--- title: Hall County Code of Ordinances, 13.10.1330. Use by textile plants collection: local-codes id: local-code:hall-county/code/13.10.1330 cite_as: Hall County, Ga., Code of Ordinances § 13.10.1330 canonical_url: https://georgiacommons.org/counties/hall/code/13.10.1330 md_url: https://georgiacommons.org/counties/hall/code/13.10.1330.md text_url: https://georgiacommons.org/counties/hall/code/13.10.1330/text source_url: https://library.municode.com/ga/hall_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:hall jurisdiction_name: Hall County county_fips: "13139" corpus_version: local-codes-hall-county-fec03cfd98ae publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/hall/code/~part-iii/~title-13/~chapter-13.10/~article-i.md previous: https://georgiacommons.org/counties/hall/code/13.10.1320.md next: https://georgiacommons.org/counties/hall/code/13.10.1340.md index: https://georgiacommons.org/counties/hall.md branch: code edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:hall-county/code/13.10.1330@2026-05-28-b84b919650 --- # Hall County Code of Ordinances, 13.10.1330. Use by textile plants > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - ETHICS BOARD / Title 13 - PUBLIC SERVICES* / Chapter 13.10 - SEWERS AND SEWAGE DISPOSAL / Article I - PUBLIC SEWERS A. No person engaged in the processing of textile products or fibers shall empty any sewage or waste from such textile processing plant into the sewer system of the control authority without: (1) Screening said waste through a screen sufficiently fine to remove such fibers from the effluent; (2) Equalizing the flow of its waste into the control authority sewer system to a point, whereby the rate of flow into the sewer shall not be greater than the rate of flow of potable water into the plant; and (3) Securing the prior approval of the director before introducing dyes into the sewer system. B. The following materials are incompatible to the operation of the control authority's treatment plant and shall not be permitted to be introduced into the control authority's sewer system: (1) Nonbiochemical degradable fibers; (2) Latex or latex compounds; and (3) Rubber or rubber compounds. ## History (Res. of 1-8-09(1), §§ 1, 2(Exh. A))