All industrial users, including significant industrial users, feed mills, vehicle maintenance facilities, service stations, and commercial facilities, including food preparation facilities proposing to connect to, or discharge into any part of the wastewater treatment system must first obtain a wastewater discharge permit. All existing significant industrial users and other industrial users connected to, or discharging to, any part of the county system must also obtain a wastewater discharge permit. Prior to issuing a discharge permit, a draft permit will be sent to the user (certified mail return receipt requested) which will show the conditions and discharge limitations. The user will be allowed 15 days to show cause why in the user's opinion the conditions of such permit should not be required. A. Permit application. All significant industrial users and other industrial users shall discharge wastewater only in accordance with the conditions of their wastewater discharge permit. All applications must contain the following certification statement and be signed by an authorized representative of the user. "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Users seeking a wastewater discharge permit shall complete and file with the director an application on the form prescribed by the director. The director will evaluate the data furnished by the user and may require additional information. After evaluation and acceptance of the data furnished, the director may issue a wastewater discharge permit subject to terms and conditions provided herein. B. Permit conditions. Wastewater discharge permits shall be expressly subject to all provisions of this article and all other regulations, user charges and fees established by the county. Permits may contain the following: (1) Limits on average and maximum rate and time of discharge or requirements for flow regulations and equalization; (2) Limits on the average and maximum wastewater constituents and characteristics; (3) Specifications for monitoring programs which may include sampling locations, frequency of sampling, number, types and standards for tests, resampling requirements and reporting schedule; (4) Requirements for submission of technical reports or discharge reports; (5) Requirements for retaining plant records relating to wastewater discharge; (6) Requirement of penalties for falsifying information; (7) Requirements for installation and maintenance of inspection and sampling facilities; (8) Requirement for written standard operating procedures for all pretreatment facilities; (9) Requirements for notification to the county of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the wastewater treatment system; (10) Requirements for the installation of facilities or procedures to prevent and control accidental discharge or spills at the user's premises; (11) Requirement for notification of any bypasses around treatment systems; (12) Requirements for notification of slug discharges; (13) Requirement of a written spill prevention/contingency plan; (14) Requirements for notification of any ordinance violations; (15) The unit charge or schedule of user charges and fees for the wastewater to be discharged to a public sewer; (16) Statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements; (17) Compliance schedules; (18) Statement of duration; (19) Statement of nontransferability; and (20) Other conditions as deemed appropriate by the county to ensure compliance with this article. C. Duration of permits. Permits shall be issued for a specified time period, not to exceed three years. A permit may be issued for a period of less than three years, or may be stated to expire on a specific date. If the user is not notified by the director 30 days prior to the expiration of the permit, the permit shall automatically be extended for one month. The terms and conditions of the permit may be subject to modification and change by the director during the life of the permit, as limitations or requirements are modified and changed as outlined in Paragraph E. of this section. The user shall be informed of any proposed changes in his permit at least 30 days prior to the effective date of change. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance and shall be subject to the appeal provisions contained in Paragraph E. of this section. A user becoming subject to national categorical pretreatment standards shall apply for a new permit on the effective date of said standards. D. Transfer of a permit. Wastewater discharge permits are issued to a specific user for a specific operation. A wastewater discharge permit shall not be reassigned, transferred, or sold to a new owner, new user, different premises, or a new or changed operation. In the event of any change in control or ownership of facilities from which the authorized discharges emanate, the industrial user shall notify the succeeding owner or controller of the existence of the wastewater discharge permit by letter, a copy of which shall be forwarded to the Hall County Public Works and Utilities Director. Upon such notification, the director will require a new permit application to be submitted and issue a permit in accordance with the terms of this article. E. Authority to modify, suspend, or revoke permits. The director may modify, suspend or revoke a permit issued pursuant to this article in whole or in part during its term for failure or refusal of the permittee to carry out the requirements of this article, wastewater discharge permit, compliance order, or any other pretreatment standard or requirement. (1) Wastewater discharge permits may be modified for good cause including, but not limited to, the following: (a) Incorporation of any new or revised federal, state, or local pretreatment standards or requirements; (b) Addressing significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance; (c) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge; (d) Information indicating that the permitted discharge poses a threat to the control authority's POTW, control authority personnel, or the receiving waters; (e) Violation of any terms or conditions of the wastewater discharge permit; (f) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting; (g) Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13; (h) Correction of typographical or other errors in the wastewater discharge permit; or (i) Transfer of the facility ownership or operation to a new owner or operator. The filing of a request by the permittee for a wastewater discharge permit modification does not stay any wastewater discharge permit condition. (2) Wastewater discharge permits may be revoked for the following reasons: (a) Failure to notify the county of significant changes to the wastewater prior to the changed discharge; (b) Failure to provide prior notification to the county of changed condition pursuant to section 13.10.1450; (c) Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application; (d) Falsifying self-monitoring reports; (e) Tampering with monitoring equipment; (f) Refusing to allow the county timely access to the facility premises and records; (g) Failure to meet effluent limitations; (h) Failure to pay fines; (i) Failure to pay sewer charges; (j) Failure to meet compliance schedules; (k) Failure to complete a wastewater survey or the wastewater discharge permit application; (l) Failure to provide advance notice of the transfer of a permitted facility; and (m) Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit of this article. If within ten days following receipt of notice of such proposed modifications, suspension or revocation from the director, there is no objection by the permittee in writing, said action becomes final. If the permittee files with the director an objection in writing within the specified ten-day period, such permittee shall be granted a conference with the director to discuss the proposed modifications, suspension, or revocation and to attempt to reach some agreement upon them. In the event that agreement is not reached, the director shall notify the permittee in writing that he proposes that the modifications, suspension, or revocation become final within three days if the permittee does not object in writing. If the permittee does not object in writing, the proposed modifications, suspension or revocation shall become final. If the permittee does object in writing by filing an objection with the director and the Hall County Board of Commissioners, the permittee shall be granted a hearing before the board of commissioners. The board of commissioners shall decide whether the proposed modifications, suspension or revocation of the director shall become final. The director may immediately suspend or revoke a permit issued pursuant to this section, in whole or in part, without the notice provisions set forth in the preceding paragraph, provided the director concludes that the permittee has violated the provisions of this article and that the continued violation would constitute a hazard to human or animal life, or the environment or to the stream or watercourse receiving the treatment plant effluent, or would not be susceptible to treatment by the POTW, or which otherwise may create a hazard to life or constitute a public nuisance. Wastewater discharge permits shall be voidable upon nonuse, cessation of operations, or transfer of business ownership. All wastewater discharge permits are void upon the issuance of a new wastewater discharge permit. A terminated permit under any of the provisions set forth in this article shall mean the user shall not discharge process wastewater into the control authority's sewerage system. F. Wastewater survey. Any commercial user may be required to complete a wastewater survey questionnaire as requested by the director. G. Slug control plan. On a biennial basis, the county conducts a survey to determine the need for industrial users to develop a program to control slug discharges. A slug discharge is any discharge of a nonroutine, episodic nature, including but not limited to, an accidental spill or a noncustomary batch discharge. If the county decides that a slug control plan is needed, the plan shall contain, at a minimum, the following elements: (1) Description of discharge practices, including nonroutine batch discharges; (2) Description of stored chemicals; (3) Procedures for immediately notifying the POTW of slug discharges, including any discharge that would violate a prohibition under 40 CFR 403.5(b), with procedures for follow-up written notification within five days; (4) If necessary, procedures to prevent adverse impact from accidental spills, including inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and measures and equipment for emergency response.