Skip to content
Georgia Commons
Menu

Hall County · Code of Ordinances

Part III - ETHICS BOARD / Title 13 - PUBLIC SERVICES* / Chapter 13.10 - SEWERS AND SEWAGE DISPOSAL / Article I - PUBLIC SEWERS

13.10.1310. Pretreatment facilities requirements.

About this text

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Permitted users shall provide necessary wastewater treatment as required to comply with this article and shall achieve compliance with all

categorical pretreatment standards, local limits and the prohibitions set out in sections 13.10.1200 through 13.10.1260 of this chapter within the time limitations specified by the EPA, the state, or the director, whichever is more stringent. Any facilities required to pretreat wastewater to a level acceptable to the control authority shall be provided, operated and maintained at the user's expense. Detailed plans and drawings showing the pretreatment facilities and operating procedures shall be submitted to the county for review, and shall be acceptable to the director before

construction of the facility. The review of such plans and operating procedures will in no way relieve the user from the responsibility of modifying the facility as necessary to produce an acceptable discharge to the county under the provisions of this article.

History

The history line the source prints at the end of the section.

(Res. of 1-8-09(1), §§ 1, 2(Exh. A))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hall-county/code/13.10.1310@2026-05-28-c2b2b7dddb

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hall County Code of Ordinances, 13.10.1310. Pretreatment facilities requirements | Georgia Commons