon application, be permitted by the planning commission within subdivisions subject to the requirements of this section. The planning commission may impose conditions on the approval of private roads to ensure various public purposes and to mitigate potential problems with private roads. No final plat involving a private road shall be approved unless said final plat conforms to the requirements of this section.
(2) It shall be unlawful for any person, firm or corporation to construct a new private road or alter an existing private road or to cause the same to be done without complying with this section provided, however, that this shall not be construed to apply to logging roads (trails) and roads (trails) serving agricultural purposes.
(3) All private roads shall at minimum be constructed to all standards specified in this article except section 68-1722.
(4) Rights-of-way for private roads shall be designated on final plats as general purpose public access and utility rights-of-way along with the name of said private road. Rights-of-way for private roads shall not be included in any calculation of minimum lot size established by this chapter. Private road rights-of-way shall be shown on the final plat as a discrete parcel to be dedicated to a private homeowners association or other appropriate group (i.e., not shown to be a part of any lot).
(5) Habersham County shall have no responsibility to maintain, repair, resurface, rebuild, or otherwise improve private roads, signs, drainage improvements or any other appurtenances within general purpose public access and utility rights-of-way established for private roads. A private maintenance covenant recorded with the office of the Clerk of the Superior Court of Habersham County shall be required for any private road and other improvements within general purpose public access and utility rights-of-way established for private roads. The covenants shall set out the distribution of expenses, remedies for noncompliance with the terms of the agreement and other pertinent considerations.
(6) The covenant shall specifically include the following terms:
a. The covenant shall establish minimum annual assessments in an amount adequate to defray costs of ordinary maintenance and procedures for approval of additional needed assessments. The covenant shall also specify that the funds from such assessments will be held by a homeowners' or property owners' association or other appropriate group.
b. The covenant shall include a periodic maintenance schedule.
c. The covenant for maintenance shall be enforceable by any property owner served by the private road.
d. The covenant shall establish a formula for assessing maintenance and repair costs equitably to property owners served by private road.
e. The covenant shall run with the land.
f. The planning commission may, at its discretion, as a condition of approving private roads require a performance bond and/or maintenance bond be submitted by the subdivider and held by a homeowners' or property owners' association or the planning commission may require that the subdivider pay an amount of money as recommended by the county engineer into an escrow account or other suitable account for the maintenance and repair of private roads and storm water management improvements to be drawn from by the homeowners' or property owners' association as maintenance and repair needs may arise.
(p) No final plat involving a private road shall be approved by the planning commission for recording unless and until it shall contain the following on the face of the plat:
(1) Deed book and page reference to the recorded covenant required by this section.
(2) "Warning, Habersham County has no responsibility to build, improve, maintain or otherwise service the private roads, drainage improvements, and other appurtenances contained within the general public purpose access and utility right-of-way or rights-of-ways for private roads shown on this plat."
(3) Grant of right-of-way as displayed in Chapter A, Form 7.
(Ord. of 12-21-2020) Sec. 68-1728. Opening and improving public streets.
The governing body of Habersham County shall not accept, lay out, open, improve, grade, pave or light any street or lay any utility lines in any street which had not attained the status of a public street prior to the effective date of this chapter, unless such street corresponds to the street location shown on an approved subdivision plat or on an official street map adopted by the planning commission.
(Ord. of 12-21-2020) Sec. 68-1729. Access management and connectivity.
(a) Purpose. The purpose of this section is to set standards for the provision of access to development in a manner that preserves the safety and efficiency of the transportation system. The management of access is a means by which substantial public investment in the transportation system can be protected and the need for remedial measures eliminated or reduced.
(b) Access management.
(1) Interparcel access is required between all abutting parking lots and sites based on site conditions and as determined by the Director of Planning and Development to provide a cross-access drive and pedestrian access to allow circulation between sites.
a. Interparcel access is not required between non-residential uses and single-family residential uses or between single-family residential uses.
b. This shall be accomplished by stubbing a connection to each adjacent property line. The property owner shall grant an access easement granting public access through the lot. This easement shall be submitted to the Director of Planning and Development and recorded by the applicant or property owner with the Clerk of the Superior Court of Habersham County.
c. If full access between or among lots is implemented after initial site development, any deficiencies created to formalize the connection are permitted without need for any formal relief through the variance process (e.g.: removing a required parking space to accommodate the connection will render it nonconforming but is permitted to prioritize the connectivity).
d. Shared driveways between properties shall be established wherever feasible along a major thoroughfare, arterial, or collector street.
(2) All developments shall have access to a public right-of-way. Developments serving more than four residential units shall have access points built to county road standards to a public right-of-way. All parcels of a development serving more than four residential units shall have interior access, without need for accessing an outside public right-of-way, to each access point or road. The number of access points or roads shall be in accordance with Table 684729(b)(3).
