It is the industry's responsibility to maintain accurate sewage flow measurements at all times and under all flow conditions, and to provide such information as required by the county to demonstrate that this requirement is being met. If the industry cannot prove to the county's satisfaction that accurate sewage flows are being maintained at all times, then the county shall base all wastewater treatment charges, surcharges or penalties on the water consumption metered on the water meter. If the county has reason to believe that metered consumption does not reflect the total volume of wastewater being discharged, the county reserves the right to use its own sewage flow monitoring data or historical data, as deemed necessary by the director, to determine wastewater discharge. No allowances for adjusted sewer flows will be allowed unless otherwise agreed to in writing by the director. To allow for sewer billing adjustments, all plans, specifications and equipment shall be submitted to and accepted by the county. The industry shall allow 30 days for the county's review and comments. When a user has an alternate water supply or other source of water such that the volume of wastewater generated is greater than the volume of metered water purchased, the county may require that a flowmeter be installed. When deemed necessary by the director or entered into agreement by the director and user, the county may maintain sewage flow measurement equipment with all costs borne to the industrial user.