13.10. The county reserves the right to specify an

About this text

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

existing manufacturer and/or existing model numbers as minimum standards of these factors.

B. For a sewerage system, the owner shall build a sewerage system that, at 80 percent of capacity, will adequately handle the sewage processing needs of 100 percent of the prespecified number of reuse users. The county reserves the

right to use the remaining 20 percent of the capacity of the sewerage system in any way that it sees fit, including contingency.

C. The owner is responsible for operation and maintenance of the sewerage system and reuse system, including all costs, unless the county accepts responsibility for operation and maintenance of the sewerage system and reuse system.

D. All persons obtaining reuse water from a reuse system must do so in accordance with:

1. The permit of the county,

2. Any written reuse user agreement between the county and the user of the reuse water, and

3. The established public education program for the use of reuse water.

History

The history line the source prints at the end of the section.

(Res. of 1-8-09(2), §§ 1, 2(Exh. A))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hall-county/code/13.10@2026-05-28-f656578a04

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.