Table 684729(b)(3) - Minimum Number of Access Points Type of Development Minimum Number of Access Points Residential, 100 or fewer units 1 Residential, 101—300 units 2 Residential, 301—500 units 3 Residential over 500 units 4 Nonresidential, 50,000 sf or less gross floor area 1 Nonresidential, 50,001-200,000 sf gross floor area 2 Nonresidential, 200,001 sf or more gross floor area 2 or more, as determined by the Director of Planning and Development
(3) The separation of access points on a thoroughfare, arterial, or collector road shall be determined by the speed limit of the road with the following minimum spacing requirements in accordance with Table 684729(b)(4).
a. The distance between access points shall be measured from the centerline of the proposed driveway or road to the centerline of the nearest existing adjacent driveway or road.
b. Driveway spacing at intersections and corners shall provide adequate sight distance, response time, and permit adequate queuing space.
c. No driveway, except driveways providing residential access, shall be allowed within 100 feet of the centerline of an intersecting thoroughfare, arterial or collector street.
d. No nonresidential access except right in/right out channelized access shall be allowed within 100 feet of the centerline of any other thoroughfare or arterial.
Chapter 69
RESERVED
Chapter 70
TIMBER HARVESTING
Secs. 70-1—70-100. Reserved.
Sec. 70-101. Notice requirement.
All persons or firms harvesting standing timber in any unincorporated area of Habersham County for delivery as pulpwood, logs, poles, posts or wood chips to any woodyard or processing plant located inside or outside this state shall provide notice of such harvesting operations (hereinafter referred to as "Notice") to the board of commissioners of Habersham County or its designee—the county manager of Habersham County ("hereinafter referred to as "the county") by giving said notice to the county manager for Habersham County prior to entering onto the property, if possible, but in no event later than 24 hours after entering onto the property. Further, such persons shall give notice of cessation of cutting within 24 hours after the job is completed.
(Ord. of 6-19-2023, § 1) Sec. 70-102. Notice content requirements.
Notice shall be provided for each separate tract to be harvested. Such notice shall be made in such form as prescribed by rule or regulation of the Director of the Georgia Forestry Commission and shall include the following information:
(a) A map of the area which identifies the location of the tract to be harvested and, as to those trucks which will be traveling to and from such tract for purposes of picking up and hauling loads of cut forest products, the main point of ingress to such tract from a public road and, if different, the main point of egress from such tract to a public road. If multiple points of ingress and/or ingress will be used, all such points shall be identified;
(b) A statement as to whether the timber will be removed pursuant to a lump sum sale, per unit sale or owner harvest for purposes of ad valorem taxation under O.C.G.A. §48-5-7.5;
(c) The name, address and daytime telephone number of the timber seller if the harvest is pursuant to a lump sum or per unit sale or of the timber owner if the harvest is an owner harvest; and
(d) The name, business address, business telephone number and nighttime or emergency telephone number of the person or firm harvesting such timber.
(Ord. of 6-19-2023, § 1) Sec. 70-103. Initial method of notice.
Subject to the provisions of section 70-105 hereof, notice may be submitted in person, by transmission of an electronic record via telefacsimile or e-mail or by mail.
(Ord. of 6-19-2023, § 1) Sec. 70-104. Initial alternate method of notice.
Subject to the provisions of section 70-105 hereof, upon notification published by the director of the Georgia Forestry Commission that a state-wide notification website or platform is available for public use, persons or firms wishing to utilize said website or platform to provide notice may do so at their option and Habersham County will accept notifications submitted in this manner.
(Ord. of 6-19-2023, § 1) Sec. 70-105. Mandatory method of notice when applicable.
On and after a date specified and published by the director of the Georgia Forestry Commission, use of the state-wide notification website or platform shall be mandatory and shall be the sole means of providing the notice; on and after said date, submission of the notice by any of the means listed in section 70-103 above shall cease and will no longer be deemed acceptable or in compliance with this Code section.
(Ord. of 6-19-2023, § 1) Sec. 70-106. Surety bond requirement.
The notice shall not be or remain effective unless and until the person or firm providing such notice has delivered to the county a valid surety bond, executed by a surety corporation authorized to transact business in this state, protecting Habersham County against any damage caused by such person or firm in the amount of $5,000.00; provided, however, that at the option of the person or firm harvesting timber, a valid irrevocable letter of credit issued by a bank or savings and loan association as defined in O.C.G.A.
§7-1-4 in the amount of $5,000.00 may be provided in lieu of a surety bond.
Such bonds or letters of credit shall be subject to the conditions set forth in sections 70-107 and 70-108 of this section. No more than one bond or letter of credit shall be required from each person or firm harvesting timber, regardless of the number of tracts harvested in the county for so long as the bond or letter of credit remains in effect. The bond or letter of credit required herein shall be valid only for the calendar year in which it was delivered.
(Ord. of 6-19-2023, § 1) Sec. 70-107. Call of bond or letter of credit.
