Hall County · Code of Ordinances
Part III - ETHICS BOARD / Title 13 - PUBLIC SERVICES* / Chapter 13.20 - CONSTRUCTION STANDARDS AND OPERATIONAL RESPONSIBILITIES FOR SEWERAGE SYSTEMS AND FOR REUSE SYSTEMS
13.10. The county reserves the right to specify an
About this text
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
existing manufacturer and/or existing model numbers as minimum standards of these factors.
B. For a sewerage system, the owner shall build a sewerage system that, at 80 percent of capacity, will adequately handle the sewage processing needs of 100 percent of the prespecified number of reuse users. The county reserves the
right to use the remaining 20 percent of the capacity of the sewerage system in any way that it sees fit, including contingency.
C. The owner is responsible for operation and maintenance of the sewerage system and reuse system, including all costs, unless the county accepts responsibility for operation and maintenance of the sewerage system and reuse system.
D. All persons obtaining reuse water from a reuse system must do so in accordance with:
1. The permit of the county,
2. Any written reuse user agreement between the county and the user of the reuse water, and
3. The established public education program for the use of reuse water.
History
(Res. of 1-8-09(2), §§ 1, 2(Exh. A))
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.