Hall County · Code of Ordinances
Part III - ETHICS BOARD / Title 13 - PUBLIC SERVICES* / Chapter 13.10 - SEWERS AND SEWAGE DISPOSAL / Article I - PUBLIC SEWERS
13.10.1110. Owners required to connect.
About this text
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Provided a parcel of property abuts on any county property, street, alley, easement or rightof-way in which there is located a public sanitary sewer within 500 feet of the property line:
1. The owner(s) for which a building permit is issued after the effective date of this chapter for a new structure which is to have wastewater disposed therein, is hereby required at the owner(s) expense to connect directly with the proper public sewer for the disposition of all wastewater unless otherwise authorized by the county, in accordance with the provisions of this article, prior to the issuance of a certificate of occupancy by Hall County for said structure.
2. For all structures for which a building permit has been issued prior to the effective date of this chapter, required connection to and use for disposition of all wastewater via the public sewer may be
delayed until such time as the on-site sewage management system fails to work properly and it requires replacement.
3. Unless approved by the director, all replaced on-site sewage management systems shall be either removed or cleaned of sludge and filled with suitable material within ten days of connection to the public sewer.
Approval by the building official and by the Hall County Health Department is required for any such connection to the public sewer.
History
(Res. of 1-8-09(1), §§ 1, 2(Exh. A); Res. of 6-28-18, § 1 (Exh. A))
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.