The bond or letter of credit required by section 70-106 of this section shall protect Habersham County against any damage requiring re-ditching or repair of existing ditch structures or the removal of any harvesting residue, including treetops, debris, logs, pulpwood and other materials, placed in or around the county's rights-of-way caused by such person or firm tendering the bond or letter of credit. The proceeds of such bond or letter of credit shall be available to reimburse the county for any cost incurred to repair such damage or remove such debris in or around the county's rights-of-way. The proceeds of such bond or letter of credit shall also be available to reimburse the county for any costs incurred to maintain or repair county roads damaged by the ingress or egress of motor vehicles engaged in the harvest operations located within 500 feet of any point of ingress or egress of the timber harvesting operation. The right of Habersham County to call such bond or letter of credit in accordance with the provisions of sectin 70-108 of this section shall be in addition to any other remedies available to the county at law or in equity for damage to county roads or rights-of-way.
(Ord. of 6-19-2023, § 1) Sec. 70-108. Right to repair upon claim against surety.
When damage results from a person or firm's harvesting activities, the county shall make and provide a written claim to the person or firm causing the damage within 30 business days after the county becomes aware of the damage. Such claim may be given in person, by telefacsimile, email or mail.
The claim shall describe the damage in detail and, in compliance with section 70-109(a) of this section, give the person or firm the opportunity to repair such damage within 30 days of the notification; provided, however, the county shall be authorized to repair the damage immediately if the county determines the conditions present a threat to public safety, health or welfare and, upon making such repairs, shall present to the person or firm and the issuer of the applicable bond or letter of credit an itemized list of expenses incurred as a claim against the responsible party and the issuer of its bond or letter of credit. Upon the issuance of a claim as provided in this section the county shall notify the issuer of the bond or letter of credit that a claim has been made and will be resolved or adjudicated according to the terms of this section.
(Ord. of 6-19-2023, § 1) Sec. 70-109. Repair acceptance, extensions on time to repair, appeals.
Within 30 days of receipt of the written claim described in section 70-108, the person or firm against whom the claim is submitted may:
(a) Repair such damage at his or its own expense with the approval and supervision of the county. When repairs are completed to the satisfacTIMBER HARVESTING § 70-109 tion of the county, the county shall provide a written notification of satisfactory completion within five business days to the responsible person or firm and to the surety issuing the bond or the bank issuing the letter of credit, thereby terminating the claim.
(b) In the event of inclement weather or other factors preventing repair of the damage, request a 30 day extension to repair the damage from the county, provided that no extensions shall exceed 90 days from the date the claim was tendered. Approval of any extension shall be at the discretion of the county.
(c) Appeal the claim to the Magistrate Court of Habersham County. Any such appeal must name the issuer of the bond or letter of credit as a party, who shall be served with all pleadings in the action and shall have the right to appear. The court will hear evidence and arguments within 30 days of the written appeal and issue a ruling within ten days of such hearing. Any such appeal shall toll the 30 day period, or any extension thereof, required by section 70-108 of this section. If the court rules in favor of the person or firm against whom the claim was made, the county shall have no right to recover any proceeds of the bond or letter of credit and judgment shall be entered against the county. If the court rules in favor of the county, the court shall determine the amount of damages to which the county is entitled to recover and enter judgment accordingly; the county shall be authorized to call the bond or letter of credit and recover from the proceeds thereof an amount equal to the judgment entered by the court up to the total amount of the bond or letter of credit. The portion of any judgment entered in favor of the county that exceeds the amount of the bond or letter of credit shall be subject to collection by any additional remedies at law or equity.
(d) In the event the person or firm against whom the claim has been submitted fails to take any of the actions allowed under subparagraphs (a), (b) or (c) of this paragraph within the time required therein, such person or firm shall be deemed to have waived any and all rights to contest the call of the bond or letter of credit.
(Ord. of 6-19-2023, § 1) Sec. 70-110. Annual renewal of surety.
If the person or firm tendering a bond or letter of credit pursuant to the requirements of this section continues its timber harvesting operation beyond the calendar year in which the bond or letter of credit was issued, the person or firm continuing the timber harvesting operation shall tender a new bond or letter of credit within five business days after the first day of the new calendar year.
(Ord. of 6-19-2023, § 1) Sec. 70-111. Requirements upon revocation of surety.
In the event a bond or letter of credit tendered pursuant to the requirements of this section is revoked by the surety or bank, then a valid replacement bond or letter of credit must be delivered to the county within five business days after the date of revocation in order for timber harvesting operations to continue. In addition, if the person or firm tendering the bond or letter of credit caused its revocation, the amount of the bond or letter of credit required shall be increased to $7,500.00 after the first revocation and $10,000.00 after a second revocation caused by the person or firm tendering the bond or letter of credit. The maximum amount of the bond or letter of credit shall not exceed $10,000.00.
(Ord. of 6-19-2023, § 1) Sec. 70-112. Authority of notice; amendment thereof.